Blog

When to Plant Sorrel in Churchill County, NV

Churchill County, Nevada Zone 7a May

Your May planting checklist for Churchill County, Nevada

Welcome to May in Zone 7a. These are the moves that will have the biggest impact on your growing season.

Avg. last frost May 8
Avg. first frost October 7
Soil temp (4") 46°F
Watering Critical
Pest pressure Low
Daylight 14.2 hrs
  1. Move sorrel from tray to bed

    Your last frost (May 8) has passed. These warm-season crops can handle outdoor soil now.

Get ahead of June
  • Starting indoors: sorrel
  • First harvests: sorrel

Instant PDF download. No spam, unsubscribe any time.

Sorrel is a perennial herb with tangy, lemon-flavored arrow-shaped leaves. It is one of the first greens to emerge in spring and is used in soups and salads.

Churchill County, Nevada is in USDA Zone 7a. The average last spring frost is May 8 and the first fall frost is October 7, giving you a growing season of approximately 152 days.

At an elevation of 5,306 feet, Churchill County receives approximately 8 inches of rainfall annually with predominantly sandy loam soil. Summer highs average 99°F, so Sorrel may need afternoon shade and extra watering during peak heat. Sandy soil warms quickly in spring — great for early planting — but Sorrel will need more frequent watering and organic matter to retain nutrients. With low rainfall, drip irrigation is essential for growing Sorrel successfully. Mulch heavily to conserve soil moisture.

Churchill County, NV (Zone 7a) Moderate season
152 days
Last Spring Frost May 8
152 growing days
First Fall Frost October 7

Churchill County Soil Profile

Soil Type

Sandy Loam

Soil pH

6.9-8.3

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (57 days to spare)
Start indoors: Mar 25 Transplant: Apr 22 🍅 Harvest: Jun 3 – Aug 5
Recommended (50%) ✓ Fits season (54 days to spare)
Start indoors: Apr 3 Transplant: May 1 🍅 Harvest: Jun 12 – Aug 14
Safe Start (90%) ✓ Fits season (48 days to spare)
Start indoors: Apr 28 Transplant: May 26 🍅 Harvest: Jul 7 – Sep 8

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Churchill County

How your county's soil matches Sorrel's growing requirements.

Soil pH

Your soil pH (6.9–8.3) is more alkaline than Sorrel prefers (5.5–7.0). Add sulfur or peat moss to lower pH.

Soil Texture

Sandy soil in Churchill County warms quickly in spring but drains fast. Sorrel will need more frequent watering and regular compost additions to retain nutrients.

Organic Matter

Organic matter is low (0.9%). Add 2-3 inches of compost before planting Sorrel.

How to Plant Sorrel

0.5"
Planting Depth
8"
Between Plants
12"
Between Rows

Fall planting: Sow 10 weeks before your first frost date for a fall harvest.

Succession Planting Sorrel

4
successive plantings in your 152-day season

Sow every 4.6 weeks. Last sowing by Aug 08 to harvest before frost.

For a dedicated fall crop, sow by Jul 29.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.2″/week
You supply
0.9″/week
Watering frequency 2-3 times/week
Season total 1,265 gal / 100 sq ft
Drought risk

Water stress score is 8/10 — consider drought-tolerant varieties and mulching

Monthly Watering Guide for Sorrel

Sorrel needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Sorrel Needs Rainfall You Supplement Action
Jan 0.5" 0" ❄️ Dormant
Feb 0.5" 0" ❄️ Dormant
Mar 0.5" 0" ❄️ Dormant
Apr 0.3" 0" ❄️ Dormant
May 4.3" 0.2" 4.1" 🚿 Regular watering
Jun 4.3" 0.3" 4" 🚿 Regular watering
Jul 4.3" 1.4" 2.9" 🚿 Regular watering
Aug 4.3" 1.5" 2.8" 🚿 Regular watering
Sep 4.3" 1" 3.3" 🚿 Regular watering
Oct 4.3" 0.8" 3.5" 🚿 Regular watering
Nov 0.5" 0" ❄️ Dormant
Dec 0.5" 0" ❄️ Dormant

Water needs are for active growing months only (May–Oct in Churchill County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Sorrel Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Sorrel needs ~1,212 GDD — county provides 3,686 GDD Excellent fit

Sorrel Planting Timeline — Churchill County, NV

Sorrel Planting Calendar

Activity When Date Range
Start Indoors April 3 Apr 3 – Apr 17
Transplant Outdoors May 1 May 1 – May 15
Direct Sow April 24 Apr 24 – May 15
Harvest June 12 Jun 12 – Aug 14
Fall Sowing July 29 Jul 29 – Aug 12

Plant 0.5" deep · 8" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April Start Indoors Direct Sow
May Transplant Outdoors Direct Sow
June Harvest
July Fall Sowing Harvest
August Fall Sowing Harvest
September
October
November
December

Growing Conditions

☀️ Sun

Partial Shade (3-6 hours)

💧 Water

1"/week · 2-3 times/week

📅 Days to Maturity

40–60 days

🧪 Soil pH

Needs 5.5–7 · Your soil: too_alkaline

🗺️ USDA Zone

Zone 7a

📆 Growing Season

152 days in Churchill County

Growing Tips for Sorrel in Churchill County

Direct sow Sorrel outdoors after May 08 in Churchill County when soil has warmed and frost danger has passed.

Sandy soil in Churchill County dries quickly — mulch Sorrel with 2-3 inches of straw and water deeply 2-3 times per week rather than lightly every day.

With summer highs reaching 99°F in Churchill County, provide afternoon shade for Sorrel and water deeply in the morning.

Your generous 152.0-day season in Churchill County allows multiple plantings of Sorrel. Sow every 20.0 days for continuous harvest.

Churchill County receives only 8" of rain annually. Sorrel needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.

General growing tips

Direct sow in early spring or fall. Remove flower stalks promptly to encourage leaf production. Divide clumps every 3-4 years. Young leaves have the best flavor.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Sorrel in Churchill County, NV?

Churchill County is in Zone 7a with an average last frost of May 8. Plan your Sorrel planting based on this frost date — see the calendar above for exact timing.

What planting zone is Churchill County, NV?

Churchill County, Nevada is in USDA Hardiness Zone 7a. The average last spring frost is May 8 and first fall frost is October 7.

🌱

Your Churchill County Garden Planner — Free

A 24-page printable planner built for Churchill County (Zone 7a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Churchill County, NV. Local conditions may vary. Last updated: May 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.