When to Plant Mache in Franklin County, VA
Mache (corn salad) is a cold-hardy salad green with small, rounded, tender leaves and a mild, nutty flavor. It thrives in cool weather and even overwinters in many climates.
Franklin County, Virginia is in USDA Zone 7a. The average last spring frost is April 19 and the first fall frost is October 24, giving you a growing season of approximately 188 days.
At an elevation of 494 feet, Franklin County receives approximately 47 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89ยฐF, providing good warmth for Mache during the growing season.
Franklin County Soil Profile
Soil Type
Silt Loam
Soil pH
5.3-7.1
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Franklin County
How your county's soil matches Mache's growing requirements.
Soil pH
Your soil pH (5.3โ7.1) overlaps with Mache's range (6.0โ7.5), though not a perfect match.
Soil Texture
The silt loam soil in Franklin County is excellent for Mache โ good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Mache.
Organic Matter
Organic matter is moderate (3.1%). Annual compost additions will help Mache.
How to Plant Mache
Fall planting: Sow 10 weeks before your first frost date for a fall harvest.
Succession Planting Mache
Sow every 4.6 weeks. Last sowing by Aug 25 to harvest before frost.
For a dedicated fall crop, sow by Aug 15.
Plant Water Budget
Monthly Watering Guide for Mache
Mache needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Mache Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | โ | 3.5" | 0" | โ๏ธ Dormant |
| Feb | โ | 4.3" | 0" | โ๏ธ Dormant |
| Mar | โ | 4.4" | 0" | โ๏ธ Dormant |
| Apr | 4.3" | 4" | 0.3" | ๐ง Light watering |
| May | 4.3" | 4" | 0.3" | ๐ง Light watering |
| Jun | 4.3" | 4.2" | 0.1" | ๐ง Light watering |
| Jul | 4.3" | 5.2" | 0" | โ Rainfall sufficient |
| Aug | 4.3" | 4.4" | 0" | โ Rainfall sufficient |
| Sep | 4.3" | 3.1" | 1.2" | ๐ง Light watering |
| Oct | 4.3" | 2.8" | 1.5" | ๐ง Light watering |
| Nov | โ | 3.4" | 0" | โ๏ธ Dormant |
| Dec | โ | 3.7" | 0" | โ๏ธ Dormant |
Water needs are for active growing months only (AprโOct in Franklin County). Supplement amounts are based on average rainfall โ actual needs vary with temperature, soil, and mulching.
Mache Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ every day above 50ยฐF deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Mache Planting Timeline โ Franklin County, VA
Mache Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 15 | Mar 15 โ Mar 29 |
| Transplant Outdoors | April 19 | Apr 19 โ May 3 |
| Direct Sow | April 5 | Apr 5 โ Apr 26 |
| Harvest | May 31 | May 31 โ Jul 5 |
| Fall Sowing | August 15 | Aug 15 โ Aug 29 |
Plant 0.5" deep ยท 6" apart ยท Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | โ |
| February | โ |
| March | Start Indoors |
| April | Transplant Outdoors Direct Sow |
| May | Transplant Outdoors Harvest |
| June | Harvest |
| July | Harvest |
| August | Fall Sowing |
| September | โ |
| October | โ |
| November | โ |
| December | โ |
Growing Conditions
โ๏ธ Sun
Partial Shade (3-6 hours)
๐ง Water
1"/week ยท Natural rainfall sufficient
๐ Days to Maturity
40โ60 days
๐งช Soil pH
Needs 6โ7.5 ยท Your soil: acceptable
๐บ๏ธ USDA Zone
Zone 7a
๐ Growing Season
188 days in Franklin County
Growing Tips for Mache in Franklin County
Direct sow Mache outdoors after April 19 in Franklin County when soil has warmed and frost danger has passed.
Your generous 188.0-day season in Franklin County allows multiple plantings of Mache. Sow every 20.0 days for continuous harvest.
General growing tips
Direct sow in early spring or late summer for fall and winter harvest. Seeds need light to germinate so press gently into soil surface. Harvest whole rosettes.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Mache in Other Locations
Frequently Asked Questions
When should I plant Mache in Franklin County, VA?
Franklin County is in Zone 7a with an average last frost of April 19. Plan your Mache planting based on this frost date โ see the calendar above for exact timing.
What planting zone is Franklin County, VA?
Franklin County, Virginia is in USDA Hardiness Zone 7a. The average last spring frost is April 19 and first fall frost is October 24.
Plan Your Garden with Confidence
Get our free Garden Planner โ designed to help Franklin County gardeners in Zone 7a organize planting dates, track what's growing, and never miss a planting window.
Get Your Free Garden Planner →Free download. Plan your entire garden season in minutes.