Blog

When to plant Feverfew in Bollinger County, MO

Bollinger County's short 202-day growing season means one Feverfew planting between April 15 and April 29. No fall crop in Zone 6b.

When to Plant Feverfew in Bollinger County, MO

Feverfew is a bushy perennial herb with small daisy-like flowers and aromatic leaves. It has been used traditionally for headache relief and is a cheerful garden plant.

Bollinger County, Missouri is in USDA Zone 6b. The average last spring frost is April 8 and the first fall frost is October 27, giving you a growing season of approximately 202 days.

At an elevation of 1,095 feet, Bollinger County receives approximately 37.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89°F, providing good warmth for Feverfew during the growing season.

Bollinger County, MO (Zone 6b) Long season
202 days
Last Spring Frost April 8
202 growing days
First Fall Frost October 27

Bollinger County Soil Profile

Soil Type

Silt Loam

Soil pH

5.4-7.1

Drainage

Well Drained

Monthly Watering Guide for Feverfew

Feverfew needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Feverfew Needs Rainfall You Supplement Action
Jan 1.5" 0" ❄️ Dormant
Feb 1.8" 0" ❄️ Dormant
Mar 2.9" 0" ❄️ Dormant
Apr 4.3" 4.1" 0.2" 💧 Light watering
May 4.3" 4" 0.3" 💧 Light watering
Jun 4.3" 4.8" 0" ✅ Rainfall sufficient
Jul 4.3" 3.8" 0.5" 💧 Light watering
Aug 4.3" 4.2" 0.1" 💧 Light watering
Sep 4.3" 3" 1.3" 💧 Light watering
Oct 4.3" 3.1" 1.2" 💧 Light watering
Nov 2.4" 0" ❄️ Dormant
Dec 2.2" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Bollinger County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Feverfew Planting Timeline — Bollinger County, MO

Feverfew Planting Calendar

Activity When Date Range
Transplant Outdoors April 15 Apr 15 – Apr 29
Harvest July 15 Jul 15 – Sep 30

Plant 0.5" deep · 8" apart · Rows 12" apart

Month-by-Month Timeline

MonthActivities
January
February
March
April Transplant Outdoors
May
June
July Harvest
August Harvest
September Harvest
October
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

Low — drought tolerant

📅 Days to Maturity

90–120 days

🧪 Soil pH

Needs 6–7 · Your soil: N/A

🗺️ USDA Zone

Zone 6b

📆 Growing Season

202 days in Bollinger County

Growing Tips for Bollinger County

Start seeds indoors or direct sow on the soil surface. Deadhead regularly to prevent aggressive self-seeding. Divide clumps every 2-3 years to maintain vigor.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Feverfew in Bollinger County, MO?

Bollinger County is in Zone 6b with an average last frost of April 8. Plan your Feverfew planting based on this frost date — see the calendar above for exact timing.

What planting zone is Bollinger County, MO?

Bollinger County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 8 and first fall frost is October 27.

When should I plant Feverfew in Bollinger County, MO?

In Bollinger County, MO, plant Feverfew after the last frost (around April 8) and before the first frost (around October 27). Best results when soil holds above 50°F.

What growing zone is Bollinger County, MO for Feverfew?

Bollinger County sits in USDA Zone 6b. Feverfew grows reliably in zones 5a through 9b, so it's a good fit here.

Can Feverfew grow in Bollinger County's climate?

Yes — Feverfew grows well in Bollinger County's temperate climate. Bollinger County averages a 202-day frost-free season, with last frost around April 8 and first frost around October 27.

🌱

Your Bollinger County Garden Planner — Free

A 22-page printable planner built for Bollinger County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Bollinger County, MO. Local conditions may vary. Last updated: July 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.