When to Plant Shiso in Humphreys County, MS
May in the garden — Humphreys County, Mississippi
We've pulled the most time-sensitive tasks for Humphreys County, Mississippi this May and put them front and centre. Tackle them in order.
-
Collect shiso at their peak
If you can't use it all right away, check the food-preservation section of your planner.
June prep starts now
- First harvests: shiso
Shiso (perilla) is a fragrant Japanese herb with large, ruffled leaves in green or purple varieties. It has a unique flavor combining mint, basil, and anise.
Humphreys County, Mississippi is in USDA Zone 8b. The average last spring frost is March 6 and the first fall frost is November 18, giving you a growing season of approximately 257 days.
At an elevation of 303 feet, Humphreys County receives approximately 57.8 inches of rainfall annually with predominantly clay loam soil. Summer highs average 93°F, providing good warmth for Shiso during the growing season. Clay soil retains moisture well for Shiso, but amend with compost to improve drainage and prevent root rot. Ample rainfall means less supplemental watering, but ensure good drainage to prevent Shiso root diseases.
Humphreys County Soil Profile
Soil Type
Clay Loam
Soil pH
5.5-6.8
Drainage
Well Drained
Plant Planting Risk Windows
Percentages indicate frost risk at transplant. The 70% safe window means there is a 30% chance of frost after transplant — suitable for cold-hardy crops or gardeners with frost protection. The 90% safe window is best for tender plants.
Soil Compatibility in Humphreys County
How your county's soil matches Shiso's growing requirements.
Soil pH
Your soil pH (5.5–6.8) is within Shiso's preferred range (5.5–7.0).
Soil Texture
The clay loam soil in Humphreys County is excellent for Shiso — good drainage, moisture retention, and nutrient holding capacity.
Organic Matter
Organic matter is moderate (2.3%). Annual compost additions will help Shiso.
How to Plant Shiso
Succession Planting Shiso
Sow every 5.7 weeks. Last sowing by Sep 09 to harvest before frost.
Plant Water Budget
Monthly Watering Guide for Shiso
Shiso needs approximately 1 inches of water per week (4.3" per month). Here's how your county's rainfall compares month by month.
| Month | Shiso Needs | Rainfall | You Supplement | Action |
|---|---|---|---|---|
| Jan | — | 4.9" | 0" | ❄️ Dormant |
| Feb | — | 4.5" | 0" | ❄️ Dormant |
| Mar | 4.3" | 5.6" | 0" | ✅ Rainfall sufficient |
| Apr | 4.3" | 4.1" | 0.2" | 💧 Light watering |
| May | 4.3" | 4.8" | 0" | ✅ Rainfall sufficient |
| Jun | 4.3" | 4.8" | 0" | ✅ Rainfall sufficient |
| Jul | 4.3" | 6.4" | 0" | ✅ Rainfall sufficient |
| Aug | 4.3" | 5.9" | 0" | ✅ Rainfall sufficient |
| Sep | 4.3" | 4.1" | 0.2" | 💧 Light watering |
| Oct | 4.3" | 3.8" | 0.5" | 💧 Light watering |
| Nov | 4.3" | 4.5" | 0" | ✅ Rainfall sufficient |
| Dec | — | 4.4" | 0" | ❄️ Dormant |
Water needs are for active growing months only (Mar–Nov in Humphreys County). Supplement amounts are based on average rainfall — actual needs vary with temperature, soil, and mulching.
Shiso Heat Requirements (GDD)
What are Growing Degree Days (GDD)?
Growing Degree Days measure the total warmth your plants receive during the growing season. Think of it as a "heat bank" — every day above 50°F deposits warmth that helps your plants grow.
Each plant needs a certain amount of accumulated heat to mature. If your county provides more GDD than the plant needs, it's a great fit. If it's close, you may want to choose faster-maturing varieties or start seeds indoors to get a head start.
Shiso Planting Timeline — Humphreys County, MS
Shiso Planting Calendar
| Activity | When | Date Range |
|---|---|---|
| Start Indoors | January 16 | Jan 16 – Jan 30 |
| Transplant Outdoors | March 20 | Mar 20 – Apr 3 |
| Direct Sow | March 13 | Mar 13 – Apr 3 |
| Harvest | May 15 | May 15 – Jul 10 |
Plant 0.5" deep · 8" apart · Rows 12" apart
Month-by-Month Timeline
| Month | Activities |
|---|---|
| January | Start Indoors |
| February | — |
| March | Transplant Outdoors Direct Sow |
| April | Transplant Outdoors Direct Sow |
| May | Harvest |
| June | Harvest |
| July | Harvest |
| August | — |
| September | — |
| October | — |
| November | — |
| December | — |
Growing Conditions
☀️ Sun
Partial Shade (3-6 hours)
💧 Water
1"/week · Only during dry spells
📅 Days to Maturity
50–70 days
🧪 Soil pH
Needs 5.5–7 · Your soil: ideal
🗺️ USDA Zone
Zone 8b
📆 Growing Season
257 days in Humphreys County
Growing Tips for Shiso in Humphreys County
Direct sow Shiso outdoors after March 06 in Humphreys County when soil has warmed and frost danger has passed.
With Humphreys County's clay soil (29% clay), work in 3-4 inches of compost before planting Shiso. Avoid tilling when soil is wet to prevent compaction.
General growing tips
Direct sow after last frost or start indoors. Both green and red varieties are available. Pinch tips to encourage bushiness. Self-sows prolifically; deadhead to control.
Companion Planting
Good Companions
Check more plant combinations with our Companion Planting Checker →
Shiso in Other Locations
Frequently Asked Questions
When should I plant Shiso in Humphreys County, MS?
Humphreys County is in Zone 8b with an average last frost of March 6. Plan your Shiso planting based on this frost date — see the calendar above for exact timing.
What planting zone is Humphreys County, MS?
Humphreys County, Mississippi is in USDA Hardiness Zone 8b. The average last spring frost is March 6 and first fall frost is November 18.
Your Humphreys County Garden Planner — Free
A 24-page printable planner built for Humphreys County (Zone 8b). Planting dates, a month-by-month schedule, harvest log, seed inventory, and succession charts — all dialed in for your exact growing season.