When to Plant Komatsuna in Nicholas County, WV
Your May gardening checklist
A quick May briefing for Nicholas County, West Virginia gardeners — what's urgent, what's next, and what can wait.
-
Get komatsuna in the ground
Bring a watering can to the bed. Each transplant gets a drink the moment it's in the ground, not ten minutes later.
June will be here before you know it — start on
- Starting indoors: komatsuna
- First harvests: komatsuna
Komatsuna (Japanese mustard spinach) is a versatile Asian green with glossy, dark leaves and a mild, sweet flavor. It is extremely cold-hardy and heat-tolerant.
Nicholas County, West Virginia is in USDA Zone 6b. The average last spring frost is May 4 and the first fall frost is October 17, giving you a growing season of approximately 166 days.
At an elevation of 2,348 feet, Nicholas County receives approximately 46.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 90°F, providing good warmth for Komatsuna during the growing season.
Nicholas County Soil Profile
Soil Type
Silt Loam
Soil pH
5.8-6.9
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Nicholas County
How your county's soil matches Komatsuna's growing requirements.
Soil pH
Your soil pH (5.8–6.9) overlaps with Komatsuna's range (6.0–7.5), though not a perfect match.
Soil Texture
The silt loam soil in Nicholas County is excellent for Komatsuna — good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Komatsuna.
Organic Matter
Organic matter is moderate (3.0%). Annual compost additions will help Komatsuna.
How to Plant Komatsuna
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Komatsuna
Sow every 4 weeks. Last sowing by Aug 28 to harvest before frost.
For a dedicated fall crop, sow by Aug 08.
Plant Water Budget
Monthly Watering Guide for Komatsuna
Komatsuna needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Komatsuna Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 4.4" | 0" | ❄️ Dormant |
| Feb | — | 3.8" | 0" | ❄️ Dormant |
| Mar | — | 4.6" | 0" | ❄️ Dormant |
| Apr | — | 3.9" | 0" | ❄️ Dormant |
| May | 4.3" | 4" | 0.3" | 💧 Light watering |
| Jun | 4.3" | 3.8" | 0.5" | 💧 Light watering |
| Jul | 4.3" | 4.4" | 0" | ✅ Rainfall sufficient |
| Aug | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| Sep | 4.3" | 3.4" | 0.9" | 💧 Light watering |
| Oct | 4.3" | 3" | 1.3" | 💧 Light watering |
| Nov | — | 3.3" | 0" | ❄️ Dormant |
| Dec | — | 3.5" | 0" | ❄️ Dormant |
Water needs are for active growing months only (May–Oct in Nicholas County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Komatsuna Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Komatsuna Planting Timeline — Nicholas County, WV
Komatsuna Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 30 | Mar 30 – Apr 13 |
| Transplant Outdoors | May 4 | May 4 – May 18 |
| Direct Sow | April 20 | Apr 20 – May 11 |
| Harvest | June 8 | Jun 8 – Jul 13 |
| Fall Sowing | August 8 | Aug 8 – Aug 22 |
Plant 0.5" deep · 6" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | Start Indoors |
| April | Start Indoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Harvest |
| August | Fall Sowing |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · Natural rainfall sufficient
📅 Days to Maturity
35–50 days
🧪 Soil pH
Needs 6–7.5 · Your soil: acceptable
🗺️ USDA Zone
Zone 6b
📆 Growing Season
166 days in Nicholas County
Growing Tips for Komatsuna in Nicholas County
Direct sow Komatsuna outdoors after May 04 in Nicholas County when soil has warmed and frost danger has passed.
Your generous 166.0-day season in Nicholas County allows multiple plantings of Komatsuna. Sow every 17.0 days for continuous harvest.
Common pests for Komatsuna in this region include cabbage worm and flea beetles. Use row covers early in the season and inspect plants weekly.
General growing tips
Direct sow in spring or fall. One of the most forgiving Asian greens for all seasons. Harvest outer leaves or cut whole plants. Excellent for stir-fries, soups, or salads.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Komatsuna in Other Locations
Frequently Asked Questions
When should I plant Komatsuna in Nicholas County, WV?
Nicholas County is in Zone 6b with an average last frost of May 4. Plan your Komatsuna planting based on this frost date — see the calendar above for exact timing.
What planting zone is Nicholas County, WV?
Nicholas County, West Virginia is in USDA Hardiness Zone 6b. The average last spring frost is May 4 and first fall frost is October 17.
Your Nicholas County Garden Planner — Free
A 24-page printable planner built for Nicholas County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.