Blog

When to Plant Che Fruit in Chesterfield County, VA

Chesterfield County, Virginia Zone 7b May

May to-do list for Chesterfield County, Virginia

Each item below is timed to Chesterfield County, Virginia's frost dates and soil temperatures. Skip nothing, stress about nothing.

Avg. last frost April 8
Avg. first frost October 31
Soil temp (4") 66°F
Watering Moderate
Pest pressure Moderate
Daylight 14 hrs

Instant PDF download. No spam, unsubscribe any time.

Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.

Chesterfield County, Virginia is in USDA Zone 7b. The average last spring frost is April 8 and the first fall frost is October 31, giving you a growing season of approximately 206 days.

At an elevation of 657 feet, Chesterfield County receives approximately 41.1 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89°F, providing good warmth for Che Fruit during the growing season.

Chesterfield County, VA (Zone 7b) Long season
206 days
Last Spring Frost April 8
206 growing days
First Fall Frost October 31
Share this guide:

Chesterfield County Soil Profile

Soil Type

Silt Loam

Soil pH

5.7-7

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season
Transplant: Apr 22
Recommended (50%) ✓ Fits season
Transplant: Apr 29
Safe Start (90%) ✓ Fits season
Transplant: May 14

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Chesterfield County

How your county's soil matches Che Fruit's growing requirements.

Soil pH

Your soil pH (5.7–7.0) overlaps with Che Fruit's range (6.0–7.5), though not a perfect match.

Soil Texture

The silt loam soil in Chesterfield County is excellent for Che Fruit — good drainage, moisture retention, and nutrient holding capacity.

Drainage

Drainage is adequate for Che Fruit.

Organic Matter

Organic matter is moderate (3.3%). Annual compost additions will help Che Fruit.

How to Plant Che Fruit

120"
Between Plants
144"
Between Rows

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.8″/week
Watering frequency Natural rainfall sufficient
Season total 0 gal / 100 sq ft

Monthly Watering Guide for Che Fruit

Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Che Fruit Needs Rainfall You Supplement Action
Jan 3.8" 0" ❄️ Dormant
Feb 3.2" 0" ❄️ Dormant
Mar 4.3" 0" ❄️ Dormant
Apr 4.3" 3.5" 0.8" 💧 Light watering
May 4.3" 2.9" 1.4" 💧 Light watering
Jun 4.3" 3.8" 0.5" 💧 Light watering
Jul 4.3" 3.8" 0.5" 💧 Light watering
Aug 4.3" 4" 0.3" 💧 Light watering
Sep 4.3" 2.8" 1.5" 💧 Light watering
Oct 4.3" 2.7" 1.6" 💧 Light watering
Nov 2.7" 0" ❄️ Dormant
Dec 3.5" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Chesterfield County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Che Fruit Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Che Fruit needs ~24,455 GDD — county provides 3,450 GDD May not mature

Che Fruit Planting Timeline — Chesterfield County, VA

Che Fruit Planting Calendar

Activity When Date Range
Transplant Outdoors April 29 Apr 29 – May 13

· 120" apart · Rows 144" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April Transplant Outdoors
May Transplant Outdoors
June
July
August
September
October
November
December
Share this guide:

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

1"/week · Natural rainfall sufficient

📅 Days to Maturity

1095–1825 days

🧪 Soil pH

Needs 6–7.5 · Your soil: acceptable

🗺️ USDA Zone

Zone 7b

📆 Growing Season

206 days in Chesterfield County

Growing Tips for Che Fruit in Chesterfield County

Direct sow Che Fruit outdoors after April 08 in Chesterfield County when soil has warmed and frost danger has passed.

Your 206.0-day growing season in Chesterfield County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.

General growing tips

Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Che Fruit in Chesterfield County, VA?

Chesterfield County is in Zone 7b with an average last frost of April 8. Plan your Che Fruit planting based on this frost date — see the calendar above for exact timing.

What planting zone is Chesterfield County, VA?

Chesterfield County, Virginia is in USDA Hardiness Zone 7b. The average last spring frost is April 8 and first fall frost is October 31.

🌱

Your Chesterfield County Garden Planner — Free

A 24-page printable planner built for Chesterfield County (Zone 7b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Chesterfield County, VA. Local conditions may vary. Last updated: May 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.