Blog

When to plant Chives in Dunklin County, MO

Dunklin County's short 220-day growing season means one Chives planting between April 3 and April 17. No fall crop in Zone 7b.

When to Plant Chives in Dunklin County, MO

Chives

Chives are a hardy perennial herb with a mild onion flavor and attractive purple pom-pom flowers. They are one of the easiest herbs to grow and maintain.

Dunklin County, Missouri is in USDA Zone 7b. The average last spring frost is March 27 and the first fall frost is November 2, giving you a growing season of approximately 220 days.

At an elevation of 1,344 feet, Dunklin County receives approximately 33.5 inches of rainfall annually with predominantly silt loam soil. Summer highs average 94°F, providing good warmth for Chives during the growing season.

Dunklin County, MO (Zone 7b) Long season
220 days
Last Spring Frost March 27
220 growing days
First Fall Frost November 2

Dunklin County Soil Profile

Soil Type

Silt Loam

Soil pH

5.6-7.1

Drainage

Well Drained

Monthly Watering Guide for Chives

Chives needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Chives Needs Rainfall You Supplement Action
Jan 1.4" 0" ❄️ Dormant
Feb 1.4" 0" ❄️ Dormant
Mar 4.3" 2.4" 1.9" 💧 Light watering
Apr 4.3" 2.8" 1.5" 💧 Light watering
May 4.3" 4.1" 0.2" 💧 Light watering
Jun 4.3" 4.3" 0" ✅ Rainfall sufficient
Jul 4.3" 3.7" 0.6" 💧 Light watering
Aug 4.3" 3.5" 0.8" 💧 Light watering
Sep 4.3" 3.2" 1.1" 💧 Light watering
Oct 4.3" 2.8" 1.5" 💧 Light watering
Nov 4.3" 2.4" 1.9" 💧 Light watering
Dec 1.5" 0" ❄️ Dormant

Water needs are for active growing months only (Mar–Nov in Dunklin County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Chives Planting Timeline — Dunklin County, MO

Chives Planting Calendar

Activity When Date Range
Transplant Outdoors April 3 Apr 3 – Apr 17
Harvest June 5 Jun 5 – Aug 14

Plant 0.5" deep · 8" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April Transplant Outdoors
May
June Harvest
July Harvest
August Harvest
September
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

60–90 days

🧪 Soil pH

Needs 6–7 · Your soil: N/A

🗺️ USDA Zone

Zone 7b

📆 Growing Season

220 days in Dunklin County

Growing Tips for Dunklin County

Start from seed or divisions in spring. Cut back to 2 inches after flowering to encourage fresh growth. Both the leaves and flowers are edible and delicious.

Companion Planting

Good Companions

Avoid Planting Near

  • Peas
  • Green Beans

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Chives in Dunklin County, MO?

Dunklin County is in Zone 7b with an average last frost of March 27. Plan your Chives planting based on this frost date — see the calendar above for exact timing.

What planting zone is Dunklin County, MO?

Dunklin County, Missouri is in USDA Hardiness Zone 7b. The average last spring frost is March 27 and first fall frost is November 2.

When should I plant Chives in Dunklin County, MO?

In Dunklin County, MO, plant Chives after the last frost (around March 27) and before the first frost (around November 2). Best results when soil holds above 50°F.

What growing zone is Dunklin County, MO for Chives?

Dunklin County sits in USDA Zone 7b. Chives grows reliably in zones 3a through 10b, so it's a good fit here.

Can Chives grow in Dunklin County's climate?

Yes — Chives grows well in Dunklin County's temperate climate. Dunklin County averages a 220-day frost-free season, with last frost around March 27 and first frost around November 2.

🌱

Your Dunklin County Garden Planner — Free

A 22-page printable planner built for Dunklin County (Zone 7b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Dunklin County, MO. Local conditions may vary. Last updated: July 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.