When to Plant Portulaca in Davis County, UT
Your June game plan for Davis County, Utah
June is a pivotal month for Davis County, Utah gardens. Focus on these tasks first and you'll set up the rest of the season for success.
-
Time to start portulaca inside
Bottom-water once the first true leaves appear — it keeps stems dry and knocks back damping-off.
-
Basket week: portulaca
Morning harvests are best — cooler temperatures mean crisper produce and longer fridge life.
Get ahead of July
- First harvests: portulaca
Portulaca (Portulaca grandiflora), commonly called moss rose, is a succulent- stemmed annual built for hot, dry, low-fertility conditions where other flowers fail. Its silky, rose-like blooms open in full sun and close at night or on cloudy days. Excellent for slopes, rock gardens, containers, and parking-strip plantings where irrigation is limited. One of the easiest annuals for neglect- proof summer color.
Davis County, Utah is in USDA Zone 7a. The average last spring frost is May 6 and the first fall frost is October 10, giving you a growing season of approximately 157 days.
At an elevation of 4,567 feet, Davis County receives approximately 16.6 inches of rainfall annually with predominantly loam soil. Summer highs average 91°F, providing good warmth for Portulaca during the growing season. With low rainfall, drip irrigation is essential for growing Portulaca successfully. Mulch heavily to conserve soil moisture.
Davis County Soil Profile
Soil Type
Loam
Soil pH
6.5-7.6
Drainage
Well Drained
Portulaca Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Davis County
How your county's soil matches Portulaca's growing requirements.
Soil pH
Your soil pH (6.5–7.6) is more alkaline than Portulaca prefers (5.5–7.0). Add sulfur or peat moss to lower pH.
Soil Texture
The loam soil in Davis County is excellent for Portulaca — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.1%). Annual compost additions will help Portulaca.
How to Plant Portulaca
Succession Planting Portulaca
Sow every 5.7 weeks. Last sowing by Aug 01 to harvest before frost.
Portulaca Water Budget
Water stress score is 10/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Portulaca
Portulaca needs approximately 0.5 inches of water per week (2.2" per month). Here's how your county's rainfall compares month by month.
| Month | Portulaca Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.2" | 0" | ❄️ Dormant |
| Feb | — | 1.1" | 0" | ❄️ Dormant |
| Mar | — | 1.2" | 0" | ❄️ Dormant |
| Apr | — | 1.9" | 0" | ❄️ Dormant |
| May | 2.2" | 1.7" | 0.5" | 💧 Light watering |
| Jun | 2.2" | 1" | 1.2" | 🚿 Regular watering |
| Jul | 2.2" | 1.7" | 0.5" | 💧 Light watering |
| Aug | 2.2" | 2" | 0.2" | 💧 Light watering |
| Sep | 2.2" | 1.5" | 0.7" | 💧 Light watering |
| Oct | 2.2" | 1.4" | 0.8" | 💧 Light watering |
| Nov | — | 1.2" | 0" | ❄️ Dormant |
| Dec | — | 0.9" | 0" | ❄️ Dormant |
Water needs are for active growing months only (May–Oct in Davis County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Portulaca Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Portulaca Planting Timeline — Davis County, UT
Portulaca Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | April 8 | Apr 8 – Apr 22 |
| Transplant Outdoors | May 6 | May 6 – May 20 |
| Direct Sow | May 6 | May 6 – May 27 |
| Bloom | June 24 | Jun 24 – Oct 21 |
· 8" apart · Rows 10" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | Start Indoors |
| May | Transplant Outdoors Direct Sow |
| June | Bloom |
| July | Bloom |
| August | Bloom |
| September | Bloom |
| October | Bloom |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
0.5"/week · Only during dry spells
📅 Days to Maturity
50–70 days
🧪 Soil pH
Needs 5.5–7 · Your soil: too_alkaline
🗺️ USDA Zone
Zone 7a
📆 Growing Season
157 days in Davis County
Growing Tips for Portulaca in Davis County
Direct sow Portulaca outdoors after May 06 in Davis County when soil has warmed and frost danger has passed.
Davis County receives only 17" of rain annually. Portulaca needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.
General growing tips
Direct-sow after last frost once soil warms to 65°F, or start indoors 4–6 weeks before last frost. Seed is tiny — surface sow and do not cover. Thin to proper spacing after germination. Thrives in poor, well-drained soil; rich or wet soil produces lush foliage but fewer blooms. No deadheading required — plants are self-cleaning. Double-flowered varieties hold blooms open longer in overcast conditions.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Portulaca in Other Locations
Frequently Asked Questions
When should I plant Portulaca in Davis County, UT?
Davis County is in Zone 7a with an average last frost of May 6. Plan your Portulaca planting based on this frost date — see the calendar above for exact timing.
What planting zone is Davis County, UT?
Davis County, Utah is in USDA Hardiness Zone 7a. The average last spring frost is May 6 and first fall frost is October 10.
Your Davis County Garden Planner — Free
A 22-page printable planner built for Davis County (Zone 7a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.