Blog

When to plant Kai Lan in Wayne County County,

Wayne County County's spring Kai Lan window runs March 23 through April 13. most warm-season crops establish quickly once soil holds above 60°F. A second sowing from August 23 to September 6 extends the harvest into fall.

When to Plant Kai Lan in Wayne County, MO

Kai lan (Chinese broccoli) is a brassica grown for its thick, glossy stems and small flower buds. It has a slightly bitter, broccoli-like flavor essential in Cantonese cooking.

Wayne County, Missouri is in USDA Zone 7a. The average last spring frost is April 6 and the first fall frost is November 1, giving you a growing season of approximately 209 days.

At an elevation of 1,103 feet, Wayne County receives approximately 36.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86°F, providing good warmth for Kai Lan during the growing season.

Wayne County, MO (Zone 7a) Long season
209 days
Last Spring Frost April 6
209 growing days
First Fall Frost November 1
Share this guide:

Wayne County Soil Profile

Soil Type

Silt Loam

Soil pH

5.7-7

Drainage

Well Drained

Monthly Watering Guide for Kai Lan

Kai Lan needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Kai Lan Needs Rainfall You Supplement Action
Jan 1.5" 0" ❄️ Dormant
Feb 1.6" 0" ❄️ Dormant
Mar 2.7" 0" ❄️ Dormant
Apr 4.3" 3.7" 0.6" 💧 Light watering
May 4.3" 4.4" 0" ✅ Rainfall sufficient
Jun 4.3" 4.7" 0" ✅ Rainfall sufficient
Jul 4.3" 4.3" 0" ✅ Rainfall sufficient
Aug 4.3" 3.3" 1" 💧 Light watering
Sep 4.3" 3.3" 1" 💧 Light watering
Oct 4.3" 2.7" 1.6" 💧 Light watering
Nov 4.3" 2.5" 1.8" 💧 Light watering
Dec 2" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Nov in Wayne County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Kai Lan Planting Timeline — Wayne County, MO

Kai Lan Planting Calendar

Activity When Date Range
Start Indoors March 2 Mar 2 – Mar 16
Transplant Outdoors April 6 Apr 6 – Apr 20
Direct Sow March 23 Mar 23 – Apr 13
Harvest May 25 May 25 – Jun 22
Fall Sowing August 23 Aug 23 – Sep 6

Plant 0.5" deep · 6" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March Start Indoors Direct Sow
April Transplant Outdoors Direct Sow
May Harvest
June Harvest
July
August Fall Sowing
September Fall Sowing
October
November
December
Share this guide:

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

45–60 days

🧪 Soil pH

Needs 6–7.5 · Your soil: N/A

🗺️ USDA Zone

Zone 7a

📆 Growing Season

209 days in Wayne County

Growing Tips for Wayne County

Direct sow in spring or fall. Harvest when flower buds first appear but before they open. Cut stems at the base to encourage side shoots. Prefers cool weather.

Companion Planting

Good Companions

Avoid Planting Near

  • Strawberries

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Kai Lan in Wayne County, MO?

Wayne County is in Zone 7a with an average last frost of April 6. Plan your Kai Lan planting based on this frost date — see the calendar above for exact timing.

What planting zone is Wayne County, MO?

Wayne County, Missouri is in USDA Hardiness Zone 7a. The average last spring frost is April 6 and first fall frost is November 1.

When should I plant Kai Lan in Wayne County County, ?

In Wayne County County, , plant Kai Lan after the last frost (around April 6) and before the first frost (around November 1). Best results when soil holds above 50°F.

What growing zone is Wayne County County, for Kai Lan?

Wayne County County sits in USDA Zone 7a. Kai Lan grows reliably in zones 2a through 11b, so it's a good fit here.

Can Kai Lan grow in Wayne County County's climate?

Yes — Kai Lan grows well in Wayne County County's temperate climate. Wayne County County averages a 209-day frost-free season, with last frost around April 6 and first frost around November 1.

🌱

Your Wayne County Garden Planner — Free

A 22-page printable planner built for Wayne County (Zone 7a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Wayne County, MO. Local conditions may vary. Last updated: June 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.