Blog

When to plant Comfrey in Callaway County County,

In Callaway County County, Comfrey is a single-season spring crop — there's no second fall window. Plant April 17–May 1 for an 90-day harvest, finishing well before the October 26 first frost.

When to Plant Comfrey in Callaway County, MO

Comfrey is a vigorous perennial herb valued as a dynamic accumulator of nutrients. Its leaves make excellent mulch, compost activator, and liquid fertilizer.

Callaway County, Missouri is in USDA Zone 6b. The average last spring frost is April 10 and the first fall frost is October 26, giving you a growing season of approximately 199 days.

At an elevation of 1,243 feet, Callaway County receives approximately 34.9 inches of rainfall annually with predominantly silt loam soil. Summer highs average 85°F, providing good warmth for Comfrey during the growing season.

Callaway County, MO (Zone 6b) Moderate season
199 days
Last Spring Frost April 10
199 growing days
First Fall Frost October 26
Share this guide:

Callaway County Soil Profile

Soil Type

Silt Loam

Soil pH

5.6-6.6

Drainage

Well Drained

Monthly Watering Guide for Comfrey

Comfrey needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Comfrey Needs Rainfall You Supplement Action
Jan 1.6" 0" ❄️ Dormant
Feb 1.5" 0" ❄️ Dormant
Mar 2.2" 0" ❄️ Dormant
Apr 4.3" 3.5" 0.8" 💧 Light watering
May 4.3" 3.8" 0.5" 💧 Light watering
Jun 4.3" 3.9" 0.4" 💧 Light watering
Jul 4.3" 4.1" 0.2" 💧 Light watering
Aug 4.3" 3.5" 0.8" 💧 Light watering
Sep 4.3" 3.3" 1" 💧 Light watering
Oct 4.3" 2.9" 1.4" 💧 Light watering
Nov 2.6" 0" ❄️ Dormant
Dec 2.1" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Callaway County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Comfrey Planting Timeline — Callaway County, MO

Comfrey Planting Calendar

Activity When Date Range
Transplant Outdoors April 17 Apr 17 – May 1
Harvest June 19 Jun 19 – Aug 28

Plant 0.5" deep · 8" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April Transplant Outdoors
May Transplant Outdoors
June Harvest
July Harvest
August Harvest
September
October
November
December
Share this guide:

Growing Conditions

☀️ Sun

Partial Shade (3-6 hours)

💧 Water

Moderate — regular watering

📅 Days to Maturity

60–90 days

🧪 Soil pH

Needs 6–7 · Your soil: N/A

🗺️ USDA Zone

Zone 6b

📆 Growing Season

199 days in Callaway County

Growing Tips for Callaway County

Plant root cuttings 2 inches deep. Choose Bocking 14 variety to prevent self-seeding. Cut leaves 3-4 times per season for mulch or compost. Avoid planting near pathways as it spreads.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Comfrey in Callaway County, MO?

Callaway County is in Zone 6b with an average last frost of April 10. Plan your Comfrey planting based on this frost date — see the calendar above for exact timing.

What planting zone is Callaway County, MO?

Callaway County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 10 and first fall frost is October 26.

When should I plant Comfrey in Callaway County County, ?

In Callaway County County, , plant Comfrey after the last frost (around April 10) and before the first frost (around October 26). Best results when soil holds above 50°F.

What growing zone is Callaway County County, for Comfrey?

Callaway County County sits in USDA Zone 6b. Comfrey grows reliably in zones 3a through 9b, so it's a good fit here.

Can Comfrey grow in Callaway County County's climate?

Yes — Comfrey grows well in Callaway County County's temperate climate. Callaway County County averages a 199-day frost-free season, with last frost around April 10 and first frost around October 26.

🌱

Your Callaway County Garden Planner — Free

A 22-page printable planner built for Callaway County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Callaway County, MO. Local conditions may vary. Last updated: June 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.