Blog

When to Plant Amaranth in Miller County, MO

Miller County, Missouri Zone 6b May

May in Miller County, Missouri — your action list

Each item below is timed to Miller County, Missouri's frost dates and soil temperatures. Skip nothing, stress about nothing.

Avg. last frost April 6
Avg. first frost October 27
Soil temp (4") 65°F
Watering Low
Pest pressure Low
Daylight 14.1 hrs
Before June arrives, get these ready
  • Starting indoors: amaranth

Instant PDF download. No spam, unsubscribe any time.

Amaranth is an ancient grain crop with edible leaves and seeds, rich in protein and micronutrients. It thrives in warm conditions and is drought-tolerant once established.

Miller County, Missouri is in USDA Zone 6b. The average last spring frost is April 6 and the first fall frost is October 27, giving you a growing season of approximately 204 days.

At an elevation of 1,086 feet, Miller County receives approximately 30.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89°F, providing good warmth for Amaranth during the growing season.

Miller County, MO (Zone 6b) Long season
204 days
Last Spring Frost April 6
204 growing days
First Fall Frost October 27

Miller County Soil Profile

Soil Type

Silt Loam

Soil pH

5.7-6.7

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season (49 days to spare)
Start indoors: Feb 3 Transplant: Apr 14 🍅 Harvest: Jul 14 – Sep 1
Recommended (50%) ✓ Fits season (50 days to spare)
Start indoors: Feb 9 Transplant: Apr 20 🍅 Harvest: Jul 20 – Sep 7
Safe Start (90%) ✓ Fits season (50 days to spare)
Start indoors: Feb 24 Transplant: May 5 🍅 Harvest: Aug 4 – Sep 22

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Miller County

How your county's soil matches Amaranth's growing requirements.

Soil pH

Your soil pH (5.7–6.7) overlaps with Amaranth's range (6.0–7.5), though not a perfect match.

Soil Texture

The silt loam soil in Miller County is excellent for Amaranth — good drainage, moisture retention, and nutrient holding capacity.

Drainage

Drainage is adequate for Amaranth.

Organic Matter

Organic matter is moderate (2.4%). Annual compost additions will help Amaranth.

How to Plant Amaranth

1"
Planting Depth
15"
Between Plants
24"
Between Rows

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.6″/week
You supply
0.1″/week
Watering frequency Only during dry spells
Season total 120 gal / 100 sq ft

Monthly Watering Guide for Amaranth

Amaranth needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Amaranth Needs Rainfall You Supplement Action
Jan 1.4" 0" ❄️ Dormant
Feb 1.2" 0" ❄️ Dormant
Mar 1.9" 0" ❄️ Dormant
Apr 4.3" 3.4" 0.9" 💧 Light watering
May 4.3" 4.2" 0.1" 💧 Light watering
Jun 4.3" 3.6" 0.7" 💧 Light watering
Jul 4.3" 3.1" 1.2" 💧 Light watering
Aug 4.3" 3.1" 1.2" 💧 Light watering
Sep 4.3" 3.1" 1.2" 💧 Light watering
Oct 4.3" 2.4" 1.9" 💧 Light watering
Nov 1.8" 0" ❄️ Dormant
Dec 1.6" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Miller County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Amaranth Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Amaranth needs ~1,759 GDD — county provides 3,417 GDD Excellent fit

Amaranth Planting Timeline — Miller County, MO

Amaranth Planting Calendar

Activity When Date Range
Start Indoors February 9 Feb 9 – Feb 23
Transplant Outdoors April 20 Apr 20 – May 4
Direct Sow April 13 Apr 13 – May 4
Harvest July 20 Jul 20 – Sep 7

Plant 1" deep · 15" apart · Rows 24" apart

Month-by-Month Timeline

MonthActivities
January
February Start Indoors
March
April Transplant Outdoors Direct Sow
May Transplant Outdoors Direct Sow
June
July Harvest
August Harvest
September Harvest
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

1"/week · Only during dry spells

📅 Days to Maturity

90–120 days

🧪 Soil pH

Needs 6–7.5 · Your soil: acceptable

🗺️ USDA Zone

Zone 6b

📆 Growing Season

204 days in Miller County

Growing Tips for Amaranth in Miller County

Direct sow Amaranth outdoors after April 06 in Miller County when soil has warmed and frost danger has passed.

General growing tips

Direct sow after last frost when soil is warm. Thin seedlings to 18 inches apart. Harvest leaves when young and tender; harvest seeds when flower heads begin to dry.

Companion Planting

Good Companions

Avoid Planting Near

  • Fennel

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Amaranth in Miller County, MO?

Miller County is in Zone 6b with an average last frost of April 6. Plan your Amaranth planting based on this frost date — see the calendar above for exact timing.

What planting zone is Miller County, MO?

Miller County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 6 and first fall frost is October 27.

🌱

Your Miller County Garden Planner — Free

A 24-page printable planner built for Miller County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Miller County, MO. Local conditions may vary. Last updated: May 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.