When to Plant Che Fruit in Hamilton County, NE
Your May planting checklist for Hamilton County, Nebraska
Welcome to May in Zone 5b. These are the moves that will have the biggest impact on your growing season.
-
Plant out che fruit
Pick a cloudy afternoon or evening to plant. Less transplant shock, and your seedlings will barely blink.
Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.
Hamilton County, Nebraska is in USDA Zone 5b. The average last spring frost is April 25 and the first fall frost is October 10, giving you a growing season of approximately 168 days.
At an elevation of 861 feet, Hamilton County receives approximately 33.8 inches of rainfall annually with predominantly loam soil. Summer highs average 85°F, providing good warmth for Che Fruit during the growing season.
Hamilton County Soil Profile
Soil Type
Loam
Soil pH
6.3-7.5
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Hamilton County
How your county's soil matches Che Fruit's growing requirements.
Soil pH
Your soil pH (6.3–7.5) is within Che Fruit's preferred range (6.0–7.5).
Soil Texture
The loam soil in Hamilton County is excellent for Che Fruit — good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Che Fruit.
Organic Matter
Organic matter is moderate (3.5%). Annual compost additions will help Che Fruit.
How to Plant Che Fruit
Plant Water Budget
Water stress score is 6/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Che Fruit
Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Che Fruit Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 0.8" | 0" | ❄️ Dormant |
| Feb | — | 1" | 0" | ❄️ Dormant |
| Mar | — | 2" | 0" | ❄️ Dormant |
| Apr | 4.3" | 3.3" | 1" | 💧 Light watering |
| May | 4.3" | 4.5" | 0" | ✅ Rainfall sufficient |
| Jun | 4.3" | 5.1" | 0" | ✅ Rainfall sufficient |
| Jul | 4.3" | 4.6" | 0" | ✅ Rainfall sufficient |
| Aug | 4.3" | 4.7" | 0" | ✅ Rainfall sufficient |
| Sep | 4.3" | 3" | 1.3" | 💧 Light watering |
| Oct | 4.3" | 2.5" | 1.8" | 💧 Light watering |
| Nov | — | 1.3" | 0" | ❄️ Dormant |
| Dec | — | 0.9" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Hamilton County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Che Fruit Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Che Fruit Planting Timeline — Hamilton County, NE
Che Fruit Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | May 16 | May 16 – May 30 |
· 120" apart · Rows 144" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | — |
| May | Transplant Outdoors |
| June | — |
| July | — |
| August | — |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
1"/week · 1-2 times/week
📅 Days to Maturity
1095–1825 days
🧪 Soil pH
Needs 6–7.5 · Your soil: ideal
🗺️ USDA Zone
Zone 5b
📆 Growing Season
168 days in Hamilton County
Growing Tips for Che Fruit in Hamilton County
Direct sow Che Fruit outdoors after April 25 in Hamilton County when soil has warmed and frost danger has passed.
Your 168.0-day growing season in Hamilton County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.
General growing tips
Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Che Fruit in Other Locations
Frequently Asked Questions
When should I plant Che Fruit in Hamilton County, NE?
Hamilton County is in Zone 5b with an average last frost of April 25. Plan your Che Fruit planting based on this frost date — see the calendar above for exact timing.
What planting zone is Hamilton County, NE?
Hamilton County, Nebraska is in USDA Hardiness Zone 5b. The average last spring frost is April 25 and first fall frost is October 10.
Your Hamilton County Garden Planner — Free
A 24-page printable planner built for Hamilton County (Zone 5b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.