When to Plant Lovage in Crook County, WY
May to-do list for Crook County, Wyoming
Each item below is timed to Crook County, Wyoming's frost dates and soil temperatures. Skip nothing, stress about nothing.
-
Move lovage into the garden
Pinch off the lowest leaves on each seedling before you plant — it reduces water loss while the roots catch up.
Lovage is a large perennial herb with a celery-like flavor that can grow 4-6 feet tall. All parts are edible including the leaves, stems, seeds, and roots.
Crook County, Wyoming is in USDA Zone 4b. The average last spring frost is May 14 and the first fall frost is October 1, giving you a growing season of approximately 140 days.
At an elevation of 8,060 feet, Crook County receives approximately 24.8 inches of rainfall annually with predominantly loam soil. Summer highs average 82°F, so choose short-season varieties of Lovage to ensure they mature before fall.
Crook County Soil Profile
Soil Type
Loam
Soil pH
6.3-7.9
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Crook County
How your county's soil matches Lovage's growing requirements.
Soil pH
Your soil pH (6.3–7.9) is more alkaline than Lovage prefers (6.0–7.0). Add sulfur or peat moss to lower pH.
Soil Texture
The loam soil in Crook County is excellent for Lovage — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.4%). Annual compost additions will help Lovage.
How to Plant Lovage
Succession Planting Lovage
Sow every 8 weeks. Last sowing by Jul 03 to harvest before frost.
Plant Water Budget
Water stress score is 8/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Lovage
Lovage needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Lovage Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.6" | 0" | ❄️ Dormant |
| Feb | — | 1.5" | 0" | ❄️ Dormant |
| Mar | — | 1.9" | 0" | ❄️ Dormant |
| Apr | — | 2.9" | 0" | ❄️ Dormant |
| May | 4.3" | 3.1" | 1.2" | 💧 Light watering |
| Jun | 4.3" | 1.6" | 2.7" | 🚿 Regular watering |
| Jul | 4.3" | 2.1" | 2.2" | 🚿 Regular watering |
| Aug | 4.3" | 2.5" | 1.8" | 💧 Light watering |
| Sep | 4.3" | 2.2" | 2.1" | 💧 Light watering |
| Oct | 4.3" | 2.3" | 2" | 💧 Light watering |
| Nov | — | 1.6" | 0" | ❄️ Dormant |
| Dec | — | 1.5" | 0" | ❄️ Dormant |
Water needs are for active growing months only (May–Oct in Crook County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Lovage Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Lovage Planting Timeline — Crook County, WY
Lovage Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | May 21 | May 21 – Jun 4 |
| Harvest | July 30 | Jul 30 – Oct 1 |
Plant 0.5" deep · 8" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | — |
| May | Transplant Outdoors |
| June | Transplant Outdoors |
| July | Harvest |
| August | Harvest |
| September | Harvest |
| October | Harvest |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · 1-2 times/week
📅 Days to Maturity
70–90 days
🧪 Soil pH
Needs 6–7 · Your soil: too_alkaline
🗺️ USDA Zone
Zone 4b
📆 Growing Season
140 days in Crook County
Growing Tips for Lovage in Crook County
Direct sow Lovage outdoors after May 14 in Crook County when soil has warmed and frost danger has passed.
Common pests for Lovage in this region include carrot rust fly and parsleyworm. Use row covers early in the season and inspect plants weekly.
Crook County receives only 25" of rain annually. Lovage needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.
General growing tips
Start seeds indoors or direct sow in spring. One plant is usually enough for a family. Harvest outer stems and leaves as needed. Divide clumps every 3-4 years.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Lovage in Other Locations
Frequently Asked Questions
When should I plant Lovage in Crook County, WY?
Crook County is in Zone 4b with an average last frost of May 14. Plan your Lovage planting based on this frost date — see the calendar above for exact timing.
What planting zone is Crook County, WY?
Crook County, Wyoming is in USDA Hardiness Zone 4b. The average last spring frost is May 14 and first fall frost is October 1.
Your Crook County Garden Planner — Free