When to Plant Mache in Josephine County, OR
Mache (corn salad) is a cold-hardy salad green with small, rounded, tender leaves and a mild, nutty flavor. It thrives in cool weather and even overwinters in many climates.
Josephine County, Oregon is in USDA Zone 8b. The average last spring frost is April 22 and the first fall frost is October 20, giving you a growing season of approximately 181 days.
At an elevation of 340 feet, Josephine County receives approximately 52.9 inches of rainfall annually with predominantly silt loam soil. Summer highs average 90°F, providing good warmth for Mache during the growing season. Ample rainfall means less supplemental watering, but ensure good drainage to prevent Mache root diseases.
Josephine County Soil Profile
Soil Type
Silt Loam
Soil pH
5.7-6.2
Drainage
Well Drained
Monthly Watering Guide for Mache
Mache needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Mache Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 8.4" | 0" | ❄️ Dormant |
| Feb | — | 6.6" | 0" | ❄️ Dormant |
| Mar | — | 6.2" | 0" | ❄️ Dormant |
| Apr | 4.3" | 3.6" | 0.7" | 💧 Light watering |
| May | 4.3" | 2.7" | 1.6" | 💧 Light watering |
| Jun | 4.3" | 2" | 2.3" | 🚿 Regular watering |
| Jul | 4.3" | 0.8" | 3.5" | 🚿 Regular watering |
| Aug | 4.3" | 0.9" | 3.4" | 🚿 Regular watering |
| Sep | 4.3" | 1.9" | 2.4" | 🚿 Regular watering |
| Oct | 4.3" | 4.4" | 0" | ✅ Rainfall sufficient |
| Nov | — | 7.4" | 0" | ❄️ Dormant |
| Dec | — | 8.2" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Josephine County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Mache Planting Timeline — Josephine County, OR
Mache Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 18 | Mar 18 – Apr 1 |
| Transplant Outdoors | April 22 | Apr 22 – May 6 |
| Direct Sow | April 8 | Apr 8 – Apr 29 |
| Harvest | June 3 | Jun 3 – Jul 8 |
| Fall Sowing | August 11 | Aug 11 – Aug 25 |
Plant 0.5" deep · 6" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | Start Indoors |
| April | Start Indoors Transplant Outdoors Direct Sow |
| May | Transplant Outdoors |
| June | Harvest |
| July | Harvest |
| August | Fall Sowing |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
Moderate — regular watering
📅 Days to Maturity
40–60 days
🧪 Soil pH
Needs 6–7.5 · Your soil: N/A
🗺️ USDA Zone
Zone 8b
📆 Growing Season
181 days in Josephine County
Growing Tips for Josephine County
Direct sow in early spring or late summer for fall and winter harvest. Seeds need light to germinate so press gently into soil surface. Harvest whole rosettes.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Mache in Other Locations
Frequently Asked Questions
When should I plant Mache in Josephine County, OR?
Josephine County is in Zone 8b with an average last frost of April 22. Plan your Mache planting based on this frost date — see the calendar above for exact timing.
What planting zone is Josephine County, OR?
Josephine County, Oregon is in USDA Hardiness Zone 8b. The average last spring frost is April 22 and first fall frost is October 20.
Your Josephine County Garden Planner — Free
A 22-page printable planner built for Josephine County (Zone 8b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.