Blog

When to plant Ground Cherry in Webster County, MO

Webster County's 194-day season only supports one Ground Cherry planting per year. Sow between May 2 and May 16 for the best chance at full maturity before October 22.

When to Plant Ground Cherry in Webster County, MO

Ground cherries produce small, sweet, tropical-tasting berries enclosed in papery husks. They are related to tomatillos and cape gooseberries and self-sow readily.

Webster County, Missouri is in USDA Zone 6b. The average last spring frost is April 11 and the first fall frost is October 22, giving you a growing season of approximately 194 days.

At an elevation of 1,274 feet, Webster County receives approximately 38.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89°F, providing good warmth for Ground Cherry during the growing season.

Webster County, MO (Zone 6b) Moderate season
194 days
Last Spring Frost April 11
194 growing days
First Fall Frost October 22

Webster County Soil Profile

Soil Type

Silt Loam

Soil pH

5.6-6.6

Drainage

Well Drained

Monthly Watering Guide for Ground Cherry

Ground Cherry needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Ground Cherry Needs Rainfall You Supplement Action
Jan 1.6" 0" ❄️ Dormant
Feb 1.5" 0" ❄️ Dormant
Mar 2.8" 0" ❄️ Dormant
Apr 4.3" 4.2" 0.1" 💧 Light watering
May 4.3" 5" 0" ✅ Rainfall sufficient
Jun 4.3" 4.2" 0.1" 💧 Light watering
Jul 4.3" 4.4" 0" ✅ Rainfall sufficient
Aug 4.3" 4.4" 0" ✅ Rainfall sufficient
Sep 4.3" 3" 1.3" 💧 Light watering
Oct 4.3" 3" 1.3" 💧 Light watering
Nov 2.4" 0" ❄️ Dormant
Dec 1.8" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Webster County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Ground Cherry Planting Timeline — Webster County, MO

Ground Cherry Planting Calendar

Activity When Date Range
Transplant Outdoors May 2 May 2 – May 16
Harvest July 11 Jul 11 – Sep 5

Plant 1" deep · 15" apart · Rows 24" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April
May Transplant Outdoors
June
July Harvest
August Harvest
September Harvest
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

65–80 days

🧪 Soil pH

Needs 6–7.5 · Your soil: N/A

🗺️ USDA Zone

Zone 6b

📆 Growing Season

194 days in Webster County

Growing Tips for Webster County

Start seeds indoors 6-8 weeks before last frost. Let fruits fall to the ground naturally when ripe inside their husks. The husk turns brown and papery when the fruit is ready.

Companion Planting

Good Companions

Avoid Planting Near

  • Fennel

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Ground Cherry in Webster County, MO?

Webster County is in Zone 6b with an average last frost of April 11. Plan your Ground Cherry planting based on this frost date — see the calendar above for exact timing.

What planting zone is Webster County, MO?

Webster County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 11 and first fall frost is October 22.

When should I plant Ground Cherry in Webster County, MO?

In Webster County, MO, plant Ground Cherry after the last frost (around April 11) and before the first frost (around October 22). Best results when soil holds above 50°F.

What growing zone is Webster County, MO for Ground Cherry?

Webster County sits in USDA Zone 6b. Ground Cherry grows reliably in zones 4a through 11b, so it's a good fit here.

Can Ground Cherry grow in Webster County's climate?

Yes — Ground Cherry grows well in Webster County's temperate climate. Webster County averages a 194-day frost-free season, with last frost around April 11 and first frost around October 22.

🌱

Your Webster County Garden Planner — Free

A 22-page printable planner built for Webster County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Webster County, MO. Local conditions may vary. Last updated: July 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.