Blog

When to plant Yarrow in Andrew County, MO

Andrew County's spring Yarrow window runs April 17 through May 8. time plantings around the expected last-frost window for best survival.

When to Plant Yarrow in Andrew County, MO

Achillea millefolium (Yarrow) is a tough, drought-tolerant native perennial with aromatic finely-divided foliage and broad flat-topped flower clusters that serve as a landing platform for hundreds of beneficial insect species. Available in white (the species type) and a wide range of cultivars spanning yellow, gold, pink, salmon, and deep red. Spreads by rhizome to form ground-covering colonies; blooms from late spring through midsummer with reblooming into fall if deadheaded. Exceptional in hot, dry sites where other perennials fail.

Andrew County, Missouri is in USDA Zone 6a. The average last spring frost is April 17 and the first fall frost is October 18, giving you a growing season of approximately 184 days.

At an elevation of 1,292 feet, Andrew County receives approximately 37.4 inches of rainfall annually with predominantly silt loam soil. Summer highs average 85°F, providing good warmth for Yarrow during the growing season.

Perennial Blooms in Summer Pollinator-friendly Deer-resistant Good for cutting Fragrant
Andrew County, MO (Zone 6a) Moderate season
184 days
Last Spring Frost April 17
184 growing days
First Fall Frost October 18

Andrew County Soil Profile

Soil Type

Silt Loam

Soil pH

6.0-7.0

Drainage

Well Drained

Yarrow Planting Timeline — Andrew County, MO

Yarrow Planting Calendar

Activity When Date Range
Start Indoors February 13 Feb 13 – Feb 27
Transplant Outdoors April 24 Apr 24 – May 8
Direct Sow April 17 Apr 17 – May 8
Bloom July 3 Jul 3 – Oct 23

· 18" apart · Rows 24" apart

Month-by-Month Timeline

MonthActivities
January
February Start Indoors
March
April Transplant Outdoors Direct Sow
May Transplant Outdoors Direct Sow
June
July Bloom
August Bloom
September Bloom
October Bloom
November
December

Growing Conditions

☀️ Sun

Full Sun (6-8+ hours)

💧 Water

Low — drought tolerant

📅 Days to Maturity

60–90 days

🧪 Soil pH

Needs 5.5–7 · Your soil: N/A

🗺️ USDA Zone

Zone 6a

📆 Growing Season

184 days in Andrew County

Growing Tips for Andrew County

Start seeds indoors 8–10 weeks before last frost; seeds need light for germination — press onto soil surface, do not cover. Direct sow after last frost or divide established clumps in spring or fall. Thrives in poor, well-drained soil — rich soil and high fertility cause floppy stems and reduce flower count. Avoid overwatering; excellent drought tolerance once established. Deadhead spent clusters to encourage rebloom. Divide every 2–3 years to prevent center die-out and control spread. Year 2+ plants bloom most heavily; first-year plants may produce limited flowers. Dried flowers retain color well for arrangements.

Companion Planting

Good Companions

Check more plant combinations with our Companion Planting Checker →

Frequently Asked Questions

When should I plant Yarrow in Andrew County, MO?

Andrew County is in Zone 6a with an average last frost of April 17. Plan your Yarrow planting based on this frost date — see the calendar above for exact timing.

What planting zone is Andrew County, MO?

Andrew County, Missouri is in USDA Hardiness Zone 6a. The average last spring frost is April 17 and first fall frost is October 18.

When should I plant Yarrow in Andrew County, MO?

In Andrew County, MO, plant Yarrow after the last frost (around April 17) and before the first frost (around October 18). Best results when soil holds above 50°F.

What growing zone is Andrew County, MO for Yarrow?

Andrew County sits in USDA Zone 6a. Yarrow grows reliably in zones 3a through 9b, so it's a good fit here.

Can Yarrow grow in Andrew County's climate?

Yes — Yarrow grows well in Andrew County's temperate climate. Andrew County averages a 184-day frost-free season, with last frost around April 17 and first frost around October 18.

🌱

Your Andrew County Garden Planner — Free

A 22-page printable planner built for Andrew County (Zone 6a). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.

Instant PDF download. No spam, unsubscribe any time.

Data sources: USDA Plant Hardiness Zone Map (2023), NOAA 30-Year Climate Normals. Frost dates are based on 50% probability averages for Andrew County, MO. Local conditions may vary. Last updated: June 2026.

Sources & credits

Every number on this page traces back to a primary horticulture or government data source. Click through to verify.