When to Plant Sweet Pea in Cimarron County, OK
Cimarron County, Oklahoma gardeners: here's your June plan
We've pulled the most time-sensitive tasks for Cimarron County, Oklahoma this June and put them front and centre. Tackle them in order.
Sweet peas (Lathyrus odoratus) are beloved cool-season climbing annuals grown primarily for their intensely fragrant, ruffled blooms in shades of pink, purple, red, and white. They thrive in cool spring conditions, climbing trellises to 4–6 feet, and make outstanding cut flowers. Bloom ceases once summer heat arrives, making early sowing critical for a long cutting season.
Cimarron County, Oklahoma is in USDA Zone 6b. The average last spring frost is April 19 and the first fall frost is October 18, giving you a growing season of approximately 182 days.
At an elevation of 1,132 feet, Cimarron County receives approximately 28.5 inches of rainfall annually with predominantly loam soil. Summer highs average 89°F, providing good warmth for Sweet Pea during the growing season.
Cimarron County Soil Profile
Soil Type
Loam
Soil pH
6.5-7.4
Drainage
Well Drained
Sweet Pea Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Cimarron County
How your county's soil matches Sweet Pea's growing requirements.
Soil pH
Your soil pH (6.5–7.4) is more acidic than Sweet Pea prefers (7.0–7.5). Add garden lime to raise pH.
Soil Texture
The loam soil in Cimarron County is excellent for Sweet Pea — good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Sweet Pea.
Organic Matter
Organic matter is moderate (3.5%). Annual compost additions will help Sweet Pea.
How to Plant Sweet Pea
Succession Planting Sweet Pea
Sow every 7.4 weeks. Last sowing by Jul 25 to harvest before frost.
Sweet Pea Water Budget
Water stress score is 8/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Sweet Pea
Sweet Pea needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Sweet Pea Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 0.7" | 0" | ❄️ Dormant |
| Feb | — | 1.1" | 0" | ❄️ Dormant |
| Mar | — | 1.9" | 0" | ❄️ Dormant |
| Apr | 4.3" | 2.7" | 1.6" | 💧 Light watering |
| May | 4.3" | 4.5" | 0" | ✅ Rainfall sufficient |
| Jun | 4.3" | 5.1" | 0" | ✅ Rainfall sufficient |
| Jul | 4.3" | 3.6" | 0.7" | 💧 Light watering |
| Aug | 4.3" | 2.9" | 1.4" | 💧 Light watering |
| Sep | 4.3" | 2.3" | 2" | 💧 Light watering |
| Oct | 4.3" | 1.9" | 2.4" | 🚿 Regular watering |
| Nov | — | 0.9" | 0" | ❄️ Dormant |
| Dec | — | 0.7" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Cimarron County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Sweet Pea Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Sweet Pea Planting Timeline — Cimarron County, OK
Sweet Pea Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 8 | Mar 8 – Mar 22 |
| Transplant Outdoors | April 19 | Apr 19 – May 3 |
| Direct Sow | March 15 | Mar 15 – Apr 5 |
| Bloom | July 5 | Jul 5 – Sep 13 |
Plant 0.5" deep · 6" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | Start Indoors Direct Sow |
| April | Transplant Outdoors Direct Sow |
| May | Transplant Outdoors |
| June | — |
| July | Bloom |
| August | Bloom |
| September | Bloom |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
1"/week · 2-3 times/week
📅 Days to Maturity
65–85 days
🧪 Soil pH
Needs 7–7.5 · Your soil: too_acidic
🗺️ USDA Zone
Zone 6b
📆 Growing Season
182 days in Cimarron County
Growing Tips for Sweet Pea in Cimarron County
Direct sow Sweet Pea outdoors after April 19 in Cimarron County when soil has warmed and frost danger has passed.
Common pests for Sweet Pea in this region include bean beetles and aphids. Use row covers early in the season and inspect plants weekly.
General growing tips
Soak seeds 24 hours before sowing to soften the hard seed coat; nick the seed coat with a file for the fastest germination. In cold zones (2–6), direct-sow as soon as soil can be worked, 4–6 weeks before last frost; seedlings tolerate light frost but not a hard freeze. In zones 7–9, fall-sow 8–10 weeks before first frost for earlier, stronger spring bloom. Provide a trellis or netting from the start. Feed with low-nitrogen, high-potassium fertilizer once buds form. Pick blooms regularly — even one mature seed pod stops flower production. All plant parts are mildly toxic if eaten.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Sweet Pea in Other Locations
Frequently Asked Questions
When should I plant Sweet Pea in Cimarron County, OK?
Cimarron County is in Zone 6b with an average last frost of April 19. Plan your Sweet Pea planting based on this frost date — see the calendar above for exact timing.
What planting zone is Cimarron County, OK?
Cimarron County, Oklahoma is in USDA Hardiness Zone 6b. The average last spring frost is April 19 and first fall frost is October 18.
Your Cimarron County Garden Planner — Free
A 22-page printable planner built for Cimarron County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.