Blog

When to plant Celery in Oregon County, MO

Spring Celery in Oregon County goes in March 18–April 8, once nighttime temps stop dipping near freezing. A second sowing from August 18 to September 1 extends the harvest into fall.

When to Plant Celery in Oregon County, MO

Celery

Celery is a marshland plant that requires consistent moisture and cool temperatures to produce crisp, flavorful stalks. It is a rewarding but demanding garden crop.

Oregon County, Missouri is in USDA Zone 7a. The average last spring frost is April 1 and the first fall frost is October 27, giving you a growing season of approximately 209 days.

At an elevation of 1,372 feet, Oregon County receives approximately 30.7 inches of rainfall annually with predominantly silt loam soil. Summer highs average 90°F, providing good warmth for Celery during the growing season.

Oregon County, MO (Zone 7a) Long season
209 days
Last Spring Frost April 1
209 growing days
First Fall Frost October 27

Oregon County Soil Profile

Soil Type

Silt Loam

Soil pH

5.4-6.7

Drainage

Well Drained

Monthly Watering Guide for Celery

Celery needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Celery Needs Rainfall You Supplement Action
Jan 1.3" 0" ❄️ Dormant
Feb 1.2" 0" ❄️ Dormant
Mar 2.2" 0" ❄️ Dormant
Apr 4.3" 2.8" 1.5" 💧 Light watering
May 4.3" 4.2" 0.1" 💧 Light watering
Jun 4.3" 3.8" 0.5" 💧 Light watering
Jul 4.3" 3.2" 1.1" 💧 Light watering
Aug 4.3" 3.1" 1.2" 💧 Light watering
Sep 4.3" 2.9" 1.4" 💧 Light watering
Oct 4.3" 2.3" 2" 💧 Light watering
Nov 2.1" 0" ❄️ Dormant
Dec 1.6" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Oregon County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Celery Planting Timeline — Oregon County, MO

Celery Planting Calendar

Activity When Date Range
Start Indoors February 25 Feb 25 – Mar 11
Transplant Outdoors April 1 Apr 1 – Apr 15
Direct Sow March 18 Mar 18 – Apr 8
Harvest June 24 Jun 24 – Aug 19
Fall Sowing August 18 Aug 18 – Sep 1

Plant 1" deep · 15" apart · Rows 24" apart

Month-by-Month Timeline

MonthActivities
January
February Start Indoors
March Start Indoors Direct Sow
April Transplant Outdoors Direct Sow
May
June Harvest
July Harvest
August Fall Sowing Harvest
September Fall Sowing
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

High — keep soil consistently moist

📅 Days to Maturity

80–120 days

🧪 Soil pH

Needs 6–7 · Your soil: N/A

🗺️ USDA Zone

Zone 7a

📆 Growing Season

209 days in Oregon County

Growing Tips for Oregon County

Start seeds indoors 10-12 weeks before last frost. Keep soil consistently moist and never let it dry out. Blanch stalks by mounding soil or using collars for milder flavor.

Companion Planting

Good Companions

Avoid Planting Near

  • Carrots
  • Parsnip

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Celery in Oregon County, MO?

Oregon County is in Zone 7a with an average last frost of April 1. Plan your Celery planting based on this frost date — see the calendar above for exact timing.

What planting zone is Oregon County, MO?

Oregon County, Missouri is in USDA Hardiness Zone 7a. The average last spring frost is April 1 and first fall frost is October 27.

When should I plant Celery in Oregon County, MO?

In Oregon County, MO, plant Celery after the last frost (around April 1) and before the first frost (around October 27). Best results when soil holds above 50°F.

What growing zone is Oregon County, MO for Celery?

Oregon County sits in USDA Zone 7a. Celery grows reliably in zones 2a through 10b, so it's a good fit here.

Can Celery grow in Oregon County's climate?

Yes — Celery grows well in Oregon County's temperate climate. Oregon County averages a 209-day frost-free season, with last frost around April 1 and first frost around October 27.

🌱

Your Oregon County Garden Planner — Free

A 22-page printable planner built for Oregon County (Zone 7a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Oregon County, MO. Local conditions may vary. Last updated: July 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.