Blog

When to Plant Impatiens in Spokane County, WA

Impatiens (Impatiens walleriana) are the go-to annual for shaded beds and containers. They produce a continuous carpet of flat-faced blooms from transplant until frost, needing little deadheading. Their preference for consistent moisture and part-shade makes them ideal under trees and along north-facing borders.

Spokane County, Washington is in USDA Zone 6b. The average last spring frost is May 11 and the first fall frost is September 27, giving you a growing season of approximately 139 days.

At an elevation of 1,645 feet, Spokane County receives approximately 20.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 91°F, providing good warmth for Impatiens during the growing season.

Annual Blooms in Summer Pollinator-friendly
Spokane County, WA (Zone 6b) Short season
139 days
Last Spring Frost May 11
139 growing days
First Fall Frost September 27

Spokane County Soil Profile

Soil Type

Silt Loam

Soil pH

5.5-6.2

Drainage

Well Drained

Monthly Watering Guide for Impatiens

Impatiens needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Impatiens Needs Rainfall You Supplement Action
Jan 3.1" 0" ❄️ Dormant
Feb 2.2" 0" ❄️ Dormant
Mar 1.9" 0" ❄️ Dormant
Apr 1.7" 0" ❄️ Dormant
May 4.3" 1.3" 3" 🚿 Regular watering
Jun 4.3" 0.8" 3.5" 🚿 Regular watering
Jul 4.3" 0.3" 4" 🚿 Regular watering
Aug 4.3" 0.4" 3.9" 🚿 Regular watering
Sep 4.3" 0.7" 3.6" 🚿 Regular watering
Oct 1.5" 0" ❄️ Dormant
Nov 3.3" 0" ❄️ Dormant
Dec 3.2" 0" ❄️ Dormant

Water needs are for active growing months only (May–Sep in Spokane County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Impatiens Planting Timeline — Spokane County, WA

Impatiens Planting Calendar

Activity When Date Range
Start Indoors March 16 Mar 16 – Mar 30
Transplant Outdoors May 18 May 18 – Jun 1
Bloom July 27 Jul 27 – Nov 9

· 10" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March Start Indoors
April
May Transplant Outdoors
June Transplant Outdoors
July Bloom
August Bloom
September Bloom
October Bloom
November Bloom
December

Growing Conditions

☀️ Sun

Partial Shade (3-6 hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

60–75 days

🧪 Soil pH

Needs 6–6.5 · Your soil: N/A

🗺️ USDA Zone

Zone 6b

📆 Growing Season

139 days in Spokane County

Growing Tips for Spokane County

Start seeds indoors 8–10 weeks before last frost at 70–75°F; germination requires light — do not cover seeds. Transplant after last frost once nights consistently exceed 50°F. Water regularly — wilting causes bud drop and they rarely fully recover the same flush. Watch for impatiens downy mildew (IDM); consider New Guinea impatiens as a resistant alternative in affected regions. Pinch tips at planting to encourage branching.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Impatiens in Spokane County, WA?

Spokane County is in Zone 6b with an average last frost of May 11. Plan your Impatiens planting based on this frost date — see the calendar above for exact timing.

What planting zone is Spokane County, WA?

Spokane County, Washington is in USDA Hardiness Zone 6b. The average last spring frost is May 11 and first fall frost is September 27.

🌱

Your Spokane County Garden Planner — Free

A 22-page printable planner built for Spokane County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Spokane County, WA. Local conditions may vary. Last updated: July 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.