When to Plant Rue in Yoder, WY
What to do in June
Each item below is timed to Goshen County, Wyoming's frost dates and soil temperatures. Skip nothing, stress about nothing.
Before July arrives, get these ready
- First harvests: rue
Rue is a bitter, aromatic perennial herb with bluish-green foliage used historically in medicine and as a pest deterrent. Handle with care as its sap can cause skin irritation.
Yoder, Wyoming is in USDA Zone 5a. The average last spring frost is May 13 and the first fall frost is September 29, giving you a growing season of approximately 139 days.
At an elevation of 5,820 feet, Goshen County receives approximately 15.7 inches of rainfall annually with predominantly loam soil. Summer highs average 84°F, so choose short-season varieties of Rue to ensure they mature before fall. With low rainfall, drip irrigation is essential for growing Rue successfully. Mulch heavily to conserve soil moisture.
Yoder Soil Profile
Soil Type
Loam
Soil pH
6.7-8.4
Drainage
Well Drained
Rue Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Yoder
How your county's soil matches Rue's growing requirements.
Soil pH
Your soil pH (6.7–8.4) is more alkaline than Rue prefers (6.0–7.5). Add sulfur or peat moss to lower pH.
Soil Texture
The loam soil in Goshen County is excellent for Rue — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.9%). Annual compost additions will help Rue.
How to Plant Rue
Succession Planting Rue
Sow every 8 weeks. Last sowing by Jul 01 to harvest before frost.
Rue Water Budget
Water stress score is 6/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Rue
Rue needs approximately 0.5 inches of water per week (2.2" per month). Here's how your county's rainfall compares month by month.
| Month | Rue Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.2" | 0" | ❄️ Dormant |
| Feb | — | 1" | 0" | ❄️ Dormant |
| Mar | — | 1.6" | 0" | ❄️ Dormant |
| Apr | — | 1.6" | 0" | ❄️ Dormant |
| May | 2.2" | 1.6" | 0.6" | 💧 Light watering |
| Jun | 2.2" | 1.1" | 1.1" | 🚿 Regular watering |
| Jul | 2.2" | 1.3" | 0.9" | 💧 Light watering |
| Aug | 2.2" | 1.5" | 0.7" | 💧 Light watering |
| Sep | 2.2" | 1.1" | 1.1" | 🚿 Regular watering |
| Oct | — | 1.5" | 0" | ❄️ Dormant |
| Nov | — | 1.2" | 0" | ❄️ Dormant |
| Dec | — | 1" | 0" | ❄️ Dormant |
Water needs are for active growing months only (May–Sep in Goshen County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Rue Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Rue Planting Timeline — Yoder, WY
Rue Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | May 20 | May 20 – Jun 3 |
| Harvest | July 29 | Jul 29 – Sep 30 |
Plant 0.5" deep · 8" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | — |
| May | Transplant Outdoors |
| June | Transplant Outdoors |
| July | Harvest |
| August | Harvest |
| September | Harvest |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
0.5"/week · Only during dry spells
📅 Days to Maturity
70–90 days
🧪 Soil pH
Needs 6–7.5 · Your soil: too_alkaline
🗺️ USDA Zone
Zone 5a
📆 Growing Season
139 days in Goshen County
Growing Tips for Rue in Yoder
Direct sow Rue outdoors after May 13 in Goshen County when soil has warmed and frost danger has passed.
Goshen County receives only 16" of rain annually. Rue needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.
General growing tips
Start seeds indoors or direct sow. Plant in well-drained soil. Wear gloves when handling as sap can cause phytophotodermatitis. Prune in early spring.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Rue in Other Locations
Your Goshen County Garden Planner — Free
A 22-page printable planner built for Goshen County (Zone 5a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.