When to plant Bitter Melon in Bollinger County, MO
For Bitter Melon in Bollinger County, the safe spring window opens around April 15 and closes around May 6. Last expected frost is April 8, first fall frost October 27, giving a 202-day growing season.
When to Plant Bitter Melon in Bollinger County, MO
Bitter melon is a tropical vine producing warty, bitter fruits used in Asian and Indian cuisine. The intense bitterness is prized for its culinary and health properties.
Bollinger County, Missouri is in USDA Zone 6b. The average last spring frost is April 8 and the first fall frost is October 27, giving you a growing season of approximately 202 days.
At an elevation of 1,095 feet, Bollinger County receives approximately 37.8 inches of rainfall annually with predominantly silt loam soil. Summer highs average 89°F, providing good warmth for Bitter Melon during the growing season.
Bollinger County Soil Profile
Soil Type
Silt Loam
Soil pH
6.0-7.0
Drainage
Well Drained
Bitter Melon Planting Timeline — Bollinger County, MO
Bitter Melon Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | February 11 | Feb 11 – Feb 25 |
| Transplant Outdoors | April 22 | Apr 22 – May 6 |
| Direct Sow | April 15 | Apr 15 – May 6 |
| Harvest | June 24 | Jun 24 – Aug 5 |
Plant 1" deep · 30" apart · Rows 42" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | Start Indoors |
| March | — |
| April | Transplant Outdoors Direct Sow |
| May | Transplant Outdoors Direct Sow |
| June | Harvest |
| July | Harvest |
| August | Harvest |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
Moderate — regular watering
📅 Days to Maturity
60–90 days
🧪 Soil pH
Needs 6–7 · Your soil: N/A
🗺️ USDA Zone
Zone 6b
📆 Growing Season
202 days in Bollinger County
Growing Tips for Bollinger County
Start seeds indoors 4 weeks before last frost. Provide a trellis for climbing. Harvest fruits while still green and firm. Reduce bitterness by salting sliced fruit before cooking.
Companion Planting
Good Companions
Avoid Planting Near
Check more plant combinations with our Companion Planting Checker →
Bitter Melon in Other Locations
Frequently Asked Questions
When should I plant Bitter Melon in Bollinger County, MO?
Bollinger County is in Zone 6b with an average last frost of April 8. Plan your Bitter Melon planting based on this frost date — see the calendar above for exact timing.
What planting zone is Bollinger County, MO?
Bollinger County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 8 and first fall frost is October 27.
When should I plant Bitter Melon in Bollinger County, MO?
In Bollinger County, MO, plant Bitter Melon after the last frost (around April 8) and before the first frost (around October 27). Best results when soil holds above 50°F.
What growing zone is Bollinger County, MO for Bitter Melon?
Bollinger County sits in USDA Zone 6b. Bitter Melon grows reliably in zones 5a through 11b, so it's a good fit here.
Can Bitter Melon grow in Bollinger County's climate?
Yes — Bitter Melon grows well in Bollinger County's temperate climate. Bollinger County averages a 202-day frost-free season, with last frost around April 8 and first frost around October 27.
Your Bollinger County Garden Planner — Free
A 22-page printable planner built for Bollinger County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.