Blog

When to Plant Mint in Divide County, ND

Mint
Divide County, North Dakota Zone 4a June

This month in Divide County, North Dakota

Your Divide County, North Dakota garden is entering a new phase. Here's what's on the schedule for June and why each task matters now.

Avg. last frost May 15
Avg. first frost September 20
Soil temp (4") 59°F
Watering High
Pest pressure Moderate
Daylight 15.9 hrs
Get ahead of July
  • First harvests: mint

Instant PDF download. No spam, unsubscribe any time.

Mint is a vigorous perennial herb with refreshing, aromatic leaves used in teas, cocktails, and cooking. It spreads aggressively by underground runners.

Divide County, North Dakota is in USDA Zone 4a. The average last spring frost is May 15 and the first fall frost is September 20, giving you a growing season of approximately 128 days.

At an elevation of 994 feet, Divide County receives approximately 20.5 inches of rainfall annually with predominantly loam soil. Summer highs average 79°F, so choose short-season varieties of Mint to ensure they mature before fall.

Divide County, ND (Zone 4a) Short season
128 days
Last Spring Frost May 15
128 growing days
First Fall Frost September 20

Divide County Soil Profile

Soil Type

Loam

Soil pH

6.2-7.6

Drainage

Well Drained

Mint Planting Risk Windows

Early Start (70% safe) ✗ May not fit
Transplant: May 19 🍅 Harvest: Jul 21 – Sep 29
Recommended (50%) ✗ May not fit
Transplant: May 22 🍅 Harvest: Jul 24 – Oct 2
Safe Start (90%) ✗ May not fit
Transplant: Jun 3 🍅 Harvest: Aug 5 – Oct 14

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Divide County

How your county's soil matches Mint's growing requirements.

Soil pH

Your soil pH (6.2–7.6) overlaps with Mint's range (6.0–7.0), though not a perfect match.

Soil Texture

The loam soil in Divide County is excellent for Mint — good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (3.9%). Annual compost additions will help Mint.

How to Plant Mint

0.5"
Planting Depth
8"
Between Plants
12"
Between Rows

Succession Planting Mint

2
successive plantings in your 128-day season

Sow every 6.9 weeks. Last sowing by Jun 22 to harvest before frost.

Mint Water Budget

Plant needs
0.7″/week
Rainfall provides
0.7″/week
You supply
0.0″/week
Watering frequency Only during dry spells
Season total 37 gal / 100 sq ft
Drought risk

Water stress score is 10/10 — consider drought-tolerant varieties and mulching

Monthly Watering Guide for Mint

Mint needs approximately 0.7 inches of water per week (3" per month). Here's how your county's rainfall compares month by month.

Month Mint Needs Rainfall You Supplement Action
Jan 1.3" 0" ❄️ Dormant
Feb 1.4" 0" ❄️ Dormant
Mar 2" 0" ❄️ Dormant
Apr 2" 0" ❄️ Dormant
May 3" 2.8" 0.2" 💧 Light watering
Jun 3" 1.3" 1.7" 🚿 Regular watering
Jul 3" 1.7" 1.3" 💧 Light watering
Aug 3" 2.1" 0.9" 💧 Light watering
Sep 3" 1.8" 1.2" 💧 Light watering
Oct 1.7" 0" ❄️ Dormant
Nov 1.4" 0" ❄️ Dormant
Dec 1.1" 0" ❄️ Dormant

Water needs are for active growing months only (May–Sep in Divide County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Mint Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Mint needs ~694 GDD — county provides 1,184 GDD Excellent fit

Mint Planting Timeline — Divide County, ND

Mint Planting Calendar

Activity When Date Range
Transplant Outdoors May 22 May 22 – Jun 5
Harvest July 24 Jul 24 – Oct 2

Plant 0.5" deep · 8" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April
May Transplant Outdoors
June Transplant Outdoors
July Harvest
August Harvest
September Harvest
October Harvest
November
December

Growing Conditions

☀️ Sun

Partial Shade (3-6 hours)

💧 Water

0.7"/week · Only during dry spells

📅 Days to Maturity

60–90 days

🧪 Soil pH

Needs 6–7 · Your soil: acceptable

🗺️ USDA Zone

Zone 4a

📆 Growing Season

128 days in Divide County

Growing Tips for Mint in Divide County

Direct sow Mint outdoors after May 15 in Divide County when soil has warmed and frost danger has passed.

General growing tips

Always grow mint in containers or with underground barriers to control spreading. Harvest regularly to keep plants compact. Cut plants back in late summer for a fresh fall flush.

Companion Planting

Good Companions

Avoid Planting Near

  • Parsley

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Mint in Divide County, ND?

Divide County is in Zone 4a with an average last frost of May 15. Plan your Mint planting based on this frost date — see the calendar above for exact timing.

What planting zone is Divide County, ND?

Divide County, North Dakota is in USDA Hardiness Zone 4a. The average last spring frost is May 15 and first fall frost is September 20.

🌱

Your Divide County Garden Planner — Free

A 22-page printable planner built for Divide County (Zone 4a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Divide County, ND. Local conditions may vary. Last updated: June 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.