Blog

When to plant Spinach in Bates County, MO

Spinach planted in Bates County between March 26 and April 16 matures in 35–50 days — well before the October 25 first frost. A second sowing from August 16 to August 30 extends the harvest into fall.

When to Plant Spinach in Bates County, MO

Spinach

Spinach is a nutrient-packed cool-season green that grows quickly in spring and fall. It is rich in iron, vitamins, and antioxidants and excellent raw or cooked.

Bates County, Missouri is in USDA Zone 6b. The average last spring frost is April 9 and the first fall frost is October 25, giving you a growing season of approximately 199 days.

At an elevation of 1,397 feet, Bates County receives approximately 39 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86°F, providing good warmth for Spinach during the growing season.

Bates County, MO (Zone 6b) Moderate season
199 days
Last Spring Frost April 9
199 growing days
First Fall Frost October 25

Bates County Soil Profile

Soil Type

Silt Loam

Soil pH

6.0-7.0

Drainage

Well Drained

Spinach Planting Timeline — Bates County, MO

Spinach Planting Calendar

Activity When Date Range
Start Indoors March 5 Mar 5 – Mar 19
Transplant Outdoors April 9 Apr 9 – Apr 23
Direct Sow March 26 Mar 26 – Apr 16
Harvest May 14 May 14 – Jul 16
Fall Sowing August 16 Aug 16 – Aug 30

Plant 0.5" deep · 6" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March Start Indoors Direct Sow
April Transplant Outdoors Direct Sow
May Harvest
June Harvest
July Harvest
August Fall Sowing
September
October
November
December

Growing Conditions

☀️ Sun

Partial Shade (3-6 hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

35–50 days

🧪 Soil pH

Needs 6.5–7.5 · Your soil: N/A

🗺️ USDA Zone

Zone 6b

📆 Growing Season

199 days in Bates County

Growing Tips for Bates County

Direct sow as soon as soil can be worked in spring. Plant in partial shade for summer crops to delay bolting. Succession plant every 2 weeks for continuous harvest.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

🌾 Save Your Own Spinach Seeds
Life Cycle Annual
Pollination Wind Pollinated
How to Collect Let plants bolt. Harvest seed stalks when seeds turn tan.
Storage Store airtight; viable 5 years at 35°F, under 45% humidity.

Wind pollinated — isolate 1/2 mile for purity. Easy to let bolt in heat.

Frequently Asked Questions

When should I plant Spinach in Bates County, MO?

Bates County is in Zone 6b with an average last frost of April 9. Plan your Spinach planting based on this frost date — see the calendar above for exact timing.

What planting zone is Bates County, MO?

Bates County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 9 and first fall frost is October 25.

When should I plant Spinach in Bates County, MO?

In Bates County, MO, plant Spinach after the last frost (around April 9) and before the first frost (around October 25). Best results when soil holds above 50°F.

What growing zone is Bates County, MO for Spinach?

Bates County sits in USDA Zone 6b. Spinach grows reliably in zones 2a through 10b, so it's a good fit here.

Can Spinach grow in Bates County's climate?

Yes — Spinach grows well in Bates County's temperate climate. Bates County averages a 199-day frost-free season, with last frost around April 9 and first frost around October 25.

🌱

Your Bates County Garden Planner — Free

A 22-page printable planner built for Bates County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Bates County, MO. Local conditions may vary. Last updated: July 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.