Blog

When to plant Celery in Audrain County County,

Audrain County County gardeners should plant Celery between March 27 and April 17 in spring. With Audrain County County's Zone 6b climate (last frost April 10), Celery needs 120 days to mature — plant by June 27 for a full harvest. A second sowing from August 16 to August 30 extends the harvest into fall.

When to Plant Celery in Audrain County, MO

Celery

Celery is a marshland plant that requires consistent moisture and cool temperatures to produce crisp, flavorful stalks. It is a rewarding but demanding garden crop.

Audrain County, Missouri is in USDA Zone 6b. The average last spring frost is April 10 and the first fall frost is October 25, giving you a growing season of approximately 198 days.

At an elevation of 1,376 feet, Audrain County receives approximately 37.2 inches of rainfall annually with predominantly silt loam soil. Summer highs average 85°F, providing good warmth for Celery during the growing season.

Audrain County, MO (Zone 6b) Moderate season
198 days
Last Spring Frost April 10
198 growing days
First Fall Frost October 25
Share this guide:

Audrain County Soil Profile

Soil Type

Silt Loam

Soil pH

5.5-6.6

Drainage

Well Drained

Monthly Watering Guide for Celery

Celery needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.

Month Celery Needs Rainfall You Supplement Action
Jan 1.6" 0" ❄️ Dormant
Feb 1.6" 0" ❄️ Dormant
Mar 2.6" 0" ❄️ Dormant
Apr 4.3" 3.5" 0.8" 💧 Light watering
May 4.3" 4.3" 0" ✅ Rainfall sufficient
Jun 4.3" 4.4" 0" ✅ Rainfall sufficient
Jul 4.3" 4.7" 0" ✅ Rainfall sufficient
Aug 4.3" 3.6" 0.7" 💧 Light watering
Sep 4.3" 3.1" 1.2" 💧 Light watering
Oct 4.3" 3.1" 1.2" 💧 Light watering
Nov 2.6" 0" ❄️ Dormant
Dec 2.1" 0" ❄️ Dormant

Water needs are for active growing months only (Apr–Oct in Audrain County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.

Celery Planting Timeline — Audrain County, MO

Celery Planting Calendar

Activity When Date Range
Start Indoors March 6 Mar 6 – Mar 20
Transplant Outdoors April 10 Apr 10 – Apr 24
Direct Sow March 27 Mar 27 – Apr 17
Harvest July 3 Jul 3 – Aug 28
Fall Sowing August 16 Aug 16 – Aug 30

Plant 1" deep · 15" apart · Rows 24" apart

Month-by-Month Timeline

MonthActivities
January
February
March Start Indoors Direct Sow
April Transplant Outdoors Direct Sow
May
June
July Harvest
August Fall Sowing Harvest
September
October
November
December
Share this guide:

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

High — keep soil consistently moist

📅 Days to Maturity

80–120 days

🧪 Soil pH

Needs 6–7 · Your soil: N/A

🗺️ USDA Zone

Zone 6b

📆 Growing Season

198 days in Audrain County

Growing Tips for Audrain County

Start seeds indoors 10-12 weeks before last frost. Keep soil consistently moist and never let it dry out. Blanch stalks by mounding soil or using collars for milder flavor.

Companion Planting

Good Companions

Avoid Planting Near

  • Carrots
  • Parsnip

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Celery in Audrain County, MO?

Audrain County is in Zone 6b with an average last frost of April 10. Plan your Celery planting based on this frost date — see the calendar above for exact timing.

What planting zone is Audrain County, MO?

Audrain County, Missouri is in USDA Hardiness Zone 6b. The average last spring frost is April 10 and first fall frost is October 25.

When should I plant Celery in Audrain County County, ?

In Audrain County County, , plant Celery after the last frost (around April 10) and before the first frost (around October 25). Best results when soil holds above 50°F.

What growing zone is Audrain County County, for Celery?

Audrain County County sits in USDA Zone 6b. Celery grows reliably in zones 2a through 10b, so it's a good fit here.

Can Celery grow in Audrain County County's climate?

Yes — Celery grows well in Audrain County County's temperate climate. Audrain County County averages a 198-day frost-free season, with last frost around April 10 and first frost around October 25.

🌱

Your Audrain County Garden Planner — Free

A 22-page printable planner built for Audrain County (Zone 6b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Audrain County, MO. Local conditions may vary. Last updated: June 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.