When to Plant Che Fruit in Lewis County, MO
Lewis County, Missouri gardeners: here's your May plan
We've pulled the most time-sensitive tasks for Lewis County, Missouri this May and put them front and centre. Tackle them in order.
-
Get che fruit in the ground
Harden off for 7 days — a little more sun each day — before planting. That's the difference between a seedling that thrives and one that stalls.
Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.
Lewis County, Missouri is in USDA Zone 6a. The average last spring frost is April 15 and the first fall frost is October 17, giving you a growing season of approximately 185 days.
At an elevation of 945 feet, Lewis County receives approximately 31.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86°F, providing good warmth for Che Fruit during the growing season.
Lewis County Soil Profile
Soil Type
Silt Loam
Soil pH
5.3-6.8
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Lewis County
How your county's soil matches Che Fruit's growing requirements.
Soil pH
Your soil pH (5.3–6.8) overlaps with Che Fruit's range (6.0–7.5), though not a perfect match.
Soil Texture
The silt loam soil in Lewis County is excellent for Che Fruit — good drainage, moisture retention, and nutrient holding capacity.
Drainage
Drainage is adequate for Che Fruit.
Organic Matter
Organic matter is moderate (2.6%). Annual compost additions will help Che Fruit.
How to Plant Che Fruit
Plant Water Budget
Monthly Watering Guide for Che Fruit
Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Che Fruit Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.1" | 0" | ❄️ Dormant |
| Feb | — | 1.5" | 0" | ❄️ Dormant |
| Mar | — | 2.4" | 0" | ❄️ Dormant |
| Apr | 4.3" | 3.3" | 1" | 💧 Light watering |
| May | 4.3" | 4.1" | 0.2" | 💧 Light watering |
| Jun | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| Jul | 4.3" | 3.1" | 1.2" | 💧 Light watering |
| Aug | 4.3" | 3.5" | 0.8" | 💧 Light watering |
| Sep | 4.3" | 2.9" | 1.4" | 💧 Light watering |
| Oct | 4.3" | 2.2" | 2.1" | 💧 Light watering |
| Nov | — | 2.1" | 0" | ❄️ Dormant |
| Dec | — | 1.5" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Lewis County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Che Fruit Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Che Fruit Planting Timeline — Lewis County, MO
Che Fruit Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | May 6 | May 6 – May 20 |
· 120" apart · Rows 144" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | — |
| May | Transplant Outdoors |
| June | — |
| July | — |
| August | — |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
1"/week · Natural rainfall sufficient
📅 Days to Maturity
1095–1825 days
🧪 Soil pH
Needs 6–7.5 · Your soil: acceptable
🗺️ USDA Zone
Zone 6a
📆 Growing Season
185 days in Lewis County
Growing Tips for Che Fruit in Lewis County
Direct sow Che Fruit outdoors after April 15 in Lewis County when soil has warmed and frost danger has passed.
Your 185.0-day growing season in Lewis County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.
General growing tips
Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Che Fruit in Other Locations
Frequently Asked Questions
When should I plant Che Fruit in Lewis County, MO?
Lewis County is in Zone 6a with an average last frost of April 15. Plan your Che Fruit planting based on this frost date — see the calendar above for exact timing.
What planting zone is Lewis County, MO?
Lewis County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 15 and first fall frost is October 17.
Your Lewis County Garden Planner — Free
A 24-page printable planner built for Lewis County (Zone 6a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.