Blog

When to plant Arugula in Clark County, MO

For Arugula in Clark County, the safe spring window opens around April 2 and closes around April 23. Last expected frost is April 16, first fall frost October 18, giving a 185-day growing season. A second sowing from August 9 to August 23 extends the harvest into fall.

When to Plant Arugula in Clark County, MO

Arugula is a fast-growing cool-season green with a peppery, nutty flavor. It is excellent in salads and can be harvested as baby greens or mature leaves.

Clark County, Missouri is in USDA Zone 6a. The average last spring frost is April 16 and the first fall frost is October 18, giving you a growing season of approximately 185 days.

At an elevation of 833 feet, Clark County receives approximately 33 inches of rainfall annually with predominantly silt loam soil. Summer highs average 87°F, providing good warmth for Arugula during the growing season.

Clark County, MO (Zone 6a) Moderate season
185 days
Last Spring Frost April 16
185 growing days
First Fall Frost October 18

Clark County Soil Profile

Soil Type

Silt Loam

Soil pH

5.6-6.6

Drainage

Well Drained

Monthly Watering Guide for Arugula

Arugula needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Arugula Needs Rainfall You Supplement Action
Jan 1.4" 0" ❄️ Dormant
Feb 1.4" 0" ❄️ Dormant
Mar 1.9" 0" ❄️ Dormant
Apr 4.3" 3.3" 1" 💧 Light watering
May 4.3" 4.1" 0.2" 💧 Light watering
Jun 4.3" 3.7" 0.6" 💧 Light watering
Jul 4.3" 3.3" 1" 💧 Light watering
Aug 4.3" 3.7" 0.6" 💧 Light watering
Sep 4.3" 3.2" 1.1" 💧 Light watering
Oct 4.3" 2.6" 1.7" 💧 Light watering
Nov 2.5" 0" ❄️ Dormant
Dec 1.8" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Clark County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Arugula Planting Timeline — Clark County, MO

Arugula Planting Calendar

Activity When Date Range
Start Indoors March 12 Mar 12 – Mar 26
Transplant Outdoors April 16 Apr 16 – Apr 30
Direct Sow April 2 Apr 2 – Apr 23
Harvest May 21 May 21 – Jul 23
Fall Sowing August 9 Aug 9 – Aug 23

Plant 0.5" deep · 6" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March Start Indoors
April Transplant Outdoors Direct Sow
May Harvest
June Harvest
July Harvest
August Fall Sowing
September
October
November
December

Growing Conditions

☀️ Sun

Partial Shade (3-6 hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

30–50 days

🧪 Soil pH

Needs 6–7 · Your soil: N/A

🗺️ USDA Zone

Zone 6a

📆 Growing Season

185 days in Clark County

Growing Tips for Clark County

Sow seeds directly every 2-3 weeks for continuous harvest. Provide afternoon shade in warm weather to prevent bolting. Harvest outer leaves first to extend production.

Companion Planting

Good Companions

Avoid Planting Near

  • Strawberries

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Arugula in Clark County, MO?

Clark County is in Zone 6a with an average last frost of April 16. Plan your Arugula planting based on this frost date — see the calendar above for exact timing.

What planting zone is Clark County, MO?

Clark County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 16 and first fall frost is October 18.

When should I plant Arugula in Clark County, MO?

In Clark County, MO, plant Arugula after the last frost (around April 16) and before the first frost (around October 18). Best results when soil holds above 50°F.

What growing zone is Clark County, MO for Arugula?

Clark County sits in USDA Zone 6a. Arugula grows reliably in zones 3a through 11b, so it's a good fit here.

Can Arugula grow in Clark County's climate?

Yes — Arugula grows well in Clark County's temperate climate. Clark County averages a 185-day frost-free season, with last frost around April 16 and first frost around October 18.

🌱

Your Clark County Garden Planner — Free

A 22-page printable planner built for Clark County (Zone 6a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Clark County, MO. Local conditions may vary. Last updated: June 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.