When to plant Ground Cherry in Webster County, MO
Webster County's 194-day season only supports one Ground Cherry planting per year. Sow between May 2 and May 16 for the best chance at full maturity before October 22.
When to Plant Ground Cherry in Webster County, MO
Ground cherries produce small, sweet, tropical-tasting berries enclosed in papery husks. They are related to tomatillos and cape gooseberries and self-sow readily.
Webster County, Missouri is in USDA Zone 6b. The average last spring frost is April 11 and the first fall frost is October 22, giving you a growing season of approximately 194 days.
At an elevation of 1,274 feet, Webster County receives approximately 38.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89°F, providing good warmth for Ground Cherry during the growing season.
Webster County Soil Profile
Soil Type
Silt Loam
Soil pH
5.6-6.6
Drainage
Well Drained
Monthly Watering Guide for Ground Cherry
Ground Cherry needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Ground Cherry Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.6" | 0" | ❄️ Dormant |
| Feb | — | 1.5" | 0" | ❄️ Dormant |
| Mar | — | 2.8" | 0" | ❄️ Dormant |
| Apr | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| May | 4.3" | 5" | 0" | ✅ Rainfall sufficient |
| Jun | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| Jul | 4.3" | 4.4" | 0" | ✅ Rainfall sufficient |
| Aug | 4.3" | 4.4" | 0" | ✅ Rainfall sufficient |
| Sep | 4.3" | 3" | 1.3" | 💧 Light watering |
| Oct | 4.3" | 3" | 1.3" | 💧 Light watering |
| Nov | — | 2.4" | 0" | ❄️ Dormant |
| Dec | — | 1.8" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Webster County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Ground Cherry Planting Timeline — Webster County, MO
Ground Cherry Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | May 2 | May 2 – May 16 |
| Harvest | July 11 | Jul 11 – Sep 5 |
Plant 1" deep · 15" apart · Rows 24" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | — |
| May | Transplant Outdoors |
| June | — |
| July | Harvest |
| August | Harvest |
| September | Harvest |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
Moderate — regular watering
📅 Days to Maturity
65–80 days
🧪 Soil pH
Needs 6–7.5 · Your soil: N/A
🗺️ USDA Zone
Zone 6b
📆 Growing Season
194 days in Webster County
Growing Tips for Webster County
Start seeds indoors 6-8 weeks before last frost. Let fruits fall to the ground naturally when ripe inside their husks. The husk turns brown and papery when the fruit is ready.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Ground Cherry in Other Locations
Frequently Asked Questions
When should I plant Ground Cherry in Webster County, MO?
Webster County is in Zone 6b with an average last frost of April 11. Plan your Ground Cherry planting based on this frost date — see the calendar above for exact timing.
What planting zone is Webster County, MO?
Webster County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 11 and first fall frost is October 22.
When should I plant Ground Cherry in Webster County, MO?
In Webster County, MO, plant Ground Cherry after the last frost (around April 11) and before the first frost (around October 22). Best results when soil holds above 50°F.
What growing zone is Webster County, MO for Ground Cherry?
Webster County sits in USDA Zone 6b. Ground Cherry grows reliably in zones 4a through 11b, so it's a good fit here.
Can Ground Cherry grow in Webster County's climate?
Yes — Ground Cherry grows well in Webster County's temperate climate. Webster County averages a 194-day frost-free season, with last frost around April 11 and first frost around October 22.
Your Webster County Garden Planner — Free
A 22-page printable planner built for Webster County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.