Blog

When to plant Yard Long Beans in Cedar County, MO

Cedar County gardeners should plant Yard Long Beans between April 15 and May 6 in spring. With Cedar County's Zone 6b climate (last frost April 8), Yard Long Beans needs 55–80 days to mature — plant by August 7 for a full harvest.

When to Plant Yard Long Beans in Cedar County, MO

Yard long beans are a tropical legume that produces slender pods up to 24 inches long. They are a staple in Southeast Asian cooking and thrive in hot weather.

Cedar County, Missouri is in USDA Zone 6b. The average last spring frost is April 8 and the first fall frost is October 26, giving you a growing season of approximately 201 days.

At an elevation of 1,062 feet, Cedar County receives approximately 32.2 inches of rainfall annually with predominantly silt loam soil. Summer highs average 86°F, providing good warmth for Yard Long Beans during the growing season.

Cedar County, MO (Zone 6b) Long season
201 days
Last Spring Frost April 8
201 growing days
First Fall Frost October 26

Cedar County Soil Profile

Soil Type

Silt Loam

Soil pH

5.2-6.8

Drainage

Well Drained

Monthly Watering Guide for Yard Long Beans

Yard Long Beans needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Yard Long Beans Needs Rainfall You Supplement Action
Jan 1.2" 0" ❄️ Dormant
Feb 1.5" 0" ❄️ Dormant
Mar 2.2" 0" ❄️ Dormant
Apr 4.3" 3.2" 1.1" 💧 Light watering
May 4.3" 3.3" 1" 💧 Light watering
Jun 4.3" 4" 0.3" 💧 Light watering
Jul 4.3" 4" 0.3" 💧 Light watering
Aug 4.3" 3.6" 0.7" 💧 Light watering
Sep 4.3" 3.3" 1" 💧 Light watering
Oct 4.3" 2.5" 1.8" 💧 Light watering
Nov 2" 0" ❄️ Dormant
Dec 1.6" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Cedar County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Yard Long Beans Planting Timeline — Cedar County, MO

Yard Long Beans Planting Calendar

Activity When Date Range
Start Indoors February 11 Feb 11 – Feb 25
Transplant Outdoors April 22 Apr 22 – May 6
Direct Sow April 15 Apr 15 – May 6
Harvest June 17 Jun 17 – Jul 29

Plant 1" deep · 15" apart · Rows 24" apart

Month-by-Month Timeline

MonthActivities
January
February Start Indoors
March
April Transplant Outdoors Direct Sow
May Transplant Outdoors Direct Sow
June Harvest
July Harvest
August
September
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

55–80 days

🧪 Soil pH

Needs 6–7.5 · Your soil: N/A

🗺️ USDA Zone

Zone 6b

📆 Growing Season

201 days in Cedar County

Growing Tips for Cedar County

Direct sow after soil is warm. Provide tall poles or trellising as vines can reach 8-10 feet. Harvest when pods are pencil-thick before seeds bulge. Cook quickly for best texture.

Companion Planting

Good Companions

Avoid Planting Near

  • Onion
  • Garlic

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Yard Long Beans in Cedar County, MO?

Cedar County is in Zone 6b with an average last frost of April 8. Plan your Yard Long Beans planting based on this frost date — see the calendar above for exact timing.

What planting zone is Cedar County, MO?

Cedar County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 8 and first fall frost is October 26.

When should I plant Yard Long Beans in Cedar County, MO?

In Cedar County, MO, plant Yard Long Beans after the last frost (around April 8) and before the first frost (around October 26). Best results when soil holds above 50°F.

What growing zone is Cedar County, MO for Yard Long Beans?

Cedar County sits in USDA Zone 6b. Yard Long Beans grows reliably in zones 5a through 11b, so it's a good fit here.

Can Yard Long Beans grow in Cedar County's climate?

Yes — Yard Long Beans grows well in Cedar County's temperate climate. Cedar County averages a 201-day frost-free season, with last frost around April 8 and first frost around October 26.

🌱

Your Cedar County Garden Planner — Free

A 22-page printable planner built for Cedar County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Cedar County, MO. Local conditions may vary. Last updated: July 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.