Blog

When to Plant Yarrow in Tulare County, CA

Yarrow is a drought-tolerant perennial herb with feathery foliage and flat-topped flower clusters in white, yellow, pink, or red. It attracts beneficial insects and is used in herbal medicine.

Tulare County, California is in USDA Zone 9a. The average last spring frost is February 17 and the first fall frost is December 3, giving you a growing season of approximately 289 days.

At an elevation of 5,836 feet, Tulare County receives approximately 18.4 inches of rainfall annually with predominantly loam soil. Summer highs average 95ยฐF, so Yarrow may need afternoon shade and extra watering during peak heat. With low rainfall, drip irrigation is essential for growing Yarrow successfully. Mulch heavily to conserve soil moisture.

Tulare County, CA (Zone 9a) Year-round
289 days
Last Spring Frost February 17
289 growing days
First Fall Frost December 3

Tulare County Soil Profile

Soil Type

Loam

Soil pH

5.9-7.2

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (127 days to spare)
Transplant: Feb 4 🍅 Harvest: May 6 – Jul 22
Recommended (50%) ✓ Fits season (114 days to spare)
Transplant: Feb 24 🍅 Harvest: May 26 – Aug 11
Safe Start (90%) ✓ Fits season (88 days to spare)
Transplant: Apr 10 🍅 Harvest: Jul 10 – Sep 25

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Tulare County

How your county's soil matches Yarrow's growing requirements.

Soil pH

Your soil pH (5.9โ€“7.2) overlaps with Yarrow's range (5.5โ€“7.0), though not a perfect match.

Soil Texture

The loam soil in Tulare County is excellent for Yarrow โ€” good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (2.2%). Annual compost additions will help Yarrow.

How to Plant Yarrow

0.5"
Planting Depth
8"
Between Plants
12"
Between Rows

Plant Water Budget

Plant needs
0.5″/week
Rainfall provides
0.3″/week
You supply
0.3″/week
Watering frequency Only during dry spells
Season total 723 gal / 100 sq ft
Drought risk

Water stress score is 8/10 โ€” consider drought-tolerant varieties and mulching

Monthly Watering Guide for Yarrow

Yarrow needs approximately 0.5 inches of water per week (2.2" per month). Here's how your county's rainfall compares month by month.

Month Yarrow Needs Rainfall You Supplement Action
Jan โ€” 3.6" 0" โ„๏ธ Dormant
Feb 2.2" 3.7" 0" โœ… Rainfall sufficient
Mar 2.2" 3" 0" โœ… Rainfall sufficient
Apr 2.2" 1.5" 0.7" ๐Ÿ’ง Light watering
May 2.2" 0.5" 1.7" ๐Ÿšฟ Regular watering
Jun 2.2" 0.1" 2.1" ๐Ÿšฟ Regular watering
Jul 2.2" 0" 2.2" ๐Ÿšฟ Regular watering
Aug 2.2" 0" 2.2" ๐Ÿšฟ Regular watering
Sep 2.2" 0.2" 2" ๐Ÿšฟ Regular watering
Oct 2.2" 0.7" 1.5" ๐Ÿšฟ Regular watering
Nov 2.2" 1.7" 0.5" ๐Ÿ’ง Light watering
Dec 2.2" 3.4" 0" โœ… Rainfall sufficient

Water needs are for active growing months only (Febโ€“Dec in Tulare County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Yarrow Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Yarrow needs ~2,231 GDD — county provides 6,162 GDD Excellent fit

Yarrow Planting Timeline โ€” Tulare County, CA

Yarrow Planting Calendar

Activity When Date Range
Transplant Outdoors February 24 Feb 24 โ€“ Mar 10
Harvest May 26 May 26 โ€“ Aug 11

Plant 0.5" deep ยท 8" apart ยท Rows 12" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February Transplant Outdoors
March Transplant Outdoors
April โ€”
May Harvest
June Harvest
July Harvest
August Harvest
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Full Sun (6-8+ hours)

๐Ÿ’ง Water

0.5"/week ยท Only during dry spells

๐Ÿ“… Days to Maturity

90โ€“120 days

๐Ÿงช Soil pH

Needs 5.5โ€“7 ยท Your soil: acceptable

๐Ÿ—บ๏ธ USDA Zone

Zone 9a

๐Ÿ“† Growing Season

289 days in Tulare County

Growing Tips for Yarrow in Tulare County

Direct sow Yarrow outdoors after February 17 in Tulare County when soil has warmed and frost danger has passed.

Common pests for Yarrow in this region include aphids and slugs. Use row covers early in the season and inspect plants weekly.

Tulare County receives only 18" of rain annually. Yarrow needs consistent moisture โ€” install drip irrigation or water deeply 2-3 times per week.

General growing tips

Direct sow or start from divisions. Yarrow thrives in poor soil and is very drought-tolerant. Deadhead to encourage reblooming. Divide clumps every 3 years.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Yarrow in Tulare County, CA?

Tulare County is in Zone 9a with an average last frost of February 17. Plan your Yarrow planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Tulare County, CA?

Tulare County, California is in USDA Hardiness Zone 9a. The average last spring frost is February 17 and first fall frost is December 3.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Tulare County gardeners in Zone 9a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Tulare County, CA. Local conditions may vary. Last updated: April 2026.