Blog

When to Plant Jostaberry in Clay County, MO

Jostaberry is a thornless hybrid of black currant and gooseberry, producing medium-sized, dark berries with a complex, tart-sweet flavor. It is vigorous and disease-resistant.

Clay County, Missouri is in USDA Zone 6a. The average last spring frost is April 13 and the first fall frost is October 24, giving you a growing season of approximately 194 days.

At an elevation of 1,373 feet, Clay County receives approximately 33.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 88ยฐF, providing good warmth for Jostaberry during the growing season.

Clay County, MO (Zone 6a) Moderate season
194 days
Last Spring Frost April 13
194 growing days
First Fall Frost October 24

Clay County Soil Profile

Soil Type

Silt Loam

Soil pH

5.3-6.8

Drainage

Well Drained

Plant Planting Risk Windows

Early Start (70% safe) ✓ Fits season
Transplant: Apr 27
Recommended (50%) ✓ Fits season
Transplant: May 4
Safe Start (90%) ✓ Fits season
Transplant: May 19

Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.

Soil Compatibility in Clay County

How your county's soil matches Jostaberry's growing requirements.

Soil pH

Your soil pH (5.3โ€“6.8) overlaps with Jostaberry's range (6.0โ€“6.5), though not a perfect match.

Soil Texture

The silt loam soil in Clay County is excellent for Jostaberry โ€” good drainage, moisture retention, and nutrient holding capacity.

Organic Matter

Organic matter is moderate (2.7%). Annual compost additions will help Jostaberry.

How to Plant Jostaberry

48"
Between Plants
72"
Between Rows

Plant Water Budget

Plant needs
1.0″/week
Rainfall provides
0.7″/week
You supply
0.3″/week
Watering frequency Only during dry spells
Season total 463 gal / 100 sq ft

Monthly Watering Guide for Jostaberry

Jostaberry needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Jostaberry Needs Rainfall You Supplement Action
Jan โ€” 1.4" 0" โ„๏ธ Dormant
Feb โ€” 1.5" 0" โ„๏ธ Dormant
Mar โ€” 2.6" 0" โ„๏ธ Dormant
Apr 4.3" 3" 1.3" ๐Ÿ’ง Light watering
May 4.3" 4.2" 0.1" ๐Ÿ’ง Light watering
Jun 4.3" 3.9" 0.4" ๐Ÿ’ง Light watering
Jul 4.3" 3.6" 0.7" ๐Ÿ’ง Light watering
Aug 4.3" 3.7" 0.6" ๐Ÿ’ง Light watering
Sep 4.3" 3.5" 0.8" ๐Ÿ’ง Light watering
Oct 4.3" 2.5" 1.8" ๐Ÿ’ง Light watering
Nov โ€” 2.2" 0" โ„๏ธ Dormant
Dec โ€” 1.7" 0" โ„๏ธ Dormant

Water needs are for active growing months only (Aprโ€“Oct in Clay County). Supplement amounts are based on average rainfall โ€” actual needs vary with temperature, soil, and mulching.

Jostaberry Heat Requirements (GDD)

What are Growing Degree Days (GDD)?

Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" โ€” every day above 50ยฐF deposits warmth that helps your plants grow.

Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.

Jostaberry needs ~14,600 GDD — county provides 3,104 GDD May not mature

Jostaberry Planting Timeline โ€” Clay County, MO

Jostaberry Planting Calendar

Activity When Date Range
Transplant Outdoors May 4 May 4 โ€“ May 18

ยท 48" apart ยท Rows 72" apart

Month-by-Month Timeline

MonthActivities
January โ€”
February โ€”
March โ€”
April โ€”
May Transplant Outdoors
June โ€”
July โ€”
August โ€”
September โ€”
October โ€”
November โ€”
December โ€”

Growing Conditions

โ˜€๏ธ Sun

Partial Shade (3-6 hours)

๐Ÿ’ง Water

1"/week ยท Only during dry spells

๐Ÿ“… Days to Maturity

730โ€“1095 days

๐Ÿงช Soil pH

Needs 6โ€“6.5 ยท Your soil: acceptable

๐Ÿ—บ๏ธ USDA Zone

Zone 6a

๐Ÿ“† Growing Season

194 days in Clay County

Growing Tips for Jostaberry in Clay County

Direct sow Jostaberry outdoors after April 13 in Clay County when soil has warmed and frost danger has passed.

Your 194.0-day growing season in Clay County is tight for Jostaberry (730.0-1095.0 days to maturity). Start indoors and choose early-maturing varieties.

General growing tips

Plant in rich, well-drained soil. No special pruning required beyond removing old wood. Self-fertile but yields improve with a second bush. Berries ripen midsummer.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Jostaberry in Clay County, MO?

Clay County is in Zone 6a with an average last frost of April 13. Plan your Jostaberry planting based on this frost date โ€” see the calendar above for exact timing.

What planting zone is Clay County, MO?

Clay County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 13 and first fall frost is October 24.

๐ŸŒฑ

Plan Your Garden with Confidence

Get our free Garden Planner โ€” designed to help Clay County gardeners in Zone 6a organize planting dates, track what's growing, and never miss a planting window.

Get Your Free Garden Planner →

Free download. Plan your entire garden season in minutes.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Clay County, MO. Local conditions may vary. Last updated: April 2026.