When to Plant Tatsoi in Iron County, MO
Tatsoi is a compact Asian green forming beautiful rosettes of dark, spoon-shaped leaves with a mild mustard flavor. It is extremely cold-hardy and versatile.
Iron County, Missouri is in USDA Zone 6b. The average last spring frost is April 16 and the first fall frost is October 21, giving you a growing season of approximately 188 days.
At an elevation of 1,227 feet, Iron County receives approximately 35.1 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86ยฐF, providing good warmth for Tatsoi during the growing season.
Iron County Soil Profile
Soil Type
Silt Loam
Soil pH
5.6-6.7
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Iron County
How your county's soil matches Tatsoi's growing requirements.
Soil pH
Your soil pH (5.6โ6.7) overlaps with Tatsoi's range (6.0โ7.5), though not a perfect match.
Soil Texture
The silt loam soil in Iron County is excellent for Tatsoi โ good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Tatsoi.
Organic Matter
Organic matter is moderate (3.1%). Annual compost additions will help Tatsoi.
How to Plant Tatsoi
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Tatsoi
Sow every 4 weeks. Last sowing by Sep 01 to harvest before frost.
For a dedicated fall crop, sow by Aug 12.
Plant Water Budget
Monthly Watering Guide for Tatsoi
Tatsoi needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Tatsoi Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 1.5" | 0" | โ๏ธ Dormant |
| Feb | โ | 1.5" | 0" | โ๏ธ Dormant |
| Mar | โ | 2.3" | 0" | โ๏ธ Dormant |
| Apr | 4.3" | 3.7" | 0.6" | ๐ง Light watering |
| May | 4.3" | 4" | 0.3" | ๐ง Light watering |
| Jun | 4.3" | 4" | 0.3" | ๐ง Light watering |
| Jul | 4.3" | 3.4" | 0.9" | ๐ง Light watering |
| Aug | 4.3" | 4.1" | 0.2" | ๐ง Light watering |
| Sep | 4.3" | 2.8" | 1.5" | ๐ง Light watering |
| Oct | 4.3" | 3.1" | 1.2" | ๐ง Light watering |
| Nov | โ | 2.5" | 0" | โ๏ธ Dormant |
| Dec | โ | 2.2" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (AprโOct in Iron County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Tatsoi Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Tatsoi Planting Timeline โ Iron County, MO
Tatsoi Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 12 | Mar 12 โ Mar 26 |
| Transplant Outdoors | April 16 | Apr 16 โ Apr 30 |
| Direct Sow | April 2 | Apr 2 โ Apr 23 |
| Harvest | May 21 | May 21 โ Jun 25 |
| Fall Sowing | August 12 | Aug 12 โ Aug 26 |
Plant 0.5" deep ยท 6" apart ยท Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | Start Indoors |
| April | Transplant Outdoors Direct Sow |
| May | Harvest |
| June | Harvest |
| July | โ |
| August | Fall Sowing |
| September | โ |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Partial Shade (3-6 hours)
๐ง Water
1"/week ยท Natural rainfall sufficient
๐ Days to Maturity
35โ50 days
๐งช Soil pH
Needs 6โ7.5 ยท Your soil: acceptable
๐บ๏ธ USDA Zone
Zone 6b
๐ Growing Season
188 days in Iron County
Growing Tips for Tatsoi in Iron County
Direct sow Tatsoi outdoors after April 16 in Iron County when soil has warmed and frost danger has passed.
Your generous 188.0-day season in Iron County allows multiple plantings of Tatsoi. Sow every 17.0 days for continuous harvest.
Common pests for Tatsoi in this region include cabbage worm and flea beetles. Use row covers early in the season and inspect plants weekly.
General growing tips
Direct sow in spring or fall. Tatsoi tolerates frost down to 15F. Harvest outer leaves or cut whole rosettes. Excellent in salads, stir-fries, or lightly wilted.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Tatsoi in Other Locations
Frequently Asked Questions
When should I plant Tatsoi in Iron County, MO?
Iron County is in Zone 6b with an average last frost of April 16. Plan your Tatsoi planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Iron County, MO?
Iron County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 16 and first fall frost is October 21.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Iron County gardeners in Zone 6b organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.