Blog

When to plant Kabocha in Jasper County, MO

Spring Kabocha in Jasper County goes in April 16–May 7, once nighttime temps stop dipping near freezing.

When to Plant Kabocha in Jasper County, MO

Kabocha is a Japanese winter squash with an exceptionally sweet, dense, chestnut-like flesh and dark green skin. It is a favorite in Asian cuisine for its rich, dry texture.

Jasper County, Missouri is in USDA Zone 7a. The average last spring frost is April 9 and the first fall frost is October 26, giving you a growing season of approximately 200 days.

At an elevation of 1,156 feet, Jasper County receives approximately 30.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86°F, providing good warmth for Kabocha during the growing season.

Jasper County, MO (Zone 7a) Long season
200 days
Last Spring Frost April 9
200 growing days
First Fall Frost October 26

Jasper County Soil Profile

Soil Type

Silt Loam

Soil pH

5.5-6.6

Drainage

Well Drained

Monthly Watering Guide for Kabocha

Kabocha needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Kabocha Needs Rainfall You Supplement Action
Jan 1.3" 0" ❄️ Dormant
Feb 1.3" 0" ❄️ Dormant
Mar 1.8" 0" ❄️ Dormant
Apr 4.3" 2.9" 1.4" 💧 Light watering
May 4.3" 3.5" 0.8" 💧 Light watering
Jun 4.3" 4.3" 0" ✅ Rainfall sufficient
Jul 4.3" 3.1" 1.2" 💧 Light watering
Aug 4.3" 3.6" 0.7" 💧 Light watering
Sep 4.3" 2.5" 1.8" 💧 Light watering
Oct 4.3" 2.4" 1.9" 💧 Light watering
Nov 2.2" 0" ❄️ Dormant
Dec 1.9" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Jasper County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Kabocha Planting Timeline — Jasper County, MO

Kabocha Planting Calendar

Activity When Date Range
Start Indoors March 12 Mar 12 – Mar 26
Transplant Outdoors April 23 Apr 23 – May 7
Direct Sow April 16 Apr 16 – May 7
Harvest July 23 Jul 23 – Aug 20

Plant 1" deep · 30" apart · Rows 42" apart

Month-by-Month Timeline

MonthActivities
January
February
March Start Indoors
April Transplant Outdoors Direct Sow
May Transplant Outdoors Direct Sow
June
July Harvest
August Harvest
September
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

85–100 days

🧪 Soil pH

Needs 6–7.5 · Your soil: N/A

🗺️ USDA Zone

Zone 7a

📆 Growing Season

200 days in Jasper County

Growing Tips for Jasper County

Direct sow after frost or start indoors. Harvest when the skin is hard and dull. The stem should be dry and corky. Stores well for 3-4 months in a cool, dry place.

Companion Planting

Good Companions

Avoid Planting Near

  • Potatoes

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Kabocha in Jasper County, MO?

Jasper County is in Zone 7a with an average last frost of April 9. Plan your Kabocha planting based on this frost date — see the calendar above for exact timing.

What planting zone is Jasper County, MO?

Jasper County, Missouri is in USDA Hardiness Zone 7a. The average last spring frost is April 9 and first fall frost is October 26.

When should I plant Kabocha in Jasper County, MO?

In Jasper County, MO, plant Kabocha after the last frost (around April 9) and before the first frost (around October 26). Best results when soil holds above 50°F.

What growing zone is Jasper County, MO for Kabocha?

Jasper County sits in USDA Zone 7a. Kabocha grows reliably in zones 3a through 11b, so it's a good fit here.

Can Kabocha grow in Jasper County's climate?

Yes — Kabocha grows well in Jasper County's temperate climate. Jasper County averages a 200-day frost-free season, with last frost around April 9 and first frost around October 26.

🌱

Your Jasper County Garden Planner — Free

A 22-page printable planner built for Jasper County (Zone 7a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Jasper County, MO. Local conditions may vary. Last updated: August 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.