Blog

When to Plant Lovage in Wheeler County, OR

Wheeler County, Oregon Zone 7a June

Your June gardening checklist

If you only do a handful of things in the garden this June, make it these. They're sequenced around your zone's frost timing.

Avg. last frost May 23
Avg. first frost September 23
Soil temp (4") 65°F
Watering Critical
Pest pressure High
Daylight 15.4 hrs

Instant PDF download. No spam, unsubscribe any time.

Lovage is a large perennial herb with a celery-like flavor that can grow 4-6 feet tall. All parts are edible including the leaves, stems, seeds, and roots.

Wheeler County, Oregon is in USDA Zone 7a. The average last spring frost is May 23 and the first fall frost is September 23, giving you a growing season of approximately 123 days.

At an elevation of 2,175 feet, Wheeler County receives approximately 22.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 83°F, so choose short-season varieties of Lovage to ensure they mature before fall.

Wheeler County, OR (Zone 7a) Short season
123 days
Last Spring Frost May 23
123 growing days
First Fall Frost September 23

Wheeler County Soil Profile

Soil Type

Silt Loam

Soil pH

5.2-6.3

Drainage

Well Drained

Lovage Planting Risk Windows

Early Start (70% safe) ✗ May not fit
Transplant: May 23 🍅 Harvest: Aug 1 – Oct 3
Recommended (50%) ✗ May not fit
Transplant: May 30 🍅 Harvest: Aug 8 – Oct 10
Safe Start (90%) ✗ May not fit
Transplant: Jun 26 🍅 Harvest: Sep 4 – Nov 6

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Wheeler County

How your county's soil matches Lovage's growing requirements.

Soil pH

Your soil pH (5.2–6.3) is more acidic than Lovage prefers (6.0–7.0). Add garden lime to raise pH.

Soil Texture

The silt loam soil in Wheeler County is excellent for Lovage — good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is excellent (5.7%) — Lovage will thrive.

How to Plant Lovage

0.5"
Planting Depth
8"
Between Plants
12"
Between Rows

Lovage Water Budget

Plant needs
1.0″/week
Rainfall provides
0.8″/week
You supply
0.2″/week
Watering frequency Only during dry spells
Season total 242 gal / 100 sq ft

Monthly Watering Guide for Lovage

Lovage needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Lovage Needs Rainfall You Supplement Action
Jan 3" 0" ❄️ Dormant
Feb 2.3" 0" ❄️ Dormant
Mar 2.6" 0" ❄️ Dormant
Apr 1.6" 0" ❄️ Dormant
May 4.3" 1.5" 2.8" 🚿 Regular watering
Jun 4.3" 1" 3.3" 🚿 Regular watering
Jul 4.3" 0.4" 3.9" 🚿 Regular watering
Aug 4.3" 0.4" 3.9" 🚿 Regular watering
Sep 4.3" 0.8" 3.5" 🚿 Regular watering
Oct 2.1" 0" ❄️ Dormant
Nov 3.3" 0" ❄️ Dormant
Dec 3.8" 0" ❄️ Dormant

Water needs are for active growing months only (May–Sep in Wheeler County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Lovage Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Lovage needs ~980 GDD — county provides 1,506 GDD Excellent fit

Lovage Planting Timeline — Wheeler County, OR

Lovage Planting Calendar

Activity When Date Range
Transplant Outdoors May 30 May 30 – Jun 13
Harvest August 8 Aug 8 – Oct 10

Plant 0.5" deep · 8" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April
May Transplant Outdoors
June Transplant Outdoors
July
August Harvest
September Harvest
October Harvest
November
December

Growing Conditions

☀️ Sun

Partial Shade (3-6 hours)

💧 Water

1"/week · Only during dry spells

📅 Days to Maturity

70–90 days

🧪 Soil pH

Needs 6–7 · Your soil: too_acidic

🗺️ USDA Zone

Zone 7a

📆 Growing Season

123 days in Wheeler County

Growing Tips for Lovage in Wheeler County

Direct sow Lovage outdoors after May 23 in Wheeler County when soil has warmed and frost danger has passed.

Common pests for Lovage in this region include carrot rust fly and parsleyworm. Use row covers early in the season and inspect plants weekly.

Wheeler County receives only 23" of rain annually. Lovage needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.

General growing tips

Start seeds indoors or direct sow in spring. One plant is usually enough for a family. Harvest outer stems and leaves as needed. Divide clumps every 3-4 years.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Lovage in Wheeler County, OR?

Wheeler County is in Zone 7a with an average last frost of May 23. Plan your Lovage planting based on this frost date — see the calendar above for exact timing.

What planting zone is Wheeler County, OR?

Wheeler County, Oregon is in USDA Hardiness Zone 7a. The average last spring frost is May 23 and first fall frost is September 23.

🌱

Your Wheeler County Garden Planner — Free

A 22-page printable planner built for Wheeler County (Zone 7a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Wheeler County, OR. Local conditions may vary. Last updated: June 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.