When to Plant Rue in Weston County, WY
Your May game plan for Weston County, Wyoming
A quick May briefing for Weston County, Wyoming gardeners — what's urgent, what's next, and what can wait.
-
Move rue from tray to bed
Bring a watering can to the bed. Each transplant gets a drink the moment it's in the ground, not ten minutes later.
Rue is a bitter, aromatic perennial herb with bluish-green foliage used historically in medicine and as a pest deterrent. Handle with care as its sap can cause skin irritation.
Weston County, Wyoming is in USDA Zone 4b. The average last spring frost is May 16 and the first fall frost is September 26, giving you a growing season of approximately 133 days.
At an elevation of 5,889 feet, Weston County receives approximately 20.7 inches of rainfall annually with predominantly loam soil. Summer highs average 81°F, so choose short-season varieties of Rue to ensure they mature before fall.
Weston County Soil Profile
Soil Type
Loam
Soil pH
6.7-7.7
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Weston County
How your county's soil matches Rue's growing requirements.
Soil pH
Your soil pH (6.7–7.7) overlaps with Rue's range (6.0–7.5), though not a perfect match.
Soil Texture
The loam soil in Weston County is excellent for Rue — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.4%). Annual compost additions will help Rue.
How to Plant Rue
Succession Planting Rue
Sow every 8 weeks. Last sowing by Jun 28 to harvest before frost.
Plant Water Budget
Water stress score is 8/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Rue
Rue needs approximately 0.5 inches of water per week (2.2" per month). Here's how your county's rainfall compares month by month.
| Month | Rue Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.5" | 0" | ❄️ Dormant |
| Feb | — | 1.4" | 0" | ❄️ Dormant |
| Mar | — | 1.7" | 0" | ❄️ Dormant |
| Apr | — | 2.3" | 0" | ❄️ Dormant |
| May | 2.2" | 2.3" | 0" | ✅ Rainfall sufficient |
| Jun | 2.2" | 1.5" | 0.7" | 💧 Light watering |
| Jul | 2.2" | 1.9" | 0.3" | 💧 Light watering |
| Aug | 2.2" | 2.2" | 0" | ✅ Rainfall sufficient |
| Sep | 2.2" | 1.6" | 0.6" | 💧 Light watering |
| Oct | — | 1.9" | 0" | ❄️ Dormant |
| Nov | — | 1.2" | 0" | ❄️ Dormant |
| Dec | — | 1.1" | 0" | ❄️ Dormant |
Water needs are for active growing months only (May–Sep in Weston County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Rue Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Rue Planting Timeline — Weston County, WY
Rue Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | May 23 | May 23 – Jun 6 |
| Harvest | August 1 | Aug 1 – Oct 3 |
Plant 0.5" deep · 8" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | — |
| May | Transplant Outdoors |
| June | Transplant Outdoors |
| July | — |
| August | Harvest |
| September | Harvest |
| October | Harvest |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
0.5"/week · Natural rainfall sufficient
📅 Days to Maturity
70–90 days
🧪 Soil pH
Needs 6–7.5 · Your soil: acceptable
🗺️ USDA Zone
Zone 4b
📆 Growing Season
133 days in Weston County
Growing Tips for Rue in Weston County
Direct sow Rue outdoors after May 16 in Weston County when soil has warmed and frost danger has passed.
Weston County receives only 21" of rain annually. Rue needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.
General growing tips
Start seeds indoors or direct sow. Plant in well-drained soil. Wear gloves when handling as sap can cause phytophotodermatitis. Prune in early spring.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Rue in Other Locations
Frequently Asked Questions
When should I plant Rue in Weston County, WY?
Weston County is in Zone 4b with an average last frost of May 16. Plan your Rue planting based on this frost date — see the calendar above for exact timing.
What planting zone is Weston County, WY?
Weston County, Wyoming is in USDA Hardiness Zone 4b. The average last spring frost is May 16 and first fall frost is September 26.
Your Weston County Garden Planner — Free
A 24-page printable planner built for Weston County (Zone 4b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.