Blog

When to plant Onion in Dade County, MO

In Zone 7a (Dade County), direct-sow Onion between March 25 and April 15 for spring, after the April 8 last-frost mark. A second sowing from August 17 to August 31 extends the harvest into fall.

When to Plant Onion in Dade County, MO

Onions are a fundamental kitchen staple available in yellow, white, and red varieties. Choose long-day, short-day, or intermediate types based on your latitude.

Dade County, Missouri is in USDA Zone 7a. The average last spring frost is April 8 and the first fall frost is October 26, giving you a growing season of approximately 201 days.

At an elevation of 660 feet, Dade County receives approximately 37.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 85°F, providing good warmth for Onion during the growing season.

Dade County, MO (Zone 7a) Long season
201 days
Last Spring Frost April 8
201 growing days
First Fall Frost October 26

Dade County Soil Profile

Soil Type

Silt Loam

Soil pH

5.6-6.8

Drainage

Well Drained

Monthly Watering Guide for Onion

Onion needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Onion Needs Rainfall You Supplement Action
Jan 1.7" 0" ❄️ Dormant
Feb 1.7" 0" ❄️ Dormant
Mar 2.4" 0" ❄️ Dormant
Apr 4.3" 3.5" 0.8" 💧 Light watering
May 4.3" 4.9" 0" ✅ Rainfall sufficient
Jun 4.3" 4.3" 0" ✅ Rainfall sufficient
Jul 4.3" 3.7" 0.6" 💧 Light watering
Aug 4.3" 4.4" 0" ✅ Rainfall sufficient
Sep 4.3" 3.4" 0.9" 💧 Light watering
Oct 4.3" 3.1" 1.2" 💧 Light watering
Nov 2.6" 0" ❄️ Dormant
Dec 2.2" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Dade County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Onion Planting Timeline — Dade County, MO

Onion Planting Calendar

Activity When Date Range
Start Indoors March 4 Mar 4 – Mar 18
Transplant Outdoors April 8 Apr 8 – Apr 22
Direct Sow March 25 Mar 25 – Apr 15
Harvest July 8 Jul 8 – Aug 26
Fall Sowing August 17 Aug 17 – Aug 31

Plant 1" deep · 6" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March Start Indoors Direct Sow
April Transplant Outdoors Direct Sow
May
June
July Harvest
August Fall Sowing Harvest
September
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

90–120 days

🧪 Soil pH

Needs 6–7 · Your soil: N/A

🗺️ USDA Zone

Zone 7a

📆 Growing Season

201 days in Dade County

Growing Tips for Dade County

Start seeds indoors 8-10 weeks before transplanting. Match day-length type to your latitude. Stop watering when tops begin to fall over and cure bulbs for 2-3 weeks before storage.

Companion Planting

Good Companions

Avoid Planting Near

  • Peas
  • Green Beans
  • Asparagus

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Onion in Dade County, MO?

Dade County is in Zone 7a with an average last frost of April 8. Plan your Onion planting based on this frost date — see the calendar above for exact timing.

What planting zone is Dade County, MO?

Dade County, Missouri is in USDA Hardiness Zone 7a. The average last spring frost is April 8 and first fall frost is October 26.

When should I plant Onion in Dade County, MO?

In Dade County, MO, plant Onion after the last frost (around April 8) and before the first frost (around October 26). Best results when soil holds above 50°F.

What growing zone is Dade County, MO for Onion?

Dade County sits in USDA Zone 7a. Onion grows reliably in zones 3a through 10b, so it's a good fit here.

Can Onion grow in Dade County's climate?

Yes — Onion grows well in Dade County's temperate climate. Dade County averages a 201-day frost-free season, with last frost around April 8 and first frost around October 26.

🌱

Your Dade County Garden Planner — Free

A 22-page printable planner built for Dade County (Zone 7a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Dade County, MO. Local conditions may vary. Last updated: July 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.