When to Plant Shiso in Beaverhead County, MT
Beaverhead County, Montana gardeners: here's your May plan
Here's what deserves your attention in Beaverhead County, Montana this month. Everything below is tailored to Zone 5a and timed around your local frost dates.
Before June arrives, get these ready
- Transplants going out: shiso
- Direct-sowing: shiso
Shiso (perilla) is a fragrant Japanese herb with large, ruffled leaves in green or purple varieties. It has a unique flavor combining mint, basil, and anise.
Beaverhead County, Montana is in USDA Zone 5a. The average last spring frost is June 10 and the first fall frost is September 12, giving you a growing season of approximately 94 days.
At an elevation of 7,645 feet, Beaverhead County receives approximately 15.7 inches of rainfall annually with predominantly loam soil. Summer highs average 80°F, so choose short-season varieties of Shiso to ensure they mature before fall. With low rainfall, drip irrigation is essential for growing Shiso successfully. Mulch heavily to conserve soil moisture.
Beaverhead County Soil Profile
Soil Type
Loam
Soil pH
6.8-7.8
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Beaverhead County
How your county's soil matches Shiso's growing requirements.
Soil pH
Your soil pH (6.8–7.8) is more alkaline than Shiso prefers (5.5–7.0). Add sulfur or peat moss to lower pH.
Soil Texture
The loam soil in Beaverhead County is excellent for Shiso — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.9%). Annual compost additions will help Shiso.
How to Plant Shiso
Succession Planting Shiso
Sow every 5.7 weeks. Last sowing by Jul 04 to harvest before frost.
Plant Water Budget
Water stress score is 6/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Shiso
Shiso needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Shiso Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.2" | 0" | ❄️ Dormant |
| Feb | — | 1" | 0" | ❄️ Dormant |
| Mar | — | 1.3" | 0" | ❄️ Dormant |
| Apr | — | 1.8" | 0" | ❄️ Dormant |
| May | — | 1.9" | 0" | ❄️ Dormant |
| Jun | 4.3" | 1.1" | 3.2" | 🚿 Regular watering |
| Jul | 4.3" | 1.3" | 3" | 🚿 Regular watering |
| Aug | 4.3" | 1.6" | 2.7" | 🚿 Regular watering |
| Sep | 4.3" | 1.3" | 3" | 🚿 Regular watering |
| Oct | — | 1.3" | 0" | ❄️ Dormant |
| Nov | — | 1" | 0" | ❄️ Dormant |
| Dec | — | 1" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Jun–Sep in Beaverhead County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Shiso Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Shiso Planting Timeline — Beaverhead County, MT
Shiso Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | April 22 | Apr 22 – May 6 |
| Transplant Outdoors | June 24 | Jun 24 – Jul 8 |
| Direct Sow | June 17 | Jun 17 – Jul 8 |
| Harvest | August 19 | Aug 19 – Oct 14 |
Plant 0.5" deep · 8" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | Start Indoors |
| May | Start Indoors |
| June | Transplant Outdoors Direct Sow |
| July | Transplant Outdoors Direct Sow |
| August | Harvest |
| September | Harvest |
| October | Harvest |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · 1-2 times/week
📅 Days to Maturity
50–70 days
🧪 Soil pH
Needs 5.5–7 · Your soil: too_alkaline
🗺️ USDA Zone
Zone 5a
📆 Growing Season
94 days in Beaverhead County
Growing Tips for Shiso in Beaverhead County
Direct sow Shiso outdoors after June 10 in Beaverhead County when soil has warmed and frost danger has passed.
Beaverhead County receives only 16" of rain annually. Shiso needs consistent moisture — install drip irrigation or water deeply 2-3 times per week.
General growing tips
Direct sow after last frost or start indoors. Both green and red varieties are available. Pinch tips to encourage bushiness. Self-sows prolifically; deadhead to control.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Shiso in Other Locations
Frequently Asked Questions
When should I plant Shiso in Beaverhead County, MT?
Beaverhead County is in Zone 5a with an average last frost of June 10. Plan your Shiso planting based on this frost date — see the calendar above for exact timing.
What planting zone is Beaverhead County, MT?
Beaverhead County, Montana is in USDA Hardiness Zone 5a. The average last spring frost is June 10 and first fall frost is September 12.
Your Beaverhead County Garden Planner — Free
A 24-page printable planner built for Beaverhead County (Zone 5a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.