Blog

When to Plant Mache in Linn County, OR

Mache (corn salad) is a cold-hardy salad green with small, rounded, tender leaves and a mild, nutty flavor. It thrives in cool weather and even overwinters in many climates.

Linn County, Oregon is in USDA Zone 8a. The average last spring frost is April 22 and the first fall frost is October 25, giving you a growing season of approximately 186 days.

At an elevation of 259 feet, Linn County receives approximately 37.2 inches of rainfall annually with predominantly silt loam soil. Summer highs average 81ยฐF, so choose short-season varieties of Mache to ensure they mature before fall.

Linn County, OR (Zone 8a) Moderate season
186 days
Last Spring Frost April 22
186 growing days
First Fall Frost October 25

Linn County Soil Profile

Soil Type

Silt Loam

Soil pH

5.6-6.3

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (108 days to spare)
Start indoors: Mar 11 Transplant: Apr 15 🍅 Harvest: May 27 – Jul 1
Recommended (50%) ✓ Fits season (109 days to spare)
Start indoors: Mar 18 Transplant: Apr 22 🍅 Harvest: Jun 3 – Jul 8
Safe Start (90%) ✓ Fits season (112 days to spare)
Start indoors: Apr 10 Transplant: May 15 🍅 Harvest: Jun 26 – Jul 31

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Linn County

How your county's soil matches Mache's growing requirements.

Soil pH

Your soil pH (5.6โ€“6.3) is more acidic than Mache prefers (6.0โ€“7.5). Add garden lime to raise pH.

Soil Texture

The silt loam soil in Linn County is excellent for Mache โ€” good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is excellent (5.4%) โ€” Mache will thrive.

How to Plant Mache

0.5"
Planting Depth
6"
Between Plants
12"
Between Rows

Fall planting: Sow 10 weeks before your first frost date for a fall harvest.

Succession Planting Mache

5
successive plantings in your 186-day season

Sow every 4.6 weeks. Last sowing by Aug 26 to harvest before frost.

For a dedicated fall crop, sow by Aug 16.

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.8″/week
You supply
0.2″/week
Watering frequency Only during dry spells
Season total 265 gal / 100 sq ft

Monthly Watering Guide for Mache

Mache needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Mache Needs Rainfall You Supplement Action
Jan โ€” 5.8" 0" โ„๏ธ Dormant
Feb โ€” 3.8" 0" โ„๏ธ Dormant
Mar โ€” 4.2" 0" โ„๏ธ Dormant
Apr 4.3" 2.7" 1.6" ๐Ÿ’ง Light watering
May 4.3" 2" 2.3" ๐Ÿšฟ Regular watering
Jun 4.3" 1.4" 2.9" ๐Ÿšฟ Regular watering
Jul 4.3" 0.6" 3.7" ๐Ÿšฟ Regular watering
Aug 4.3" 0.6" 3.7" ๐Ÿšฟ Regular watering
Sep 4.3" 1.4" 2.9" ๐Ÿšฟ Regular watering
Oct 4.3" 3.5" 0.8" ๐Ÿ’ง Light watering
Nov โ€” 5.4" 0" โ„๏ธ Dormant
Dec โ€” 5.9" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Aprโ€“Oct in Linn County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Mache Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Mache needs ~538 GDD — county provides 1,999 GDD Excellent fit

Mache Planting Timeline โ€” Linn County, OR

Mache Planting Calendar

Activity When Date Range
Start Indoors March 18 Mar 18 โ€“ Apr 1
Transplant Outdoors April 22 Apr 22 โ€“ May 6
Direct Sow April 8 Apr 8 โ€“ Apr 29
Harvest June 3 Jun 3 โ€“ Jul 8
Fall Sowing August 16 Aug 16 โ€“ Aug 30

Plant 0.5" deep ยท 6" apart ยท Rows 12" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March Start Indoors
April Start Indoors Transplant Outdoors Direct Sow
May Transplant Outdoors
June Harvest
July Harvest
August Fall Sowing
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Partial Shade (3-6 hours)

๐Ÿ’ง Water

1"/week ยท Only during dry spells

๐Ÿ“… Days to Maturity

40โ€“60 days

๐Ÿงช Soil pH

Needs 6โ€“7.5 ยท Your soil: too_acidic

๐Ÿ—บ๏ธ USDA Zone

Zone 8a

๐Ÿ“† Growing Season

186 days in Linn County

Growing Tips for Mache in Linn County

Direct sow Mache outdoors after April 22 in Linn County when soil has warmed and frost danger has passed.

Your generous 186.0-day season in Linn County allows multiple plantings of Mache. Sow every 20.0 days for continuous harvest.

General growing tips

Direct sow in early spring or late summer for fall and winter harvest. Seeds need light to germinate so press gently into soil surface. Harvest whole rosettes.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Mache in Linn County, OR?

Linn County is in Zone 8a with an average last frost of April 22. Plan your Mache planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Linn County, OR?

Linn County, Oregon is in USDA Hardiness Zone 8a. The average last spring frost is April 22 and first fall frost is October 25.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Linn County gardeners in Zone 8a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Linn County, OR. Local conditions may vary. Last updated: April 2026.