When to Plant Mache in Cusick, WA
This month in Pend Oreille County, Washington
Here's what deserves your attention in Pend Oreille County, Washington this month. Everything below is tailored to Zone 6a and timed around your local frost dates.
-
Collect mache at their peak
Check every 1–2 days. Many of these get tough or go to seed if you wait too long.
-
Get mache in for a late-season harvest
Your first frost is about 11 weeks away — plenty of time for these to mature.
Mache (corn salad) is a cold-hardy salad green with small, rounded, tender leaves and a mild, nutty flavor. It thrives in cool weather and even overwinters in many climates.
Cusick, Washington is in USDA Zone 6a. The average last spring frost is May 10 and the first fall frost is September 23, giving you a growing season of approximately 136 days.
At an elevation of 3,807 feet, Pend Oreille County receives approximately 13.2 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86°F, providing good warmth for Mache during the growing season. With low rainfall, drip irrigation is essential for growing Mache successfully. Mulch heavily to conserve soil moisture.
Cusick Soil Profile
Soil Type
Silt Loam
Soil pH
5.3-6.6
Drainage
Well Drained
Mache Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Cusick
How your county's soil matches Mache's growing requirements.
Soil pH
Your soil pH (5.3–6.6) is more acidic than Mache prefers (6.0–7.5). Add garden lime to raise pH.
Soil Texture
The silt loam soil in Pend Oreille County is excellent for Mache — good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Mache.
Organic Matter
Organic matter is excellent (5.0%) — Mache will thrive.
How to Plant Mache
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Mache
Sow every 4.6 weeks. Last sowing by Jul 25 to harvest before frost.
For a dedicated fall crop, sow by Jul 15.
Mache Water Budget
Monthly Watering Guide for Mache
Mache needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Mache Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.8" | 0" | ❄️ Dormant |
| Feb | — | 1.4" | 0" | ❄️ Dormant |
| Mar | — | 1.3" | 0" | ❄️ Dormant |
| Apr | — | 0.9" | 0" | ❄️ Dormant |
| May | 4.3" | 0.8" | 3.5" | 🚿 Regular watering |
| Jun | 4.3" | 0.5" | 3.8" | 🚿 Regular watering |
| Jul | 4.3" | 0.2" | 4.1" | 🚿 Regular watering |
| Aug | 4.3" | 0.2" | 4.1" | 🚿 Regular watering |
| Sep | 4.3" | 0.6" | 3.7" | 🚿 Regular watering |
| Oct | — | 1.3" | 0" | ❄️ Dormant |
| Nov | — | 2.1" | 0" | ❄️ Dormant |
| Dec | — | 1.9" | 0" | ❄️ Dormant |
Water needs are for active growing months only (May–Sep in Pend Oreille County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Mache Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Mache Planting Timeline — Cusick, WA
Mache Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | April 5 | Apr 5 – Apr 19 |
| Transplant Outdoors | May 10 | May 10 – May 24 |
| Direct Sow | April 26 | Apr 26 – May 17 |
| Harvest | June 21 | Jun 21 – Jul 26 |
| Fall Sowing | July 15 | Jul 15 – Jul 29 |
Plant 0.5" deep · 6" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | Start Indoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Fall Sowing Harvest |
| August | — |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · 2-3 times/week
📅 Days to Maturity
40–60 days
🧪 Soil pH
Needs 6–7.5 · Your soil: too_acidic
🗺️ USDA Zone
Zone 6a
📆 Growing Season
136 days in Pend Oreille County
Growing Tips for Mache in Cusick
Direct sow Mache outdoors after May 10 in Pend Oreille County when soil has warmed and frost danger has passed.
Pend Oreille County receives only 13" of rain annually. Mache needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.
General growing tips
Direct sow in early spring or late summer for fall and winter harvest. Seeds need light to germinate so press gently into soil surface. Harvest whole rosettes.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Mache in Other Locations
Your Pend Oreille County Garden Planner — Free
A 22-page printable planner built for Pend Oreille County (Zone 6a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.