When to plant Che Fruit in Atchison County County,
Plant Che Fruit in Atchison County County during the brief May 13–May 27 window. With 174 frost-free days, fall plantings can't mature before October 13.
When to Plant Che Fruit in Atchison County, MO
Top priorities for Atchison County, Missouri gardeners in June
Each item below is timed to Atchison County, Missouri's frost dates and soil temperatures. Skip nothing, stress about nothing.
Che fruit (Chinese mulberry) is a small, cold-hardy tree producing round, red fruits with a sweet, watermelon-fig flavor. It is an underutilized fruit tree with great potential.
Atchison County, Missouri is in USDA Zone 5b. The average last spring frost is April 22 and the first fall frost is October 13, giving you a growing season of approximately 174 days.
At an elevation of 1,206 feet, Atchison County receives approximately 39.7 inches of rainfall annually with predominantly silt loam soil. Summer highs average 83°F, so choose short-season varieties of Che Fruit to ensure they mature before fall.
Atchison County Soil Profile
Soil Type
Silt Loam
Soil pH
5.3-6.8
Drainage
Well Drained
Che Fruit Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Atchison County
How your county's soil matches Che Fruit's growing requirements.
Soil pH
Your soil pH (5.3–6.8) overlaps with Che Fruit's range (6.0–7.5), though not a perfect match.
Soil Texture
The silt loam soil in Atchison County is excellent for Che Fruit — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (3.0%). Annual compost additions will help Che Fruit.
How to Plant Che Fruit
Che Fruit Water Budget
Monthly Watering Guide for Che Fruit
Che Fruit needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Che Fruit Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 1.5" | 0" | ❄️ Dormant |
| Feb | — | 1.9" | 0" | ❄️ Dormant |
| Mar | — | 3.1" | 0" | ❄️ Dormant |
| Apr | 4.3" | 3.5" | 0.8" | 💧 Light watering |
| May | 4.3" | 4.4" | 0" | ✅ Rainfall sufficient |
| Jun | 4.3" | 4.6" | 0" | ✅ Rainfall sufficient |
| Jul | 4.3" | 4.2" | 0.1" | 💧 Light watering |
| Aug | 4.3" | 4.3" | 0" | ✅ Rainfall sufficient |
| Sep | 4.3" | 4.1" | 0.2" | 💧 Light watering |
| Oct | 4.3" | 3" | 1.3" | 💧 Light watering |
| Nov | — | 3.2" | 0" | ❄️ Dormant |
| Dec | — | 2.1" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Apr–Oct in Atchison County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Che Fruit Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Che Fruit Planting Timeline — Atchison County, MO
Che Fruit Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Transplant Outdoors | May 13 | May 13 – May 27 |
· 120" apart · Rows 144" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | — |
| February | — |
| March | — |
| April | — |
| May | Transplant Outdoors |
| June | — |
| July | — |
| August | — |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Full Sun (6-8+ hours)
💧 Water
1"/week · Only during dry spells
📅 Days to Maturity
1095–1825 days
🧪 Soil pH
Needs 6–7.5 · Your soil: acceptable
🗺️ USDA Zone
Zone 5b
📆 Growing Season
174 days in Atchison County
Growing Tips for Che Fruit in Atchison County
Direct sow Che Fruit outdoors after April 22 in Atchison County when soil has warmed and frost danger has passed.
Your 174.0-day growing season in Atchison County is tight for Che Fruit (1095.0-1825.0 days to maturity). Start indoors and choose early-maturing varieties.
General growing tips
Plant in well-drained soil. A male pollinator is needed for seeded fruit, but seedless fruit can set parthenocarpically. Minimal pruning required. Fruits ripen in late summer.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Che Fruit in Other Locations
Frequently Asked Questions
When should I plant Che Fruit in Atchison County, MO?
Atchison County is in Zone 5b with an average last frost of April 22. Plan your Che Fruit planting based on this frost date — see the calendar above for exact timing.
What planting zone is Atchison County, MO?
Atchison County, Missouri is in USDA Hardiness Zone 5b. The average last spring frost is April 22 and first fall frost is October 13.
When should I plant Che Fruit in Atchison County, ?
In Atchison County, , plant Che Fruit after the last frost (around April 22) and before the first frost (around October 13). Best results when soil holds above 50°F.
What growing zone is Atchison County, for Che Fruit?
Atchison County sits in USDA Zone 5b. Che Fruit grows reliably in zones 5a through 10b, so it's a good fit here.
Can Che Fruit grow in Atchison County's climate?
Yes — Che Fruit grows well in Atchison County's temperate climate. Atchison County averages a 174-day frost-free season, with last frost around April 22 and first frost around October 13.
Your Atchison County Garden Planner — Free
A 22-page printable planner built for Atchison County (Zone 5b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.