Blog

When to plant Bachelor's Button in Monroe County, MO

Monroe County gardeners should plant Bachelor's Button between March 17 and April 7 in spring. With Monroe County's Zone 6a climate (last frost April 14), Bachelor's Button needs 60–90 days to mature — plant by July 23 for a full harvest. A second sowing from September 9 to September 23 extends the harvest into fall.

When to Plant Bachelor's Button in Monroe County, MO

Bachelor's Button (Centaurea cyanus), also called cornflower, is a carefree cool-season annual best known for its vivid cobalt-blue flowers — one of the truest blues in the annual garden. It tolerates light frosts, self-seeds prolifically, and thrives in poor to average soils. A traditional cut flower and pollinator magnet, it has been cultivated in gardens for centuries.

Monroe County, Missouri is in USDA Zone 6a. The average last spring frost is April 14 and the first fall frost is October 21, giving you a growing season of approximately 190 days.

At an elevation of 1,128 feet, Monroe County receives approximately 35.1 inches of rainfall annually with predominantly silt loam soil. Summer highs average 83°F, so choose short-season varieties of Bachelor's Button to ensure they mature before fall.

Annual Blooms in Spring Pollinator-friendly Deer-resistant Good for cutting
Monroe County, MO (Zone 6a) Moderate season
190 days
Last Spring Frost April 14
190 growing days
First Fall Frost October 21

Monroe County Soil Profile

Soil Type

Silt Loam

Soil pH

6.0-7.0

Drainage

Well Drained

Bachelor's Button Planting Timeline — Monroe County, MO

Bachelor's Button Planting Calendar

Activity When Date Range
Start Indoors March 3 Mar 3 – Mar 17
Transplant Outdoors April 14 Apr 14 – Apr 28
Direct Sow March 17 Mar 17 – Apr 7
Bloom June 16 Jun 16 – Sep 1
Fall Sowing September 9 Sep 9 – Sep 23

Plant 0.3" deep · 12" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March Start Indoors Direct Sow
April Transplant Outdoors Direct Sow
May
June Bloom
July Bloom
August Bloom
September Fall Sowing Bloom
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

Low — drought tolerant

📅 Days to Maturity

60–90 days

🧪 Soil pH

Needs 6–7.5 · Your soil: N/A

🗺️ USDA Zone

Zone 6a

📆 Growing Season

190 days in Monroe County

Growing Tips for Monroe County

Direct-sow in early spring as soon as soil can be worked; seeds need a brief cold period for best germination (refrigerate for a few days before planting if spring arrives quickly). In zones 6+, fall-sow for the earliest spring bloom. Thin to 12 inches; do not over-fertilize — too much nitrogen produces foliage at the expense of flowers. Deadhead to prolong blooming or allow self-seeding for a naturalized colony.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Bachelor's Button in Monroe County, MO?

Monroe County is in Zone 6a with an average last frost of April 14. Plan your Bachelor's Button planting based on this frost date — see the calendar above for exact timing.

What planting zone is Monroe County, MO?

Monroe County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 14 and first fall frost is October 21.

When should I plant Bachelor's Button in Monroe County, MO?

In Monroe County, MO, plant Bachelor's Button after the last frost (around April 14) and before the first frost (around October 21). Best results when soil holds above 50°F.

What growing zone is Monroe County, MO for Bachelor's Button?

Monroe County sits in USDA Zone 6a. Bachelor's Button grows reliably in zones 2a through 11b, so it's a good fit here.

Can Bachelor's Button grow in Monroe County's climate?

Yes — Bachelor's Button grows well in Monroe County's temperate climate. Monroe County averages a 190-day frost-free season, with last frost around April 14 and first frost around October 21.

🌱

Your Monroe County Garden Planner — Free

A 22-page printable planner built for Monroe County (Zone 6a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Monroe County, MO. Local conditions may vary. Last updated: August 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.