When to Plant Goji Berries in Bollinger County, MO
Goji berries are a deciduous shrub producing small, bright red berries valued as a superfood. The plants are extremely hardy and drought-tolerant once established.
Bollinger County, Missouri is in USDA Zone 6b. The average last spring frost is April 8 and the first fall frost is October 27, giving you a growing season of approximately 202 days.
At an elevation of 1,095 feet, Bollinger County receives approximately 37.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89ยฐF, providing good warmth for Goji Berries during the growing season.
Bollinger County Soil Profile
Soil Type
Silt Loam
Soil pH
5.4-7.1
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Plant Water Budget
Water stress score is 6/10 โ consider drought-tolerant varieties and mulching
Goji Berries Planting Timeline โ Bollinger County, MO
Goji Berries Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | April 29 | Apr 29 โ May 13 |
ยท 48" apart ยท Rows 72" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | โ |
| April | Transplant Outdoors |
| May | Transplant Outdoors |
| June | โ |
| July | โ |
| August | โ |
| September | โ |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
Sun
Full Sun (6-8+ hours)
Water
Low โ drought tolerant
Days to Maturity
730โ1095 days
Soil pH
6.5 โ 8
USDA Zone
Zone 6b
Growing Season
202 days
Growing Tips for Bollinger County
Plant in well-drained soil in full sun. Prune annually to manage the arching, somewhat wild growth habit. Berries ripen over an extended period in summer and fall. Can be trellised.
Companion Planting
Good Companions
Level Up Your Garden
Goji Berries in Other Locations
Frequently Asked Questions
When should I plant Goji Berries in Bollinger County, MO?
Bollinger County is in Zone 6b with an average last frost of April 8. Plan your Goji Berries planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Bollinger County, MO?
Bollinger County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 8 and first fall frost is October 27.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Bollinger County gardeners in Zone 6b organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.