Blog

When to Plant Che Fruit in Craig County, VA

Craig County, Virginia Zone 7a May

Your May game plan for Craig County, Virginia

Your garden in Craig County, Virginia is working on a schedule, even when you're not. Here's where you should be this May.

Avg. last frost April 26
Avg. first frost October 19
Soil temp (4") 64°F
Watering Moderate
Pest pressure Low
Daylight 14 hrs
  1. Set out che fruit seedlings

    Your last frost (April 26) has passed. These warm-season crops can handle outdoor soil now.

Instant PDF download. No spam, unsubscribe any time.

Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.

Craig County, Virginia is in USDA Zone 7a. The average last spring frost is April 26 and the first fall frost is October 19, giving you a growing season of approximately 176 days.

At an elevation of 460 feet, Craig County receives approximately 43 inches of rainfall annually with predominantly silt loam soil. Summer highs average 85°F, providing good warmth for Che Fruit during the growing season.

Craig County, VA (Zone 7a) Moderate season
176 days
Last Spring Frost April 26
176 growing days
First Fall Frost October 19

Craig County Soil Profile

Soil Type

Silt Loam

Soil pH

5.5-6.8

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season
Transplant: May 11
Recommended (50%) ✓ Fits season
Transplant: May 17
Safe Start (90%) ✓ Fits season
Transplant: Jun 5

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Craig County

How your county's soil matches Che Fruit's growing requirements.

Soil pH

Your soil pH (5.5–6.8) overlaps with Che Fruit's range (6.0–7.5), though not a perfect match.

Soil Texture

The silt loam soil in Craig County is excellent for Che Fruit — good drainage, moisture retention, and nutrient holding capacity.

Drainage

Drainage is adequate for Che Fruit.

Organic Matter

Organic matter is moderate (3.0%). Annual compost additions will help Che Fruit.

How to Plant Che Fruit

120"
Between Plants
144"
Between Rows

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
1.0″/week
Watering frequency Natural rainfall sufficient
Season total 0 gal / 100 sq ft

Monthly Watering Guide for Che Fruit

Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Che Fruit Needs Rainfall You Supplement Action
Jan 3.8" 0" ❄️ Dormant
Feb 3.3" 0" ❄️ Dormant
Mar 4.2" 0" ❄️ Dormant
Apr 4.3" 3.8" 0.5" 💧 Light watering
May 4.3" 3.6" 0.7" 💧 Light watering
Jun 4.3" 3.9" 0.4" 💧 Light watering
Jul 4.3" 4.4" 0" ✅ Rainfall sufficient
Aug 4.3" 3.7" 0.6" 💧 Light watering
Sep 4.3" 2.9" 1.4" 💧 Light watering
Oct 4.3" 2.5" 1.8" 💧 Light watering
Nov 3.2" 0" ❄️ Dormant
Dec 3.7" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Craig County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Che Fruit Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Che Fruit needs ~20,075 GDD — county provides 2,420 GDD May not mature

Che Fruit Planting Timeline — Craig County, VA

Che Fruit Planting Calendar

Activity When Date Range
Transplant Outdoors May 17 May 17 – May 31

· 120" apart · Rows 144" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April
May Transplant Outdoors
June
July
August
September
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

1"/week · Natural rainfall sufficient

📅 Days to Maturity

1095–1825 days

🧪 Soil pH

Needs 6–7.5 · Your soil: acceptable

🗺️ USDA Zone

Zone 7a

📆 Growing Season

176 days in Craig County

Growing Tips for Che Fruit in Craig County

Direct sow Che Fruit outdoors after April 26 in Craig County when soil has warmed and frost danger has passed.

Your 176.0-day growing season in Craig County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.

General growing tips

Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Che Fruit in Craig County, VA?

Craig County is in Zone 7a with an average last frost of April 26. Plan your Che Fruit planting based on this frost date — see the calendar above for exact timing.

What planting zone is Craig County, VA?

Craig County, Virginia is in USDA Hardiness Zone 7a. The average last spring frost is April 26 and first fall frost is October 19.

🌱

Your Craig County Garden Planner — Free

A 24-page printable planner built for Craig County (Zone 7a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Craig County, VA. Local conditions may vary. Last updated: May 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.