When to Plant Shiso in Le Flore County, OK
May in Le Flore County, Oklahoma — your action list
If you only do a handful of things in the garden this May, make it these. They're sequenced around your zone's frost timing.
-
Indoor seed-starting week for shiso
Your window is short. These crops want several weeks of indoor growth before they go outside.
To set up a strong June, finish these tasks
- First harvests: shiso
Shiso (perilla) is a fragrant Japanese herb with large, ruffled leaves in green or purple varieties. It has a unique flavor combining mint, basil, and anise.
Le Flore County, Oklahoma is in USDA Zone 7b. The average last spring frost is April 5 and the first fall frost is October 31, giving you a growing season of approximately 209 days.
At an elevation of 782 feet, Le Flore County receives approximately 29.4 inches of rainfall annually with predominantly loam soil. Summer highs average 89°F, providing good warmth for Shiso during the growing season.
Le Flore County Soil Profile
Soil Type
Loam
Soil pH
6.8-7.5
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Le Flore County
How your county's soil matches Shiso's growing requirements.
Soil pH
Your soil pH (6.8–7.5) is more alkaline than Shiso prefers (5.5–7.0). Add sulfur or peat moss to lower pH.
Soil Texture
The loam soil in Le Flore County is excellent for Shiso — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (3.5%). Annual compost additions will help Shiso.
How to Plant Shiso
Succession Planting Shiso
Sow every 5.7 weeks. Last sowing by Aug 22 to harvest before frost.
Plant Water Budget
Water stress score is 6/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Shiso
Shiso needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Shiso Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 0.8" | 0" | ❄️ Dormant |
| Feb | — | 0.9" | 0" | ❄️ Dormant |
| Mar | — | 2.1" | 0" | ❄️ Dormant |
| Apr | 4.3" | 3" | 1.3" | 💧 Light watering |
| May | 4.3" | 4.4" | 0" | ✅ Rainfall sufficient |
| Jun | 4.3" | 4.8" | 0" | ✅ Rainfall sufficient |
| Jul | 4.3" | 3.2" | 1.1" | 💧 Light watering |
| Aug | 4.3" | 3.8" | 0.5" | 💧 Light watering |
| Sep | 4.3" | 2.8" | 1.5" | 💧 Light watering |
| Oct | 4.3" | 2.1" | 2.2" | 🚿 Regular watering |
| Nov | — | 0.9" | 0" | ❄️ Dormant |
| Dec | — | 0.7" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Le Flore County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Shiso Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Shiso Planting Timeline — Le Flore County, OK
Shiso Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | February 15 | Feb 15 – Mar 1 |
| Transplant Outdoors | April 19 | Apr 19 – May 3 |
| Direct Sow | April 12 | Apr 12 – May 3 |
| Harvest | June 14 | Jun 14 – Aug 9 |
Plant 0.5" deep · 8" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | Start Indoors |
| March | Start Indoors |
| April | Transplant Outdoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Harvest |
| August | Harvest |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · 1-2 times/week
📅 Days to Maturity
50–70 days
🧪 Soil pH
Needs 5.5–7 · Your soil: too_alkaline
🗺️ USDA Zone
Zone 7b
📆 Growing Season
209 days in Le Flore County
Growing Tips for Shiso in Le Flore County
Direct sow Shiso outdoors after April 05 in Le Flore County when soil has warmed and frost danger has passed.
General growing tips
Direct sow after last frost or start indoors. Both green and red varieties are available. Pinch tips to encourage bushiness. Self-sows prolifically; deadhead to control.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Shiso in Other Locations
Frequently Asked Questions
When should I plant Shiso in Le Flore County, OK?
Le Flore County is in Zone 7b with an average last frost of April 5. Plan your Shiso planting based on this frost date — see the calendar above for exact timing.
What planting zone is Le Flore County, OK?
Le Flore County, Oklahoma is in USDA Hardiness Zone 7b. The average last spring frost is April 5 and first fall frost is October 31.
Your Le Flore County Garden Planner — Free
A 24-page printable planner built for Le Flore County (Zone 7b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.