Blog

When to Plant Komatsuna in Bates County, MO

Komatsuna (Japanese mustard spinach) is a versatile Asian green with glossy, dark leaves and a mild, sweet flavor. It is extremely cold-hardy and heat-tolerant.

Bates County, Missouri is in USDA Zone 6a. The average last spring frost is April 9 and the first fall frost is October 25, giving you a growing season of approximately 199 days.

At an elevation of 1,397 feet, Bates County receives approximately 39 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86ยฐF, providing good warmth for Komatsuna during the growing season.

Bates County, MO (Zone 6a) Moderate season
199 days
Last Spring Frost April 9
199 growing days
First Fall Frost October 25

Bates County Soil Profile

Soil Type

Silt Loam

Soil pH

5.4-6.8

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (129 days to spare)
Start indoors: Feb 26 Transplant: Apr 2 🍅 Harvest: May 7 – Jun 11
Recommended (50%) ✓ Fits season (129 days to spare)
Start indoors: Mar 5 Transplant: Apr 9 🍅 Harvest: May 14 – Jun 18
Safe Start (90%) ✓ Fits season (130 days to spare)
Start indoors: Mar 15 Transplant: Apr 19 🍅 Harvest: May 24 – Jun 28

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Bates County

How your county's soil matches Komatsuna's growing requirements.

Soil pH

Your soil pH (5.4โ€“6.8) overlaps with Komatsuna's range (6.0โ€“7.5), though not a perfect match.

Soil Texture

The silt loam soil in Bates County is excellent for Komatsuna โ€” good drainage, moisture retention, and nutrient holding capacity.

Drainage

Drainage is adequate for Komatsuna.

Organic Matter

Organic matter is moderate (3.0%). Annual compost additions will help Komatsuna.

How to Plant Komatsuna

0.5"
Planting Depth
6"
Between Plants
12"
Between Rows

Fall planting: Sow 10 weeks before your first frost date for a fall harvest.

Succession Planting Komatsuna

6
successive plantings in your 199-day season

Sow every 4 weeks. Last sowing by Sep 05 to harvest before frost.

For a dedicated fall crop, sow by Aug 16.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.8″/week
Watering frequency Natural rainfall sufficient
Season total 0 gal / 100 sq ft
Drought risk

Water stress score is 6/10 โ€” consider drought-tolerant varieties and mulching

Monthly Watering Guide for Komatsuna

Komatsuna needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Komatsuna Needs Rainfall You Supplement Action
Jan โ€” 1.6" 0" โ„๏ธ Dormant
Feb โ€” 2" 0" โ„๏ธ Dormant
Mar โ€” 3.2" 0" โ„๏ธ Dormant
Apr 4.3" 4.4" 0" โœ… Rainfall sufficient
May 4.3" 4.1" 0.2" ๐Ÿ’ง Light watering
Jun 4.3" 4.8" 0" โœ… Rainfall sufficient
Jul 4.3" 3.9" 0.4" ๐Ÿ’ง Light watering
Aug 4.3" 3.9" 0.4" ๐Ÿ’ง Light watering
Sep 4.3" 3.2" 1.1" ๐Ÿ’ง Light watering
Oct 4.3" 2.9" 1.4" ๐Ÿ’ง Light watering
Nov โ€” 2.9" 0" โ„๏ธ Dormant
Dec โ€” 2.1" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Aprโ€“Oct in Bates County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Komatsuna Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Komatsuna needs ~616 GDD — county provides 2,885 GDD Excellent fit

Komatsuna Planting Timeline โ€” Bates County, MO

Komatsuna Planting Calendar

Activity When Date Range
Start Indoors March 5 Mar 5 โ€“ Mar 19
Transplant Outdoors April 9 Apr 9 โ€“ Apr 23
Direct Sow March 26 Mar 26 โ€“ Apr 16
Harvest May 14 May 14 โ€“ Jun 18
Fall Sowing August 16 Aug 16 โ€“ Aug 30

Plant 0.5" deep ยท 6" apart ยท Rows 12" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March Start Indoors Direct Sow
April Transplant Outdoors Direct Sow
May Harvest
June Harvest
July โ€”
August Fall Sowing
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Partial Shade (3-6 hours)

๐Ÿ’ง Water

1"/week ยท Natural rainfall sufficient

๐Ÿ“… Days to Maturity

35โ€“50 days

๐Ÿงช Soil pH

Needs 6โ€“7.5 ยท Your soil: acceptable

๐Ÿ—บ๏ธ USDA Zone

Zone 6a

๐Ÿ“† Growing Season

199 days in Bates County

Growing Tips for Komatsuna in Bates County

Direct sow Komatsuna outdoors after April 09 in Bates County when soil has warmed and frost danger has passed.

Your generous 199.0-day season in Bates County allows multiple plantings of Komatsuna. Sow every 17.0 days for continuous harvest.

Common pests for Komatsuna in this region include cabbage worm and flea beetles. Use row covers early in the season and inspect plants weekly.

General growing tips

Direct sow in spring or fall. One of the most forgiving Asian greens for all seasons. Harvest outer leaves or cut whole plants. Excellent for stir-fries, soups, or salads.

Companion Planting

Good Companions

Avoid Planting Near

  • Strawberries

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Komatsuna in Bates County, MO?

Bates County is in Zone 6a with an average last frost of April 9. Plan your Komatsuna planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Bates County, MO?

Bates County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 9 and first fall frost is October 25.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Bates County gardeners in Zone 6a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Bates County, MO. Local conditions may vary. Last updated: April 2026.