Blog

When to Plant Escarole in Mitchell, OR

Escarole is a broad-leaved endive with slightly bitter, sturdy leaves. The outer leaves are more bitter while the blanched heart is tender and mild.

Mitchell, Oregon is in USDA Zone 7a. The average last spring frost is May 23 and the first fall frost is September 23, giving you a growing season of approximately 123 days.

At an elevation of 2,175 feet, Wheeler County receives approximately 22.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 83°F, so choose short-season varieties of Escarole to ensure they mature before fall.

Mitchell, OR (Zone 7a) Short season
123 days
Last Spring Frost May 23
123 growing days
First Fall Frost September 23

Mitchell Soil Profile

Soil Type

Silt Loam

Soil pH

5.2-6.3

Drainage

Well Drained

Monthly Watering Guide for Escarole

Escarole needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Escarole Needs Rainfall You Supplement Action
Jan 3" 0" ❄️ Dormant
Feb 2.3" 0" ❄️ Dormant
Mar 2.6" 0" ❄️ Dormant
Apr 1.6" 0" ❄️ Dormant
May 4.3" 1.5" 2.8" 🚿 Regular watering
Jun 4.3" 1" 3.3" 🚿 Regular watering
Jul 4.3" 0.4" 3.9" 🚿 Regular watering
Aug 4.3" 0.4" 3.9" 🚿 Regular watering
Sep 4.3" 0.8" 3.5" 🚿 Regular watering
Oct 2.1" 0" ❄️ Dormant
Nov 3.3" 0" ❄️ Dormant
Dec 3.8" 0" ❄️ Dormant

Water needs are for active growing months only (May–Sep in Wheeler County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Escarole Planting Timeline — Mitchell, OR

Escarole Planting Calendar

Activity When Date Range
Start Indoors April 18 Apr 18 – May 2
Transplant Outdoors May 23 May 23 – Jun 6
Direct Sow May 9 May 9 – May 30
Harvest July 18 Jul 18 – Aug 15
Fall Sowing July 15 Jul 15 – Jul 29

Plant 0.5" deep · 6" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April Start Indoors
May Start Indoors Transplant Outdoors Direct Sow
June Transplant Outdoors
July Fall Sowing Harvest
August Harvest
September
October
November
December

Growing Conditions

☀️ Sun

Partial Shade (3-6 hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

50–70 days

🧪 Soil pH

Needs 5.5–7 · Your soil: N/A

🗺️ USDA Zone

Zone 7a

📆 Growing Season

123 days in Wheeler County

Growing Tips for Mitchell

Direct sow in spring or late summer. Blanch heads by tying outer leaves together or covering with a pot for 2 weeks before harvest. Excellent braised or in soups.

Companion Planting

Good Companions

Avoid Planting Near

  • Fennel

Check more plant combinations with our Companion Planting Checker →

🌱

Your Wheeler County Garden Planner — Free

A 22-page printable planner built for Wheeler County (Zone 7a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Wheeler County, OR. Local conditions may vary. Last updated: July 2026.