When to Plant Crookneck Squash in Miller County, MO
Your May gardening checklist
May is a pivotal month for Miller County, Missouri gardens. Focus on these tasks first and you'll set up the rest of the season for success.
-
Start crookneck squash under lights
These need a head start before your last frost (April 6). Sow into cells now so you're ready to transplant in a few weeks.
To set up a strong June, finish these tasks
- First harvests: crookneck squash
Yellow crookneck squash is a summer squash with a curved neck and bumpy, bright yellow skin. It has a buttery flavor and is best harvested young when 4-6 inches long.
Miller County, Missouri is in USDA Zone 6b. The average last spring frost is April 6 and the first fall frost is October 27, giving you a growing season of approximately 204 days.
At an elevation of 1,086 feet, Miller County receives approximately 30.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89°F, providing good warmth for Crookneck Squash during the growing season.
Miller County Soil Profile
Soil Type
Silt Loam
Soil pH
5.7-6.7
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Miller County
How your county's soil matches Crookneck Squash's growing requirements.
Soil pH
Your soil pH (5.7–6.7) overlaps with Crookneck Squash's range (6.0–7.5), though not a perfect match.
Soil Texture
The silt loam soil in Miller County is excellent for Crookneck Squash — good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Crookneck Squash.
Organic Matter
Organic matter is moderate (2.4%). Annual compost additions will help Crookneck Squash.
How to Plant Crookneck Squash
Succession Planting Crookneck Squash
Sow every 5.1 weeks. Last sowing by Aug 28 to harvest before frost.
Plant Water Budget
Monthly Watering Guide for Crookneck Squash
Crookneck Squash needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Crookneck Squash Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.4" | 0" | ❄️ Dormant |
| Feb | — | 1.2" | 0" | ❄️ Dormant |
| Mar | — | 1.9" | 0" | ❄️ Dormant |
| Apr | 4.3" | 3.4" | 0.9" | 💧 Light watering |
| May | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| Jun | 4.3" | 3.6" | 0.7" | 💧 Light watering |
| Jul | 4.3" | 3.1" | 1.2" | 💧 Light watering |
| Aug | 4.3" | 3.1" | 1.2" | 💧 Light watering |
| Sep | 4.3" | 3.1" | 1.2" | 💧 Light watering |
| Oct | 4.3" | 2.4" | 1.9" | 💧 Light watering |
| Nov | — | 1.8" | 0" | ❄️ Dormant |
| Dec | — | 1.6" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Miller County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Crookneck Squash Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Crookneck Squash Planting Timeline — Miller County, MO
Crookneck Squash Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | March 2 | Mar 2 – Mar 16 |
| Transplant Outdoors | April 20 | Apr 20 – May 4 |
| Direct Sow | April 13 | Apr 13 – May 4 |
| Harvest | June 8 | Jun 8 – Jul 6 |
Plant 1" deep · 30" apart · Rows 42" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | Start Indoors |
| April | Transplant Outdoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Harvest |
| August | — |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
1"/week · Only during dry spells
📅 Days to Maturity
45–60 days
🧪 Soil pH
Needs 6–7.5 · Your soil: acceptable
🗺️ USDA Zone
Zone 6b
📆 Growing Season
204 days in Miller County
Growing Tips for Crookneck Squash in Miller County
Direct sow Crookneck Squash outdoors after April 06 in Miller County when soil has warmed and frost danger has passed.
Your generous 204.0-day season in Miller County allows multiple plantings of Crookneck Squash. Sow every 22.0 days for continuous harvest.
Common pests for Crookneck Squash in this region include squash vine borer and cucumber beetles. Use row covers early in the season and inspect plants weekly.
General growing tips
Direct sow after last frost on mounds. Pick frequently while small for tender texture. Skin becomes tough and warty on larger fruits. Very productive in warm weather.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Crookneck Squash in Other Locations
Frequently Asked Questions
When should I plant Crookneck Squash in Miller County, MO?
Miller County is in Zone 6b with an average last frost of April 6. Plan your Crookneck Squash planting based on this frost date — see the calendar above for exact timing.
What planting zone is Miller County, MO?
Miller County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 6 and first fall frost is October 27.
Your Miller County Garden Planner — Free
A 24-page printable planner built for Miller County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.