When to Plant Shiso in Sullivan County, MO
Sullivan County, Missouri gardeners: here's your May plan
Your garden in Sullivan County, Missouri is working on a schedule, even when you're not. Here's where you should be this May.
-
Transplant shiso outside
Your last frost (April 17) has passed. These warm-season crops can handle outdoor soil now.
June prep starts now
- Starting indoors: shiso
- First harvests: shiso
Shiso (perilla) is a fragrant Japanese herb with large, ruffled leaves in green or purple varieties. It has a unique flavor combining mint, basil, and anise.
Sullivan County, Missouri is in USDA Zone 6a. The average last spring frost is April 17 and the first fall frost is October 17, giving you a growing season of approximately 183 days.
At an elevation of 1,019 feet, Sullivan County receives approximately 34.5 inches of rainfall annually with predominantly silt loam soil. Summer highs average 84°F, so choose short-season varieties of Shiso to ensure they mature before fall.
Sullivan County Soil Profile
Soil Type
Silt Loam
Soil pH
5.5-6.8
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Sullivan County
How your county's soil matches Shiso's growing requirements.
Soil pH
Your soil pH (5.5–6.8) is within Shiso's preferred range (5.5–7.0).
Soil Texture
The silt loam soil in Sullivan County is excellent for Shiso — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (3.1%). Annual compost additions will help Shiso.
How to Plant Shiso
Succession Planting Shiso
Sow every 5.7 weeks. Last sowing by Aug 08 to harvest before frost.
Plant Water Budget
Water stress score is 6/10 — consider drought-tolerant varieties and mulching
Monthly Watering Guide for Shiso
Shiso needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Shiso Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.4" | 0" | ❄️ Dormant |
| Feb | — | 1.6" | 0" | ❄️ Dormant |
| Mar | — | 2.6" | 0" | ❄️ Dormant |
| Apr | 4.3" | 3.1" | 1.2" | 💧 Light watering |
| May | 4.3" | 4" | 0.3" | 💧 Light watering |
| Jun | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| Jul | 4.3" | 3.9" | 0.4" | 💧 Light watering |
| Aug | 4.3" | 3.2" | 1.1" | 💧 Light watering |
| Sep | 4.3" | 3.3" | 1" | 💧 Light watering |
| Oct | 4.3" | 2.6" | 1.7" | 💧 Light watering |
| Nov | — | 2.7" | 0" | ❄️ Dormant |
| Dec | — | 2" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Sullivan County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Shiso Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Shiso Planting Timeline — Sullivan County, MO
Shiso Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | February 27 | Feb 27 – Mar 13 |
| Transplant Outdoors | May 1 | May 1 – May 15 |
| Direct Sow | April 24 | Apr 24 – May 15 |
| Harvest | June 26 | Jun 26 – Aug 21 |
Plant 0.5" deep · 8" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | Start Indoors |
| March | Start Indoors |
| April | Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Harvest |
| August | Harvest |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · Only during dry spells
📅 Days to Maturity
50–70 days
🧪 Soil pH
Needs 5.5–7 · Your soil: ideal
🗺️ USDA Zone
Zone 6a
📆 Growing Season
183 days in Sullivan County
Growing Tips for Shiso in Sullivan County
Direct sow Shiso outdoors after April 17 in Sullivan County when soil has warmed and frost danger has passed.
General growing tips
Direct sow after last frost or start indoors. Both green and red varieties are available. Pinch tips to encourage bushiness. Self-sows prolifically; deadhead to control.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Shiso in Other Locations
Frequently Asked Questions
When should I plant Shiso in Sullivan County, MO?
Sullivan County is in Zone 6a with an average last frost of April 17. Plan your Shiso planting based on this frost date — see the calendar above for exact timing.
What planting zone is Sullivan County, MO?
Sullivan County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 17 and first fall frost is October 17.
Your Sullivan County Garden Planner — Free
A 24-page printable planner built for Sullivan County (Zone 6a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.