When to Plant Celtuce in Murphy, OR
Celtuce (stem lettuce) is a Chinese vegetable grown for its thick, crunchy stem rather than its leaves. The peeled stem has a mild, cucumber-like flavor.
Murphy, Oregon is in USDA Zone 8b. The average last spring frost is April 22 and the first fall frost is October 20, giving you a growing season of approximately 181 days.
At an elevation of 340 feet, Josephine County receives approximately 52.9 inches of rainfall annually with predominantly silt loam soil. Summer highs average 90°F, providing good warmth for Celtuce during the growing season. Ample rainfall means less supplemental watering, but ensure good drainage to prevent Celtuce root diseases.
Murphy Soil Profile
Soil Type
Silt Loam
Soil pH
5.7-6.2
Drainage
Well Drained
Monthly Watering Guide for Celtuce
Celtuce needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Celtuce Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 8.4" | 0" | ❄️ Dormant |
| Feb | — | 6.6" | 0" | ❄️ Dormant |
| Mar | — | 6.2" | 0" | ❄️ Dormant |
| Apr | 4.3" | 3.6" | 0.7" | 💧 Light watering |
| May | 4.3" | 2.7" | 1.6" | 💧 Light watering |
| Jun | 4.3" | 2" | 2.3" | 🚿 Regular watering |
| Jul | 4.3" | 0.8" | 3.5" | 🚿 Regular watering |
| Aug | 4.3" | 0.9" | 3.4" | 🚿 Regular watering |
| Sep | 4.3" | 1.9" | 2.4" | 🚿 Regular watering |
| Oct | 4.3" | 4.4" | 0" | ✅ Rainfall sufficient |
| Nov | — | 7.4" | 0" | ❄️ Dormant |
| Dec | — | 8.2" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Josephine County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Celtuce Planting Timeline — Murphy, OR
Celtuce Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 18 | Mar 18 – Apr 1 |
| Transplant Outdoors | April 22 | Apr 22 – May 6 |
| Direct Sow | April 8 | Apr 8 – Apr 29 |
| Harvest | June 24 | Jun 24 – Aug 5 |
| Fall Sowing | August 11 | Aug 11 – Aug 25 |
Plant 0.5" deep · 6" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | Start Indoors |
| April | Start Indoors Transplant Outdoors Direct Sow |
| May | Transplant Outdoors |
| June | Harvest |
| July | Harvest |
| August | Fall Sowing Harvest |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
Moderate — regular watering
📅 Days to Maturity
60–90 days
🧪 Soil pH
Needs 6–7 · Your soil: N/A
🗺️ USDA Zone
Zone 8b
📆 Growing Season
181 days in Josephine County
Growing Tips for Murphy
Direct sow in spring or start indoors. Space 12 inches apart. Harvest when stems are about 1 inch in diameter. Peel the tough outer skin to reveal the tender center.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Celtuce in Other Locations
Your Josephine County Garden Planner — Free
A 22-page printable planner built for Josephine County (Zone 8b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.