Blog

When to Plant Goji Berries in Barry County, MO

Goji berries are a deciduous shrub producing small, bright red berries valued as a superfood. The plants are extremely hardy and drought-tolerant once established.

Barry County, Missouri is in USDA Zone 6b. The average last spring frost is April 9 and the first fall frost is October 25, giving you a growing season of approximately 199 days.

At an elevation of 515 feet, Barry County receives approximately 40.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86ยฐF, providing good warmth for Goji Berries during the growing season.

Barry County, MO (Zone 6b) Moderate season
199 days
Last Spring Frost April 9
199 growing days
First Fall Frost October 25

Barry County Soil Profile

Soil Type

Silt Loam

Soil pH

5.4-7.1

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season
Transplant: Apr 24
Recommended (50%) ✓ Fits season
Transplant: Apr 30
Safe Start (90%) ✓ Fits season
Transplant: May 14

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Plant Water Budget

Plant needs
0.5″/week
Rainfall provides
0.9″/week
Watering frequency Natural rainfall sufficient
Season total 0 gal / 100 sq ft
Goji Berries needs ~13,231 GDD — county provides 2,885 GDD May not mature

Goji Berries Planting Timeline โ€” Barry County, MO

Goji Berries Planting Calendar

Activity When Date Range
Transplant Outdoors April 30 Apr 30 โ€“ May 14

ยท 48" apart ยท Rows 72" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April Transplant Outdoors
May Transplant Outdoors
June โ€”
July โ€”
August โ€”
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

Sun

Full Sun (6-8+ hours)

Water

Low โ€” drought tolerant

Days to Maturity

730โ€“1095 days

Soil pH

6.5 โ€“ 8

USDA Zone

Zone 6b

Growing Season

199 days

Growing Tips for Barry County

Plant in well-drained soil in full sun. Prune annually to manage the arching, somewhat wild growth habit. Berries ripen over an extended period in summer and fall. Can be trellised.

Companion Planting

Good Companions

Level Up Your Garden

Frequently Asked Questions

When should I plant Goji Berries in Barry County, MO?

Barry County is in Zone 6b with an average last frost of April 9. Plan your Goji Berries planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Barry County, MO?

Barry County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 9 and first fall frost is October 25.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Barry County gardeners in Zone 6b organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Barry County, MO. Local conditions may vary. Last updated: April 2026.