When to Plant Komatsuna in Pendleton County, WV
Pendleton County, West Virginia gardeners: here's your May plan
Welcome to May in Zone 6a. These are the moves that will have the biggest impact on your growing season.
June will be here before you know it — start on
- Starting indoors: komatsuna
- First harvests: komatsuna
Komatsuna (Japanese mustard spinach) is a versatile Asian green with glossy, dark leaves and a mild, sweet flavor. It is extremely cold-hardy and heat-tolerant.
Pendleton County, West Virginia is in USDA Zone 6a. The average last spring frost is April 28 and the first fall frost is October 17, giving you a growing season of approximately 172 days.
At an elevation of 3,889 feet, Pendleton County receives approximately 50.3 inches of rainfall annually with predominantly silt loam soil. Summer highs average 84°F, so choose short-season varieties of Komatsuna to ensure they mature before fall. Ample rainfall means less supplemental watering, but ensure good drainage to prevent Komatsuna root diseases.
Pendleton County Soil Profile
Soil Type
Silt Loam
Soil pH
5.7-6.9
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Pendleton County
How your county's soil matches Komatsuna's growing requirements.
Soil pH
Your soil pH (5.7–6.9) overlaps with Komatsuna's range (6.0–7.5), though not a perfect match.
Soil Texture
The silt loam soil in Pendleton County is excellent for Komatsuna — good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Komatsuna.
Organic Matter
Organic matter is moderate (3.4%). Annual compost additions will help Komatsuna.
How to Plant Komatsuna
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Komatsuna
Sow every 4 weeks. Last sowing by Aug 28 to harvest before frost.
For a dedicated fall crop, sow by Aug 08.
Plant Water Budget
Monthly Watering Guide for Komatsuna
Komatsuna needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Komatsuna Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 4.5" | 0" | ❄️ Dormant |
| Feb | — | 3.8" | 0" | ❄️ Dormant |
| Mar | — | 4.6" | 0" | ❄️ Dormant |
| Apr | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| May | 4.3" | 3.5" | 0.8" | 💧 Light watering |
| Jun | 4.3" | 4.1" | 0.2" | 💧 Light watering |
| Jul | 4.3" | 5.7" | 0" | ✅ Rainfall sufficient |
| Aug | 4.3" | 4.5" | 0" | ✅ Rainfall sufficient |
| Sep | 4.3" | 3.6" | 0.7" | 💧 Light watering |
| Oct | 4.3" | 3.6" | 0.7" | 💧 Light watering |
| Nov | — | 4" | 0" | ❄️ Dormant |
| Dec | — | 4" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Pendleton County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Komatsuna Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Komatsuna Planting Timeline — Pendleton County, WV
Komatsuna Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 24 | Mar 24 – Apr 7 |
| Transplant Outdoors | April 28 | Apr 28 – May 12 |
| Direct Sow | April 14 | Apr 14 – May 5 |
| Harvest | June 2 | Jun 2 – Jul 7 |
| Fall Sowing | August 8 | Aug 8 – Aug 22 |
Plant 0.5" deep · 6" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | Start Indoors |
| April | Start Indoors Transplant Outdoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Harvest |
| August | Fall Sowing |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · Natural rainfall sufficient
📅 Days to Maturity
35–50 days
🧪 Soil pH
Needs 6–7.5 · Your soil: acceptable
🗺️ USDA Zone
Zone 6a
📆 Growing Season
172 days in Pendleton County
Growing Tips for Komatsuna in Pendleton County
Direct sow Komatsuna outdoors after April 28 in Pendleton County when soil has warmed and frost danger has passed.
Your generous 172.0-day season in Pendleton County allows multiple plantings of Komatsuna. Sow every 17.0 days for continuous harvest.
Common pests for Komatsuna in this region include cabbage worm and flea beetles. Use row covers early in the season and inspect plants weekly.
General growing tips
Direct sow in spring or fall. One of the most forgiving Asian greens for all seasons. Harvest outer leaves or cut whole plants. Excellent for stir-fries, soups, or salads.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Komatsuna in Other Locations
Frequently Asked Questions
When should I plant Komatsuna in Pendleton County, WV?
Pendleton County is in Zone 6a with an average last frost of April 28. Plan your Komatsuna planting based on this frost date — see the calendar above for exact timing.
What planting zone is Pendleton County, WV?
Pendleton County, West Virginia is in USDA Hardiness Zone 6a. The average last spring frost is April 28 and first fall frost is October 17.
Your Pendleton County Garden Planner — Free
A 24-page printable planner built for Pendleton County (Zone 6a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.