When to Plant Portulaca in Cache County, UT
This month in Cache County, Utah
If you only do a handful of things in the garden this June, make it these. They're sequenced around your zone's frost timing.
-
Move portulaca from tray to bed
Frost risk is low now in Cache County, Utah. If you've been covering beds overnight, you can stop.
-
Seed portulaca outdoors
Succession planting is the secret here. Put in a row now, another in 2 weeks, a third in 4.
Before July arrives, get these ready
- Starting indoors: portulaca
Portulaca (Portulaca grandiflora), commonly called moss rose, is a succulent- stemmed annual built for hot, dry, low-fertility conditions where other flowers fail. Its silky, rose-like blooms open in full sun and close at night or on cloudy days. Excellent for slopes, rock gardens, containers, and parking-strip plantings where irrigation is limited. One of the easiest annuals for neglect- proof summer color.
Cache County, Utah is in USDA Zone 6a. The average last spring frost is June 11 and the first fall frost is September 2, giving you a growing season of approximately 83 days.
At an elevation of 6,265 feet, Cache County receives approximately 15.5 inches of rainfall annually with predominantly loam soil. Summer highs average 84°F, so choose short-season varieties of Portulaca to ensure they mature before fall. With low rainfall, drip irrigation is essential for growing Portulaca successfully. Mulch heavily to conserve soil moisture.
Cache County Soil Profile
Soil Type
Loam
Soil pH
6.6-8.4
Drainage
Well Drained
Portulaca Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Cache County
How your county's soil matches Portulaca's growing requirements.
Soil pH
Your soil pH (6.6–8.4) is more alkaline than Portulaca prefers (5.5–7.0). Add sulfur or peat moss to lower pH.
Soil Texture
The loam soil in Cache County is excellent for Portulaca — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.3%). Annual compost additions will help Portulaca.
How to Plant Portulaca
Portulaca Water Budget
Water stress score is 10/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Portulaca
Portulaca needs approximately 0.5 inches of water per week (2.2" per month). Here's how your county's rainfall compares month by month.
| Month | Portulaca Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.1" | 0" | ❄️ Dormant |
| Feb | — | 0.9" | 0" | ❄️ Dormant |
| Mar | — | 1.3" | 0" | ❄️ Dormant |
| Apr | — | 1.7" | 0" | ❄️ Dormant |
| May | — | 2" | 0" | ❄️ Dormant |
| Jun | 2.2" | 1.1" | 1.1" | 🚿 Regular watering |
| Jul | 2.2" | 1.3" | 0.9" | 💧 Light watering |
| Aug | 2.2" | 1.5" | 0.7" | 💧 Light watering |
| Sep | 2.2" | 1.3" | 0.9" | 💧 Light watering |
| Oct | — | 1.4" | 0" | ❄️ Dormant |
| Nov | — | 1.1" | 0" | ❄️ Dormant |
| Dec | — | 0.8" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Jun–Sep in Cache County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Portulaca Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Portulaca Planting Timeline — Cache County, UT
Portulaca Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | May 7 | May 7 – May 21 |
| Transplant Outdoors | June 18 | Jun 18 – Jul 2 |
| Direct Sow | June 18 | Jun 18 – Jul 9 |
| Bloom | August 6 | Aug 6 – Nov 19 |
· 8" apart · Rows 10" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | — |
| May | Start Indoors |
| June | Transplant Outdoors Direct Sow |
| July | Transplant Outdoors Direct Sow |
| August | Bloom |
| September | Bloom |
| October | Bloom |
| November | Bloom |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
0.5"/week · Natural rainfall sufficient
📅 Days to Maturity
50–70 days
🧪 Soil pH
Needs 5.5–7 · Your soil: too_alkaline
🗺️ USDA Zone
Zone 6a
📆 Growing Season
83 days in Cache County
Growing Tips for Portulaca in Cache County
Direct sow Portulaca outdoors after June 11 in Cache County when soil has warmed and frost danger has passed.
Cache County receives only 16" of rain annually. Portulaca needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.
General growing tips
Direct-sow after last frost once soil warms to 65°F, or start indoors 4–6 weeks before last frost. Seed is tiny — surface sow and do not cover. Thin to proper spacing after germination. Thrives in poor, well-drained soil; rich or wet soil produces lush foliage but fewer blooms. No deadheading required — plants are self-cleaning. Double-flowered varieties hold blooms open longer in overcast conditions.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Portulaca in Other Locations
Frequently Asked Questions
When should I plant Portulaca in Cache County, UT?
Cache County is in Zone 6a with an average last frost of June 11. Plan your Portulaca planting based on this frost date — see the calendar above for exact timing.
What planting zone is Cache County, UT?
Cache County, Utah is in USDA Hardiness Zone 6a. The average last spring frost is June 11 and first fall frost is September 2.
Your Cache County Garden Planner — Free
A 22-page printable planner built for Cache County (Zone 6a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.